ML20153E251
| ML20153E251 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/05/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20153E255 | List: |
| References | |
| NUDOCS 8805090438 | |
| Download: ML20153E251 (2) | |
See also: IR 05000368/1988003
Text
-_
_
'.
-
.
,
I
&
MAY
5 1988
In Reply Refer To:
Dockets:
50-313/88-03
50-368/88-03
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. H. W. Kersch, of the NRC's
Region I office during the period February 23 through March 3, 1988, of
activities authorized by NRC Operating License DPR-51 and NPF-6 for Arkansas
Nuclear One, and to the discussion of our findings with J. Taylor-Brown and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection, which was limited to Unit 2, included
independent measurement of safety-related piping weldments, components, and
supports. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10 Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
~
discuss them with you.
Sincerely.
Origini jlgacd By
& D. Beacli
~~
L. J. C&llan, Director
Divir, ion of Reactor Projects
Enclosures: (see next page)
RIV:DD *
D:DRS *
C:PSA *
D:
cur
JJaudon/cjg
JLMilhoan
DChamberlain
LJ a lan
JJ do
/ /88
/ /88
/ /88
$ /4 /88
y /88
- Previously concurred.
f
8805090438 880505
)l
\\
ADOCK 05000313
/
-
O
-.
_ _ _ _ _ _
- - . _
. _ . - _ .
_ _ .
.
- - . - . - . .
-
,
_
e
-
~
-
. e 7, .
. ., ,..
,
- ,-
. Arkansas Power & Light-Company
-2-
'
'
_
Enclosures:
- ~
1. . Appendix A - Notice of Violation
2. . NRC Inspection Report No. 50-368/88-03-
cc'w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine . Director
Site Nuclear Operations-
' P.O. Box 608
Russellville, Arkansas 72801-
Arkansas Radiation Control Program Director
bcc:
bec to DMB (IE01)
bec distrib. by RIV:
,
- RRI
R..D.. Martin, RA
RPSB-DRSS
SectionChief(DRP/A)
Lisa Shea, RM/ALF.
RIV File
MIS System
RSTS Operator
Project Engineer, DRP/A
G. Dick, NRR Project Manager DRS
H. Scott, Acting EO
I. Barnes
'
Region !
<
4
4
4
a
1
1
i
r
0
r ~. -
e.q
r, -n-,,q.,-m,,e,m,,,w
%w_,..
,,
y,-__egy,ym,--r,.w,r-c,,,--
w-ww.,m.n
,
,,ww,w.r-,.
--,%,w,m-,,,-e-