Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153C137 + (08:11:50, 11 December 2024)
- ML20153C132 + (08:11:51, 11 December 2024)
- ML20153C134 + (08:11:51, 11 December 2024)
- ML20153C130 + (08:11:52, 11 December 2024)
- ML20153C128 + (08:11:53, 11 December 2024)
- ML20153C129 + (08:11:53, 11 December 2024)
- ML20153C126 + (08:11:54, 11 December 2024)
- B12903, Forwards Inservice Insp Rept,1987 Refueling Outage + (08:11:55, 11 December 2024)
- ML20153C125 + (08:11:55, 11 December 2024)
- ML20153C123 + (08:11:56, 11 December 2024)
- IR 05000461/1985062 + (08:11:57, 11 December 2024)
- ML20153C119 + (08:11:57, 11 December 2024)
- ML20153C115 + (08:11:58, 11 December 2024)
- ML20153C117 + (08:11:58, 11 December 2024)
- ML20153C114 + (08:11:59, 11 December 2024)
- PNO-IV-88-034, on 880503,licensee Informed by Personnel Dosimetry Vendor That One of Employee First Quarter 1988 TLD Received 0.255 Rem (Gamma) & 105 Rem (Neutron).Investigation Concluded That Employee Did Not Actually Received Dose + (08:12:00, 11 December 2024)
- ML20153C111 + (08:12:00, 11 December 2024)
- ML20153C110 + (08:12:01, 11 December 2024)
- ML20153C108 + (08:12:02, 11 December 2024)
- ML20153C109 + (08:12:02, 11 December 2024)
- IR 05000249/1986003 + (08:12:03, 11 December 2024)
- ML20153C106 + (08:12:03, 11 December 2024)
- ML20153C104 + (08:12:04, 11 December 2024)
- ML20153C100 + (08:12:05, 11 December 2024)
- ML20153C103 + (08:12:05, 11 December 2024)
- ML20153C099 + (08:12:06, 11 December 2024)
- ML20153C097 + (08:12:07, 11 December 2024)
- ML20153C094 + (08:12:07, 11 December 2024)
- ML20153C093 + (08:12:08, 11 December 2024)
- ML20153C091 + (08:12:09, 11 December 2024)
- ML20153C085 + (08:12:10, 11 December 2024)
- ML20153C086 + (08:12:10, 11 December 2024)
- ML20153C083 + (08:12:11, 11 December 2024)
- ML20153C084 + (08:12:11, 11 December 2024)
- ML20153C082 + (08:12:12, 11 December 2024)
- ML20153C081 + (08:12:13, 11 December 2024)
- 05000341/LER-1988-028, :on 880726,HPCI Pump Discharge Inboard Isolation Valve Failed to Open.Caused by Grounded Contactor Coil at Valve Torque Switch by Heater Bracket.Heater Assembly & Nine Other Valves Removed + (08:12:14, 11 December 2024)
- 3F0186-20, Responds to Violations Noted in Insp Rept 50-302/85-42. Corrective Actions:Sightglass on Governor end-bearing Reservoir Recalibr & Bearing Replaced & Sightglass Calibr Instructions Put Into CR-3 Drawing Sys + (08:12:15, 11 December 2024)
- 05000341/LER-1988-027, :on 880726,technician Accidentally Shorted Across Two Terminals Which Actuated Div I of Emergency Equipment Cooling Water & Emergency Equipment Svc Water Sys. Caused by Personnel Error.Technician Counseled + (08:12:17, 11 December 2024)
- ML20153C075 + (08:12:18, 11 December 2024)
- 05000324/LER-1988-011-03, :on 880725,reactor RHR Shutdown Cooling Sys Primary Containment Isolation Sys Inboard Isolation Valve Would Not Open.Caused by Electrical Malfunction.Wiring of Instrument Reconfigured to Utilize Switch 2 + (08:12:20, 11 December 2024)
- ML20153C072 + (08:12:21, 11 December 2024)
- ML20153C073 + (08:12:21, 11 December 2024)
- ML20153C071 + (08:12:22, 11 December 2024)
- ML20153C069 + (08:12:22, 11 December 2024)
- 05000324/LER-1988-012, :on 880725,HPCI Declared Inoperable Due to Inability to Determine Environ Qualification of Electrical Termination/Splices of Auxiliary Oil Pump.Caused by Inadequate Workmanship When Splices Made + (08:12:24, 11 December 2024)
- ML20153C067 + (08:12:25, 11 December 2024)
- ML20153C063 + (08:12:26, 11 December 2024)
- NLS8800421, Discusses Schedule Re Pilot Study for HPCI Sys Design Basis Document,Per 871125 Response to Insp Rept 50-298/87-10 + (08:12:27, 11 December 2024)
- ML20153C060 + (08:12:27, 11 December 2024)
- ML20153C058 + (08:12:29, 11 December 2024)