Safety Evaluation Re Licensee 870731 Comments on Sser 5, Section 9.5.1.Fire Protection in Cable Rooms & Containment Constitutes Acceptable Deviations from Branch Technical Position Cmeb 9.5-1ML20153C091 |
Person / Time |
---|
Site: |
Beaver Valley |
---|
Issue date: |
08/17/1988 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20151F845 |
List: |
---|
References |
---|
NUDOCS 8808310227 |
Download: ML20153C091 (5) |
|
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20202B8571997-11-18018 November 1997 SE Approving Relief Requests for Second 10-Yr Interval for Pumps & Valves Inservice Testing Program for Beaver Valley Power Station,Unit 2 ML20199F4641997-11-13013 November 1997 SER Related to Reactor Pressure Vessel,Pressurized Thermal Shock Assessment for Beaver Valley Power Station,Unit 2 ML20212G4961997-10-28028 October 1997 SER Accepting Pressurized Thermal Shock Assessment for Beaver Valley Unit 2 Reactor Vessel ML20217J5311997-10-0808 October 1997 Safety Evaluation Re First,Second & Third 10-year Interval Inservice Inspection Program Plan Requests for Relief for Plant,Units 1 & 2 ML20217J5891997-10-0707 October 1997 Safety Evaluation Related to Reactor Pressure Vessel Pressurized Thermal Shock for Beaver Valley Power Station, Unit 1 ML20211D8441997-09-17017 September 1997 SER Approving SG 90-day Rept Submitted by Duquesne Light Co for Beaver Valley Power Station,Unit 1,per GL 95-05 ML20216J5861997-09-0404 September 1997 Safety Evaluation Re Third 10-year IST Program.Approves Valve Relief Requests 1,3 & 4.Valve Relief Request 2 Not Required.Authorizes Pump Relief Requests 1,2,3 & 4 ML20148E1051997-05-28028 May 1997 Safety Evaluation Supporting Amend 204 to License DPR-66 ML20137X1441997-04-0909 April 1997 Safety Evaluation Supporting Proposed Rev to RPV Surveillance Capsule Withdrawal Schedule ML20057B0641993-09-13013 September 1993 Safety Evaluation Granting Relief for IST of Reactor Plant Component Cooling Water Pumps of Plant ML20056F3561993-08-12012 August 1993 Safety Evaluation Granting Licensee 930607 Request for Relief from Certain ASME Code Requirements for Temporary Repairs to Svc Water Sys ML20126H7601992-12-30030 December 1992 Safety Evaluation Approving Valve Relief Requests VRR-27, VRR-43 & VRR-44 & Will Provide Reasonable Assurance of Operational Readiness of Valves to Perform Intended Functions.Relief Request PRR-11 Cannot Be Approved ML20127P2081992-11-20020 November 1992 SER Accepting Util Commitment to Entire GIP-2,including Both SQUG Commitments & Implementation Guidance ML20248D7681989-09-29029 September 1989 Supplemental Safety Evaluation Supporting Util Actions in Response to Open Items in 890510 Safety Evaluation Re Plant Safety Monitoring Sys ML20247N3561989-05-30030 May 1989 SER Supporting Util Actions to Comply W/Item 4.5.3 of Generic Ltr 83-28, Reactor Trip Sys Functional Testing ML20246M1791989-05-10010 May 1989 Safety Evaluation Re Verification & Validation Plan for Plant Safety Monitoring Sys.Hardware Design of Sys Found Acceptable.Verification & Validation Plan Found Incomplete & Unacceptable.Software Design Process Inadequate ML20246D5501989-04-26026 April 1989 Safety Evaluation Accepting Util Submittals on Natural Circulation Cooldown for Unit ML20206G0431988-11-17017 November 1988 Safety Evaluation Concluding That All Issues Raised Under Item Resolved & Item 4.3 Closed ML20153C0911988-08-17017 August 1988 Safety Evaluation Re Licensee 870731 Comments on Sser 5, Section 9.5.1.Fire Protection in Cable Rooms & Containment Constitutes Acceptable Deviations from Branch Technical Position Cmeb 9.5-1 ML20205T0021988-08-10010 August 1988 SER Accepting Util 831104,840330 & 870504 Responses to Item 2.2.1 of Generic Ltr 83-28 Re Equipment Classification Programs