Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151U524 + (09:58:11, 11 December 2024)
- ML20151U523 + (09:58:12, 11 December 2024)
- ML20151U519 + (09:58:12, 11 December 2024)
- B12881, Application for Amend to License DPR-65,changing Tech Spec 3.4.4.b to Read, at Least Two Groups of Pressurizer Heaters Each Having Capacity of at Least 130 Kw Capable of Being Supplied by Emergency Power. Fee Paid + (09:58:13, 11 December 2024)
- ML20151U518 + (09:58:13, 11 December 2024)
- ML20151U515 + (09:58:15, 11 December 2024)
- ML20151U516 + (09:58:15, 11 December 2024)
- 05000317/LER-1988-008, :on 880716,unit Placed Into Mode 2 While Tech Specs Limiting Condition for Operation of Watertight Doors Not Satisfied.Caused by Personnel Error.Outsider Operator Log Modified & Training Sessions Conducted + (09:58:17, 11 December 2024)
- ML20151U513 + (09:58:18, 11 December 2024)
- ML20151U510 + (09:58:19, 11 December 2024)
- IR 05000461/1986002 + (09:58:22, 11 December 2024)
- ML20151U507 + (09:58:23, 11 December 2024)
- ML20151U506 + (09:58:24, 11 December 2024)
- IR 05000259/1987046 + (09:58:25, 11 December 2024)
- ML20151U503 + (09:58:25, 11 December 2024)
- ML20151U501 + (09:58:26, 11 December 2024)
- ML20151U499 + (09:58:27, 11 December 2024)
- ML20151U497 + (09:58:27, 11 December 2024)
- ML20151U496 + (09:58:28, 11 December 2024)
- ML20151U493 + (09:58:29, 11 December 2024)
- ML20151U495 + (09:58:29, 11 December 2024)
- NSD-NRC-98-5781, Informs That W Determined That AP600 FSER Contains No Proprietary Info + (09:58:30, 11 December 2024)
- ML20151U491 + (09:58:31, 11 December 2024)
- ML20151U490 + (09:58:31, 11 December 2024)
- ML20151U488 + (09:58:32, 11 December 2024)
- ML20151U487 + (09:58:33, 11 December 2024)
- IR 05000155/1985021 + (09:58:40, 11 December 2024)
- ML20151U485 + (09:58:40, 11 December 2024)
- ML20151U483 + (09:58:41, 11 December 2024)
- ML20151U484 + (09:58:41, 11 December 2024)
- ML20151U482 + (09:58:43, 11 December 2024)
- ML20151U477 + (09:58:44, 11 December 2024)
- PNO-III-86-009B, on 860206,small Earthquake Occurred.No After Shock Felt & No Instrumentation Registered Tremor. Earthquake on 860131 Resulted in No Structural Damage to Plant + (09:58:44, 11 December 2024)
- CEO-88-109, Forwards Power Ascension Mid-Term Assessment of Plant Operations & Maint & Scheduling Activities. Assessment Concludes That Util Restart Power Ascension Objectives & Adjustments Can Be Made W/O Compromising Safety + (09:58:45, 11 December 2024)
- ML20151U475 + (09:58:45, 11 December 2024)
- ML20151U474 + (09:58:46, 11 December 2024)
- ML20151U472 + (09:58:47, 11 December 2024)
- ML20151U471 + (09:58:47, 11 December 2024)
- ML20151U467 + (09:58:48, 11 December 2024)
- ML20151U469 + (09:58:48, 11 December 2024)
- ML20151U466 + (09:58:49, 11 December 2024)
- ML20151U465 + (09:58:49, 11 December 2024)
- ML20151U463 + (09:58:51, 11 December 2024)
- ML20151U464 + (09:58:51, 11 December 2024)
- ML20151U462 + (09:58:52, 11 December 2024)
- ML20151U461 + (09:58:53, 11 December 2024)
- ML20151U459 + (09:58:53, 11 December 2024)
- ML20151U458 + (09:58:54, 11 December 2024)
- IR 05000263/1985024 + (09:58:55, 11 December 2024)
- 05000338/LER-1988-019-02, :on 880621,design Change Package Relocated Two Solenoid Operated Valves from Main Steam Valve House to Quench Spray Pump House.Training Will Be Provided to All Ae Performing Plant Mods + (09:58:57, 11 December 2024)
- ML20151U452 + (09:58:58, 11 December 2024)
- ML20151U450 + (09:58:58, 11 December 2024)