Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153E300 + (07:47:30, 11 December 2024)
- ML20153E298 + (07:47:31, 11 December 2024)
- ML20153E296 + (07:47:31, 11 December 2024)
- ML20153E292 + (07:47:32, 11 December 2024)
- ML20153E290 + (07:47:33, 11 December 2024)
- IR 05000498/1988019 + (07:47:37, 11 December 2024)
- ML20153E279 + (07:47:38, 11 December 2024)
- ML20153E280 + (07:47:38, 11 December 2024)
- ML20153E278 + (07:47:39, 11 December 2024)
- IR 05000312/1986003 + (07:47:41, 11 December 2024)
- ML20153E274 + (07:47:41, 11 December 2024)
- IR 05000368/1988003 + (07:47:43, 11 December 2024)
- ML20153E266 + (07:47:44, 11 December 2024)
- ML20153E265 + (07:47:45, 11 December 2024)
- ML20153E259 + (07:47:46, 11 December 2024)
- ML20153E257 + (07:47:47, 11 December 2024)
- ML20153E256 + (07:47:47, 11 December 2024)
- ML20153E251 + (07:47:48, 11 December 2024)
- ML20153E246 + (07:47:49, 11 December 2024)
- ML20153E242 + (07:47:50, 11 December 2024)
- IR 05000445/1988026 + (07:47:51, 11 December 2024)
- ML20153E237 + (07:47:52, 11 December 2024)
- ML20153E234 + (07:47:53, 11 December 2024)
- ML20153E233 + (07:47:53, 11 December 2024)
- ML20153E230 + (07:47:54, 11 December 2024)
- 05000289/LER-1998-009-01, :on 980820,discovered Potential Loss of HPI During Postulated Loca.Caused by Misapplication or Interpretation of Design Inputs.Revised OL Was Implemented & Mut Pressure & Level Limits Analysis Revised + (07:47:57, 11 December 2024)
- ML20153E227 + (07:47:58, 11 December 2024)
- ML20153E224 + (07:47:59, 11 December 2024)
- 05000354/LER-1988-021, :on 880728,cracks Discovered in Ductwork of Filtration,Recirculation & Ventilation Sys D.Caused by Design Deficiency.Stiffeners & Support Added to Flow Straighteners + (07:48:00, 11 December 2024)
- 05000289/LER-1998-009, Forwards LER 98-009-00 Re Potential Loss of HPI During Postulated LOCA with Most Limiting Single Failure.Caused by Misapplication of Design Inputs When Operating Procedures Were Changed Prior to Startup for Current Operating Cy + (07:48:01, 11 December 2024)
- ML20153E220 + (07:48:02, 11 December 2024)
- ML20153E217 + (07:48:03, 11 December 2024)
- 05000219/LER-1988-015, :on 880805,reactor Isolation Signal Inadvertently Initiated During Intermediate Range Neutron Monitor Front Panel Surveillance.Caused by Circuit Not Configured to Facilitate Testing.Fuse Replaced + (07:48:05, 11 December 2024)
- IR 05000206/1986003 + (07:48:07, 11 December 2024)
- ML20153E203 + (07:48:07, 11 December 2024)
- ML20153E202 + (07:48:08, 11 December 2024)
- ML20153E190 + (07:48:09, 11 December 2024)
- IR 05000018/2010003 + (07:48:11, 11 December 2024)
- ML20153E180 + (07:48:12, 11 December 2024)
- 05000482/LER-1988-013, :on 880802,control Room Ventilation Isolation Signal Occurred Due to Chlorine Monitor.Caused by Paper Tape Bunching Up on Chlorine Monitor.Paper Tape Replaced & No Further Problems Identified W/Monitor + (07:48:13, 11 December 2024)
- 05000458/LER-1986-009, Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised + (07:48:14, 11 December 2024)
- ML20153E175 + (07:48:15, 11 December 2024)
- ML20153E171 + (07:48:16, 11 December 2024)
- ML20153E169 + (07:48:17, 11 December 2024)
- 05000280/LER-1986-002-01, :on 860119,at 100% Power,Excess Leakage of RCS Noted.Caused by Failed motor-operated Valve Packing & Failed Diesel Generator Diaphragm.Valve Will Be Repacked & Diaphragm Replaced During Next Suitable Outage + (07:48:18, 11 December 2024)
- ML20153E164 + (07:48:19, 11 December 2024)
- ML20153E161 + (07:48:20, 11 December 2024)
- ML20153E160 + (07:48:21, 11 December 2024)
- ML20153E149 + (07:48:26, 11 December 2024)
- ML20153E148 + (07:48:27, 11 December 2024)
- 05000413/LER-1986-004, :on 860115,invalid Grab Samples Obtained.Caused by Introduction of Flush Water Over 4-day Period Due to Stuck Turbine Bldg Sump Radiation Monitor Flush Inlet Valve. on 851221,valve 1EMF Declared Inoperable + (07:48:32, 11 December 2024)