for All safety-related Components ML20154R4451988-05-31031 May 1988 Safety Evaluation Re Compliance W/Atws Rule 10CFR50.62.Util Proposed Design Acceptable Subj to Final Resolution of Tech Spec Issue ML20154P4341988-05-24024 May 1988 Safety Evaluation Concluding That Proposed Tech Spec Change Acceptable.No Amend Issued Since Conditions Resulting in Need for Amend to License NPF-73 No Longer Exist ML20154F9901988-05-12012 May 1988 Supplemental Safety Evaluation Concluding That Licensee 880322 Response to Open Issues Identified in 860722 Draft Technical Evaluation Rept of 840330 Submittal Re Salem ATWS Event Action Item 1.2, Post-Trip Review Satisfactory ML20154F9841988-05-12012 May 1988 Supplemental Safety Evaluation Concluding That Licensee 851114 Response to Open Issues Noted in 851017 Draft Technical Evaluation Rept of 831104 Submittal Re Salem ATWS Event Action Item 1.2, Post-Trip Review Satisfactory ML20153B6291988-04-25025 April 1988 Safety Evaluation Granting Util 870616 & 871110 Requests for Inservice Insp Relief for Welds on Nonregenerative Hxs,Per 10CFR50.55a(g)(6)(i) ML20148K5231988-03-18018 March 1988 Safety Evaluation Supporting Util Inservice Testing Program & Requests for Relief ML20234E0531987-12-0808 December 1987 Safety Evaluation Accepting Design Changes to Be Implemented During Unit 1 Cycle 7 Fuel Reload.Tech Spec Change Unnecessary ML20236X4941987-11-0909 November 1987 Safety Evaluation Granting Util 860617 Relief Request from Performing Volumetric & Visual Exam Requirements of ASME Section XI for Reactor Coolant Pumps Casing Welds & Internal Surfaces ML20237B1651987-10-21021 October 1987 Safety Evaluation Supporting Elimination of Primary Component Support Snubbers from Primary Coolant Loops ML20204H7181987-03-18018 March 1987 Interim Safety Evaluation Re Pump & Valve Operability Assurance (SER Confirmatory Issue 13).Pages from Pvort Audit Encl ML20206G2231987-03-12012 March 1987 SER Accepting Licensee Request to Use Damping Values from ASME Code Case N-411 Per Conditions Outlined in Util ML20207P6551987-01-0202 January 1987 SER Accepting Licensee Compliance W/Generic Ltr 83-28,Item 2.1,Part 2 Re Vendor Interface Program for Reactor Trip Sys (RTS) Components & Item 4.5.2 Concerning RTS Online Reliability Testing ML20212B0111986-11-30030 November 1986 Safety Evaluation Granting Util Request for Exemptions from App R Requirements Re Separation of Cables & Equipment & Associated Circuits ML20205G4491986-08-31031 August 1986 Safety Evaluation Accepting Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML20204G9281986-07-31031 July 1986 Safety Evaluation Supporting Util 860502 Submittal of Westinghouse Reload Safety Evaluation,Beaver Valley Nuclear Plant,Unit 1 Cycle 6 ML20203G2371986-07-28028 July 1986 Interim SER Re Dcrdr Summary Rept & Preimplementation Audit on 860211 & 12.Requirements of Suppl 1 to NUREG-0737 Generally Satisfied.Several Items Remain to Be Completed ML20206H4931986-06-19019 June 1986 Safety Evaluation on Generic Ltr 83-28,Item 4.2.3 & 4.2.4, Preventive Maint Program for Reactor Trip Breakers/Life Testing. Licensee Position Unacceptable ML20205N1151986-04-22022 April 1986 Interim Rept Re Review of Util Response to Generic Ltr 85-12 on Reactor Coolant Pump Trip Criteria.Addl Info Required ML20202C5721986-04-0303 April 1986 Sser Accepting Util 860304 Response to Generic Ltr 83-28, Item 4.3, Seismic Qualification of Shunt Trip Components ML20214E3631986-03-17017 March 1986 Safety Evaluation Supporting Amend 2 to CPPR-105 ML20154N7451986-03-10010 March 1986 Safety Evaluation Supporting Util 850819 Request to Withdraw Original Commitment to Provide Steam Leakage Collection Sys Around Certain Steam Valves 1999-04-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
.
