ML20151Z158
| ML20151Z158 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/11/1985 |
| From: | Corbin McNeil Public Service Enterprise Group |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18092B024 | List: |
| References | |
| RTR-REGGD-01.099, RTR-REGGD-1.099 NUDOCS 8602140078 | |
| Download: ML20151Z158 (2) | |
Text
I A-Public Service Electric and Gas Cornpany Corbin A. McNelli, Jr.
Public Service Electnc and Gas Company P O. Box 236.Hancocks Bridge.NJ 08038 609 339-4800 Vice President-Nuclear June 11, 1985 U.
S. Nuclear Regulatory Commission Office ~of Nuclear Reactor Regulation Washington, D.
C.
20555 Attention:
Mr. Steven A. Varga, Chief Operating Reactors Branch, No. 1
Dear Mr. Varga:
REACTOR VESSEL MATERIAL SURVEILLANCE SALEM GENERATING STATION NO. 1 UNIT DOCKET NO. 50-272 Pursuant to the requirements of Appendix 11 to 10 CFR 50, PSE&G hereby submits WCAP - 10694, " Analysis of Capsule Y from the Salem Unit 1 Reactor Vessel Radiation Surveillance Program."
This report includes data-required by ASTM-E-185-1973.
The test results show that the increases in the transition temperatures of the weld metal and base metal were within the "best estimate" values predicted by the methods of Regulatory Guide 1.99 Revision 1.
.ilowever, since the surveillance weld metal is not identical to the intermediate-to-lower shell seam, WCAP-10694 bases the new heatup and cooldown limit curves on the more conservative
" upper limit" values predicted by Regulatory Guide 1.99.
Should you have any questions, please contact us.
Sincerely, Attachment
4 0
Mr. Steven A. Varga
-2 6/11/85 C
Mr. Donald C.
Fischer Licensing Project Manager Mr. Thomas J.
Kenny Senior Resident Inspector l
I f
i l
l l
l l
l l
1
-)