ML20149D567

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept CP-87-13 Re Class 1E Separation Violations.Initially Reported on 880111.Replacement of Cable Tray Covers Will Be Completed as Part of Post Const Hardware Validation Program
ML20149D567
Person / Time
Site: Comanche Peak  
Issue date: 02/04/1988
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-13, TXX-88184, NUDOCS 8802090543
Download: ML20149D567 (1)


Text

_ _ _ _ _

MEE log # TXX-88184 File # 10110

._=

=

903.9

' # 0 '" "'

tilELECTRIC February 4, 1988 mmm c. coma t m wan n a ra,aam U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 CLASS 1E SEPARATION VIOLATIONS SDAR:

CP-87-13 (FINAL REPORT)

Gentlemen:

On January 11, 1988, we notified you of a reportable deficiency under the provisions of 10CFR50.55(e) concerning Class 1E separation violations. This report documented separation violations resulting from non-safety related cable tray covers removed and/or modified after final acceptance by CPSES Quality Control.

Replacement of cable tray covers will be completed as part of the Post Construction Hardware Validation Program (PCHVP) using Field Verification Method CPE-SWEC-FVM-EE/ME/IC/CS-088, "Electrical Separation."

The completion of this issue will be accomplished commensurate with the completion of the PCHVP.

Records will be available for your inspector's review at that time.

Very truly yours, W. G. Counsil By: b W. b_m> -

J6hn W. Beck Vice President, Nuclear Engineering DAR/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) ee0209o543ey20j43 og q

PDR ADOCK pgg p

$g s

p ao n, w.,,s,,-,

a u w w. m.,n.m