Text
~
v
h
FEB 1 3 1986
Docket No. 50-461
Illinois Power Company
' ATTN:
Mr. W. C. Gerstner
Executive Vice President
'
500 South 27th Street
Decatur, IL 62525
Gentlemen:
.
This refers to the routine safety inspection conducted by Mr. J. F. Norton
of_this office on November 19, 1985 through January 27, 1986, of activities
at the Clinton Power Station, Unit 1 authorized by NRC Construction Permit
No.'CPPR-137 and to the discussion of our findings with Mr. Roger Weber _and
others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection cons.isted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document-Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~
cc: , :,f.1 C';rl byl. J. T
Y.
7
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Report
No. 50-461/85062(DRS)
'
See Attached Distribution
}III
RI I g
RIII
RII
%
gM
'
Norton/mi
Ja
anski
Muffett
Harrison
.
&o }PJo
&
8602180297 860213
ll
ADOCK 05000461
e
_
g,g / gl
n--
.
4
>-
Illin'ois' Power Company
2
FEB 131986'
Distribution.
cc w/ enclosure:
DCS/RS8 (RIDS)
' Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
~ Gary N. Wright, Manager
Nuclear Facility Safety-
=
Jean Foy,. Prairie Alliance
Mark Jason, Assistant
' Attorney General,
Environmental Control Di.ision
. H. S. Taylor, Quality Ass Jrance
Division
-
\\
N-
k
I