~
ENCLOSURE 2 i
CHEMICAL ENGINEERING BRANCH SAFETY EVALUATION LICENSEE COMMENTS ON SSER NO. 5 BEAVER VALLEY UNIT 2
1.0 INTRODUCTION
By letter dated July 31, 1987, the licensee provided a number of concents concerning Section 9.5.1 of Supplemental Safety Evaluation Report (SSER) No. 5.
The staff's evaluation of the comments is as follows.
2.0 nISCUSSION/ EVALUATION A number of the licensee's comments are editorial in nature which more accurately describe plant conditions. The staff has reviewed these connents and conclude they are valid. Therefore, the following amendments should be incorporated into SSER No. 5:
SSER PAGE SECTION REVIS10N 9-2 9.5.1 The end of the first paragraph of Section 9.5.1 should read as follows:
... and Confirmatory Issues 48(b) and (c) relating to NRR's Fire Protection Site Visit and the separation of safe shutdown components, respectively."
9-2 9.5.1.4 In the second paragraph of Section 9.5.1.4, the end of the first sentence should read as follows:
... (Fire Area SB-5) from the turbine building (TB-1) and the 773-foot, 6-inch elevation of the auxiliary building (Fire Area PA-5) and which separate Fire Area PA-5 from the health physics area (Fire Area kn-2) and from Fire Area TB-1 has not been fire-proofed."
9-3 9.5.1.4 The third sentence of the last paragraph on Page 9-3 should read as follows:
"The 2-inch portion of the ductwork is above the floor of Fire Area SB-4 and below the upper damper of the two 1-1/2 hour dampers that are in series."
9-5 9.5.1.4 The second to last sentence in the second paragraph on Page 9-5 should read as follows:
8808310227 000817 2 DR ADOCK 050
SSER PAGE SECTION REVISION "In addition, the fire hazards analysis identifies nonsafety-related station air compressors in the turbine building; however, a fire in the turbine building would not require use of the station air compressors for safe shutdown since the control
' room would be available.
9-6 9.5.1.4 The following changes should be made in the second paragraph:
The third sentence should begin as follows:
"A single train of the above systems provides ..."
The seventh sentence should read as follows:
"... or from one of the boric acid tanks through ..."
The last sentence should read as follows:
... (atmospheric dump valves) in conjunction with the auxiliary feedwater system during cooldown, to a temperature of less than or equal to 350'F, at which ..."
0-9 9.5.1.4 The fifth sentence of the second paragraph should read as follows:
... of the pressurizer heaters, if available."
The second to last sentence of the second paragraph should read as follows:
l
... RCS temperature falls to 350'F, ..."
. 9-10 9.5.1.4 The third complete sentence of the first paragraph should read as follows:
l
... for RHR pump ventilation and to the component cooling water heat exchangers."
9-12 9.5.1.4 Under the heading "Auxiliary Feedwater Control Valves," the third sentence should read as follows:
"On loss of hydraulic oil, the valves fail as-is (open)"
1
SSER PAGE SECTION REVISIO_N, Under the heading "Atmospheric Steam Dump Valves and Main Steam Isolation Yalves" the following changes shouid be made due to the replacement of the original MSIVs":
In the first sentence, the MSIVs designation should be "2 MSS *A0V" (A0V replaces HYC).
The fourth, fifth, and sixth sentences should be replaced with the following:
"The wye pattern globe type MSIVs utilize a pressurized air cylinder to control valve position.
