Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155B166 + (03:27:30, 11 December 2024)
- ML20155B163 + (03:27:31, 11 December 2024)
- ML20155B164 + (03:27:31, 11 December 2024)
- ML20155B161 + (03:27:32, 11 December 2024)
- ML20155B159 + (03:27:33, 11 December 2024)
- ML20155B155 + (03:27:34, 11 December 2024)
- ML20155B156 + (03:27:34, 11 December 2024)
- ML20155B154 + (03:27:35, 11 December 2024)
- ML20155B152 + (03:27:36, 11 December 2024)
- ML20155B148 + (03:27:36, 11 December 2024)
- ML20155B147 + (03:27:37, 11 December 2024)
- ML20155B146 + (03:27:38, 11 December 2024)
- ML20155B145 + (03:27:38, 11 December 2024)
- ML20155B144 + (03:27:39, 11 December 2024)
- ML20155B141 + (03:27:40, 11 December 2024)
- ML20155B142 + (03:27:40, 11 December 2024)
- ML20155B137 + (03:27:41, 11 December 2024)
- ML20155B139 + (03:27:41, 11 December 2024)
- IR 05000302/1998008 + (03:27:46, 11 December 2024)
- ML20155B128 + (03:27:49, 11 December 2024)
- ML20155B126 + (03:27:50, 11 December 2024)
- ML20155B125 + (03:27:51, 11 December 2024)
- 05000213/LER-1988-014, :on 880511,determined That Effluent Sample Pump P-8-1A Taken Out of Svc for Maint on 880510 Rendering Svc Water Effluent Radiation Monitor R-18 Inoperable.Caused by Personnel Error.Instruction Written + (03:27:52, 11 December 2024)
- ML20155B122 + (03:27:54, 11 December 2024)
- ML20155B121 + (03:27:54, 11 December 2024)
- ML20155B120 + (03:27:55, 11 December 2024)
- ML20155B116 + (03:27:56, 11 December 2024)
- ML20155B114 + (03:27:56, 11 December 2024)
- TXX-4752, Forwards Comanche Peak Response Team Result Repts,Including Rev 1 to ISAP:I.a.4,Agreement Between Drawings & Field Terminations, Rev 1 to ISAP:I.b.3,Conduit to Cable Tray Separation & Rev 1 to ISAP:VII.b.2,Valve Disassembly + (03:27:57, 11 December 2024)
- ML20155B111 + (03:27:58, 11 December 2024)
- ML20155B110 + (03:27:58, 11 December 2024)
- ML20155B106 + (03:27:59, 11 December 2024)
- ML20155B103 + (03:28:00, 11 December 2024)
- 05000278/LER-1988-001-02, :on 880408,primary Containment Isolation Sys Actuated During Switching of 4kV Emergency Bus Feed.Caused by Lack of Procedural Guidance & Training.Procedures Revised + (03:28:03, 11 December 2024)
- ML20155B100 + (03:28:04, 11 December 2024)
- IR 05000324/1998008 + (03:28:17, 11 December 2024)
- ML20155B098 + (03:28:18, 11 December 2024)
- ML20155B097 + (03:28:19, 11 December 2024)
- 05000289/LER-1988-001-02, :on 880316,CRD Breaker Failed Undervoltage Trip Test.Caused by Undervoltage Trip Paddle Lodged Over Armature Disk.Breaker Replaced.Maint Procedures Will Be Revised to Provide Direction for Verifying Dimensions + (03:28:20, 11 December 2024)
- ML20155B091 + (03:28:22, 11 December 2024)
- ML20155B088 + (03:28:23, 11 December 2024)
- ML20155B090 + (03:28:23, 11 December 2024)
- ML20155B086 + (03:28:24, 11 December 2024)
- ML20155B087 + (03:28:24, 11 December 2024)
- ML20155B085 + (03:28:25, 11 December 2024)
- ML20155B083 + (03:28:26, 11 December 2024)
- ML20155B082 + (03:28:26, 11 December 2024)
- ML20155B079 + (03:28:28, 11 December 2024)
- ML20155B080 + (03:28:28, 11 December 2024)
- AECM-86-0092, Application for Amend to License NPF-29,changing Tech Specs to Increase Neutron Flux Noise Surveillance Per Rev 1 to GE Svc Info Ltr 380 & to Permit Operation W/One Recirculation Loop Out of Svc.Fee Paid + (03:28:29, 11 December 2024)
- ML20155B076 + (03:28:30, 11 December 2024)