Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151Z169 + (08:34:38, 11 December 2024)
- ML20151Z161 + (08:34:42, 11 December 2024)
- ML20151Z158 + (08:34:43, 11 December 2024)
- ML20151Z157 + (08:34:43, 11 December 2024)
- NRC-88-0198, Forwards Response to SALP 9 Board Rept 50-341/88-01. Guidelines Currently Being Developed to Assist Operators in Assessing Equipment Operability Requirements Particularly in Area of Dependence on Support Sys + (08:34:45, 11 December 2024)
- ML20151Z150 + (08:34:45, 11 December 2024)
- IR 05000102/2009005 + (08:34:46, 11 December 2024)
- ML20151Z145 + (08:34:47, 11 December 2024)
- 05000213/LER-1986-004, :on 860105,RCS Overpressure Protection Sys Would Not Permit Opening of Four motor-operated Valves. Caused by Failure of Temp Bistable for Valves 596 & 598 to Reset.Temp Bistable Recalibr & Retested + (08:34:48, 11 December 2024)
- ML20151Z142 + (08:34:49, 11 December 2024)
- ML20151Z140 + (08:34:50, 11 December 2024)
- ML20151Z139 + (08:34:50, 11 December 2024)
- ML20151Z137 + (08:34:51, 11 December 2024)
- IR 05000528/1986001 + (08:34:52, 11 December 2024)
- ML20151Z126 + (08:34:53, 11 December 2024)
- L-88-357, Forwards Rev 3 to Safeguards Contingency Plan,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR2.790(d)) + (08:34:55, 11 December 2024)
- ML20151Z125 + (08:34:55, 11 December 2024)
- ML20151Z122 + (08:34:56, 11 December 2024)
- ML20151Z121 + (08:34:57, 11 December 2024)
- ML20151Z116 + (08:34:58, 11 December 2024)
- ML20151Z114 + (08:34:59, 11 December 2024)
- ML20151Z115 + (08:34:59, 11 December 2024)
- W3P88-1282, Forwards, Inservice Insp Summary Rept,First Interval,First Period,Second Refueling,Apr-May 1988 + (08:35:00, 11 December 2024)
- ML20151Z112 + (08:35:00, 11 December 2024)
- ML20151Z110 + (08:35:03, 11 December 2024)
- ML20151Z109 + (08:35:04, 11 December 2024)
- ML20151Z108 + (08:35:05, 11 December 2024)
- ML20151Z107 + (08:35:05, 11 December 2024)
- ML20151Z105 + (08:35:06, 11 December 2024)
- 05000354/LER-1987-036-01, :on 870804,channel a Class 1E 125 Volt DC Loads from Distribution on Panel a de-energized During Operational Condition 1.Root Cause Not Determined.Breakers for Affected Sys Opened & Reset.Procedures Revised + (08:35:08, 11 December 2024)
- ML20151Z102 + (08:35:09, 11 December 2024)
- ML20151Z101 + (08:35:09, 11 December 2024)
- ML20151Z100 + (08:35:10, 11 December 2024)
- ML20151Z096 + (08:35:11, 11 December 2024)
- ML20151Z097 + (08:35:11, 11 December 2024)
- ML20151Z094 + (08:35:12, 11 December 2024)
- ML20151Z095 + (08:35:12, 11 December 2024)
- NSD-NRC-98-5754, Forwards non-proprietary Versions of Revs 3-5 to WCAP-14808 & Proprietary Version of Rev 5 to WCAP-14807, Notrump Final Validation Rept for AP600, in Form of Replacement Pages. Proprietary Encl Withheld + (08:35:13, 11 December 2024)
- 05000498/LER-1988-026, :on 880330,reactor Trip & Safety Injection Sequence Initiated Due to Partial Offsite Power Loss.Caused by Personnel Error & Design Inadequacy.Event Incorporated in Training Session & Protection Sys Evaluated + (08:35:15, 11 December 2024)
- ML20151Z081 + (08:35:17, 11 December 2024)
- ML20151Z079 + (08:35:17, 11 December 2024)
- ML20151Z077 + (08:35:18, 11 December 2024)
- 05000409/LER-1986-003, :on 860112,reactor Scram Occurred.Caused by Adjustment of Seal Supply Valve When Seal Injection Supply Line to CRD Discovered Isolated.Importance of Performance of Duties Emphasized + (08:35:20, 11 December 2024)
- ML20151Z071 + (08:35:21, 11 December 2024)
- ML20151Z073 + (08:35:21, 11 December 2024)
- ML20151Z070 + (08:35:22, 11 December 2024)
- ML20151Z069 + (08:35:23, 11 December 2024)
- ML20151Z067 + (08:35:23, 11 December 2024)
- ML20151Z066 + (08:35:24, 11 December 2024)
- ML20151Z064 + (08:35:25, 11 December 2024)
- ML20151Z062 + (08:35:26, 11 December 2024)
- ML20151Z060 + (08:35:27, 11 December 2024)