Instrument air pressure to each valve cylinder opens the MSIV. Continuous instrument air pressure keeps the valves open. A mechanical spring closes each MSIV ,when the air cylinder is vented. The air supply line to each cylinder is provided with two fail-closed solenoid valves (orange and purple) in series. Two parallel vent lines extend from each air cylinder. Each vent line contains three fail-open solenoid valves, in series, which are powered from the same emergency bus. This arrange-ment ensures that loss of either emergency power bus will fail the MSIVs closed."
9-13 9.5.1.4
- In the last sentence under the heading "Safe Shutdown Circuitry," Fire Area PT-1 should be deleted from the deviation per FSAR Amendment 16 and Fire Area PA-3 should be added per FSAR Amendment 18.
9-13 9.5.1.4 In the last line under the heading "Electrical Cable Construction, ..." C.S.b should be C.5.e.
C-15 9.5.1.5 Under the heading "Fire Protection Water Supply System," tne first sentenc2 should read as follows:
... thus providing a 370-foot spacing which exceeds the 250-foot spacing indicated in Section e
C.6.b(7)ofBTPCMEB9.5-1."
9-16 9.5.1.6 Under the heading "New Fuel Area and Spent Fuel Pool Area," the following changes should be made:
In the first sentence,.the BTP CMEB 9.5-1 Section for the new fuel area should be C.7,1 not C.7.k.
i l
5 SSER PAGE SECTION REVISIGN The last sentence should indicate that the deviations from both Sections C.7.1 and C.7.m are accepted, not just Section C.7.m.
9-17 9.5.1.6 Under the heading "Radwaste and Decontamination Area," the last line should indicate BTP CMEB Section C.7.n, not C.7.m.
In the SSER, under the discussion on fire doors, the staff stated that the licensee had comitted to have the security-modified fire doors relabeled by the manufacturer or to maintain file documentation that individual doors are UL-approved. In the July 31, 1987 coment the licensee indicated that a third option was to conduct engineering evaluations to justify the existing door assembly. This approach is sanctioned by staff guidance contained in Generic Letter 86-10. However, the acceptability of such analyses is not automatic and is subject to future audit.
Therefore, on page 9-4 the seventh sentence of the second paragraph should read as follows: ,
"For doors that are missing labels the applicant comitted to do one of the following: have the doors relabeled by the manufacturer; maintain on file documentation that individual doors are UL-approved; or perform an engineering evaluation to justify individual door assemblies. The engineering evaluations will be subject to future staff audit."
In the last sentence of the second paragraph on Page 9-4, the words "with the exception of the doors missing labels" should be deleted.
In the SSER the staff evaluated certain repairs that were necessary to achieve safe shutdown and stated that "the indicated repairs are acceptable as they are relatively simple, are not required for hot shutdown, and will ensure that the plant can achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without additional manpower."
The licensee comented that the phrase "without additional manpower" should be deleted. However, the licensing basis for Beaver Valley Unit 2 was cased on the licensee's ability to achieve cold shutdown with only on-site operating personnel, independent of the fire brigade. Additional personnel that may be available off site cannot be credited. Therefore, the existing SSER statement must remain.
In the SSER, the staff stated that certain National Fire Protection Association (NFPA) code deviations had been approved. On the basis that no other deviations had been identified the issue of NFPA code conformance was closed. The licensee's July 31, 1987 coment was that deviations from applicable NFPA codes that are specified in the SRP acceptance criteria have been identified in accordance with 10 CFR 50.34(g). The staff re-affirms that only those code deviations that have been explicitly identified in the FSAR and evaluated in the SER and its supplements have been accepted. This is in accordance with the guidance issued in Generic Letter 86-10.
. The licensee stated that there was no explicit reference in the SSER to two deviations from BTP CMEB 9.5-1 pertaining to the nature of the fire tuppression system in the cable rooms and the extent of fire detection in containment.
These features were evaluated during the fire protection site audit of January 27-30, 1987. The staff considered the existing fire ha:ards in these areas and concluded that the licensee's alternate fire protection configuration achieved an equivalent level of safety to that produced by conformance with the above guidelines. Therefore, the fire protection in these areas, as described in the FSAR thru Amendment No.19, are considered acceptable deviations from BTP CMEB 9.5-1.
Principal contributor : D. Kubicki Da ted August 17, 1985
.