Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153G829 + (07:17:52, 11 December 2024)
- ML20153G823 + (07:17:54, 11 December 2024)
- ML20153G820 + (07:17:55, 11 December 2024)
- IR 05000713/2001072 + (07:17:56, 11 December 2024)
- ML20153G818 + (07:17:56, 11 December 2024)
- ML20153G817 + (07:17:57, 11 December 2024)
- ML20153G811 + (07:17:58, 11 December 2024)
- ML20153G810 + (07:17:58, 11 December 2024)
- ML20153G808 + (07:17:59, 11 December 2024)
- ML20153G809 + (07:17:59, 11 December 2024)
- 05000265/LER-1988-006-05, :on 880404,eleven Flued Head Anchors Discovered Outside Design Requirements of Final Fsar.Caused by Misinterpretation of Scope Due to Structures Not Being Reassessed,Per IE Bulletins 79-02 & 79-14 + (07:18:01, 11 December 2024)
- ML20153G805 + (07:18:02, 11 December 2024)
- ML20153G804 + (07:18:03, 11 December 2024)
- ML20153G803 + (07:18:03, 11 December 2024)
- ML20153G802 + (07:18:04, 11 December 2024)
- ML20153G796 + (07:18:05, 11 December 2024)
- ML20153G791 + (07:18:06, 11 December 2024)
- ML20153G792 + (07:18:06, 11 December 2024)
- ML20153G790 + (07:18:07, 11 December 2024)
- 05000254/LER-1987-022-01, :on 871109,full Reactor Scram Ocurred.Probably Caused by Short Circuit Developed Due to Metal Particles & Dirt Found in Intermediate Range Monitor Wiring Connectors. Connectors Cleaned & Procedures Revised + (07:18:09, 11 December 2024)
- ML20153G786 + (07:18:10, 11 December 2024)
- ML20153G785 + (07:18:10, 11 December 2024)
- 05000255/LER-1986-006, :on 860125,power to 2,400-volt Bus 1C Lost During Transfer Attempt Between Station Power Breakers. Caused by Failure of Personnel to Recognize That Breaker Receiving Power Transfer in Test Position + (07:18:12, 11 December 2024)
- IR 05000369/1988014 + (07:18:13, 11 December 2024)
- ML20153G782 + (07:18:13, 11 December 2024)
- ML20153G781 + (07:18:14, 11 December 2024)
- ML20153G778 + (07:18:15, 11 December 2024)
- ML20153G780 + (07:18:15, 11 December 2024)
- ML20153G777 + (07:18:16, 11 December 2024)
- ML20153G775 + (07:18:17, 11 December 2024)
- ML20153G774 + (07:18:17, 11 December 2024)
- ML20153G773 + (07:18:18, 11 December 2024)
- ML20153G771 + (07:18:18, 11 December 2024)
- ML20153G770 + (07:18:19, 11 December 2024)
- 05000213/LER-1988-011, :on 880408,required Test Interval for Surveillance Procedure Sur 5.2-9 Found Exceeded by 1 Wk in Violation of Tech Specs.Caused by Personnel Error.Test Performed on 880408 W/Satisfactory Results + (07:18:21, 11 December 2024)
- ML20153G767 + (07:18:22, 11 December 2024)
- ML20153G766 + (07:18:22, 11 December 2024)
- ML20153G765 + (07:18:23, 11 December 2024)
- ML20153G764 + (07:18:23, 11 December 2024)
- ML20153G762 + (07:18:24, 11 December 2024)
- ML20153G763 + (07:18:24, 11 December 2024)
- ML20153G761 + (07:18:25, 11 December 2024)
- ML20153G758 + (07:18:26, 11 December 2024)
- ML20153G757 + (07:18:26, 11 December 2024)
- ML20153G755 + (07:18:27, 11 December 2024)
- ML20153G756 + (07:18:27, 11 December 2024)
- ML20153G754 + (07:18:29, 11 December 2024)
- 05000295/LER-1988-003, :on 880302,station Received Confirmation That Samples of Sr-89 Being Shipped to Offsite Lab for Isotopic Analysis Did Not Meet Lower Limit of Detection Required by Tech Spec.Caused by Delays in Shipment + (07:18:30, 11 December 2024)
- ML20153G752 + (07:18:31, 11 December 2024)
- ML20153G751 + (07:18:35, 11 December 2024)
- ML20153G747 + (07:18:36, 11 December 2024)
- ML20153G748 + (07:18:36, 11 December 2024)