Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154L285 + (05:10:39, 11 December 2024)
- ML20154L280 + (05:10:40, 11 December 2024)
- ML20154L283 + (05:10:40, 11 December 2024)
- ML20154L279 + (05:10:42, 11 December 2024)
- ML20154L275 + (05:10:45, 11 December 2024)
- ML20154L274 + (05:10:46, 11 December 2024)
- ML20154L273 + (05:10:47, 11 December 2024)
- ML20154L271 + (05:10:48, 11 December 2024)
- ML20154L272 + (05:10:48, 11 December 2024)
- ML20154L270 + (05:10:49, 11 December 2024)
- 05000374/LER-1988-009-08, :on 880817,RCIC Steam Line High Flow Isolation Switch Failed Due to Failed Diaphragm.New Pressure Switch Identical to Failed One Certified for Use in RCIC Steam Line High Flow Application Using LIP-GM-952 & 956 + (05:10:50, 11 December 2024)
- ML20154L265 + (05:10:51, 11 December 2024)
- ML20154L263 + (05:10:52, 11 December 2024)
- ML20154L262 + (05:10:53, 11 December 2024)
- ML20154L261 + (05:10:53, 11 December 2024)
- ML20154L259 + (05:10:54, 11 December 2024)
- IR 05000327/1986007 + (05:10:55, 11 December 2024)
- ML20154L256 + (05:10:55, 11 December 2024)
- ML20154L255 + (05:10:56, 11 December 2024)
- ML20154L253 + (05:10:57, 11 December 2024)
- ML20154L251 + (05:10:57, 11 December 2024)
- 0CAN098808, Forwards Rev 10 to QA Manual Operations + (05:10:58, 11 December 2024)
- ML20154L250 + (05:10:58, 11 December 2024)
- ML20154L246 + (05:10:59, 11 December 2024)
- ML20154L245 + (05:11:00, 11 December 2024)
- ML20154L244 + (05:11:00, 11 December 2024)
- ML20154L243 + (05:11:01, 11 December 2024)
- ML20154L241 + (05:11:01, 11 December 2024)
- ML20154L240 + (05:11:02, 11 December 2024)
- ML20154L237 + (05:11:03, 11 December 2024)
- ML20154L236 + (05:11:04, 11 December 2024)
- ML20154L234 + (05:11:04, 11 December 2024)
- ML20154L230 + (05:11:07, 11 December 2024)
- ML20154L231 + (05:11:07, 11 December 2024)
- ML20154L229 + (05:11:08, 11 December 2024)
- 3F0588-12, Confirms That Licensee Will Install HVAC Mod Previously Described But May Choose to Derate Diesel Generator Should Portion of Mod Become Inoperable & Margin Remain Re Diesel Generator Load + (05:11:09, 11 December 2024)
- IR 05000245/1998215 + (05:11:14, 11 December 2024)
- 05000265/LER-1988-007-05, :on 880420,leak Rate from All Valves & Penetrations in Excess of Spec Limits.Cause Unknown.No Corrective Actions Taken + (05:11:16, 11 December 2024)
- ML20154L224 + (05:11:17, 11 December 2024)
- ML20154L223 + (05:11:18, 11 December 2024)
- ML20154L222 + (05:11:18, 11 December 2024)
- ML20154L220 + (05:11:19, 11 December 2024)
- 05000245/LER-1986-008-01, :on 860206,isolation Condenser Initiated While Performing Reactor lo-lo Water Level Functional Surveillance.Caused by Operator Error.Operator Immediately Isolated Isolation Condenser + (05:11:21, 11 December 2024)
- 05000325/LER-1988-013, :on 880424,failure of Svc Water Sys Nuclear Header Supply Isolation Valve to Open Due to Oxidation of Valve Geared Limit Switch Electrical Contacts. Oxidation of Electrical Contacts Removed + (05:11:23, 11 December 2024)
- ML20154L217 + (05:11:24, 11 December 2024)
- ML20154L216 + (05:11:24, 11 December 2024)
- ML20154L215 + (05:11:25, 11 December 2024)
- 05000317/LER-1988-003-01, :on 880423,during eddy-current Testing,Plug Found in Outlet Tube Sheet in Tube Adjacent to Tube That Should Have Been Plugged.Caused by Personnel Error & Inoperable Tube Position Indicating Sys + (05:11:27, 11 December 2024)
- TXX-8867, Responds to NRC Re Violations Noted in Insp Repts 50-445/88-51 & 50-446/88-47.Corrective Actions:Procedure Ece 5.02,Rev 1 Revised to Assure That Page Replacement Authorizations Reviewed & Approved by Contractors + (05:11:28, 11 December 2024)
- ML20154L212 + (05:11:28, 11 December 2024)
- ML20154L208 + (05:11:29, 11 December 2024)
- ML20154L207 + (05:11:30, 11 December 2024)