Text
. _ _ _ _ _ _ _ _ _ - _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
.-.
..
...
.
APR 2 8196$1
Docket Nos. 50-277
License Nos. OPR-44
50-278
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President
Nuclear
2301 Market Street
'
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Nos. 50-277/88-08 and 50-278/88-08
'
This letter refers to the routine safety inspection conducted by Mr. E. H. Gray
and Mr. H. J. Kaplan of this office on March 14-18, 1988 at the Peach Bottom
Power Station, Delta, Pennsylvania. Mr. Gray discussed the findings of the
inspection with Mr. D. Smith of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed vith this letter. Within these areas, the
inspection examined the piping replacement program and consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that drawing control was
not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
Specifically, Unit 2
,
'
emergency service water piping was being fabricated to sketches that were not
in the drawing control system. This violation has been categorized by severity
level in accordance with the "General Statement of Policy and Procedure for NRC
Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy). You are
,
required to respond to this letter and in preparing your response, you should
follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely.
ORIGINAL SIGNm BY
WILUAM V. JOHhSTON
<
Dohkhhh$$$77
William V. .lohnston, Acting Director
,
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
\\
2.
NRC Region ! Inspection Report Nos. 50-277/88-08 and 50-278/88-08
\\
s
.
-
.
.
.
e
Philadelphia Electric Company
2
-
cc w/encis:
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
. Robert J. Bores, DRSS
J. Linville, Chief, DRP Section 2A
C. Y Cheng, NRR
'
W0
Clk
('RI:DRS
RI:DRS
RI:DRS
RI:DRS
Gray /msrw
Kaplan
Strosnider
Durr
4//9/88
4/// /88
4////88
4/17/88
0FFICIAL RECORD COPY
IR PB 88-08 - 0002.0.0
04/14/88
s
-
.
- -