Confirms 860322 Telcon Re Mgt Meeting to Be Held on 860414 in Atlanta,Ga to Discuss Module 6 Re Electrical Equipment, Module 12 Re Electrical Cables & Separations & App J Re Equipment Qualification.Meeting Agenda Encl
ML20155B142
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/04/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8604100268
Download: ML20155B142 (4)


Text

=

q.

MOe.dj

(=~

APR 4 1986 C

Georgia Power Compary

/ ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - V0GTLE - DOCKET NO. 50-424 This confirms the telephone conversation between Mr. G. F. Trudeau of your staff and Mr. W. H. Rankin of my staff on March 22, 1986, concerning a manage-ment meeting to be conducted at the Region II Office on April 14, 1986, at 12:30 p.m.

Mr. Trudeau requested this meeting to present the following Georgia Power Company's Modules for your Vogtle facility to the NRC for review: Module No. 6, " Electrical Equipment"; Module No. 12, " Electrical Cables and Separations";

Module No.19, " Electrical Supports"; and Appendix J, " Equipment Qualificatior".

A proposed meeting agenda is enclosed.

Should you have.any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, Original Signed by Roger D. Walker /for J. Nelson Gracc Regional Admini a,ator

Enclosure:

Proposed Meeting Agenda cc w/ enc 1:

4. E. Conway, Senior Vice President &

, Project Director-J. O. Foster, Vice President, Project Support d D. Rice, Vice President, Project

d. Engineering H. Pinson, Vice President, Project Construction vJ. T. Beckham, Vice President &

. General Manager - Operations J. A. Thomas, Vice President, Licensing (cc w/ enc 1: Cont'd page 2)

(

8 A

- _ _ __ -- _ S

9 APR 4 1986 Georgia Power Company 2

(cc w/ encl:

Cont'd)

d. W. Hayes, Vogtle Quality Assurance Manager

. C. Ramsey, Manager -

Readiness Review

/G.B.Bockhold,GeneralManager, Nuclear Operations ul_. Gutwa, Manager, Nuclear Safety and Licensing d. H. Googe, Project

, Construction Manager

-E'. D. Groover, Quality Assurance Site Manager -

d. Construction A. Bailey, Project Licensing Manager A. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge

-d. W. Churcnill, Esq., Shaw, Pittman, Potts and Trowbridge

d. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge

/J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore vd. G. Ledbetter, Commissioner, Department of Human Resources

/C. H. Badger, Office of Planning and Budget J. Kirkland, III, Counsel, Office of the Consumer's Utility Council ud.C.Teper,GeorgiansAgainst Nuclear Energy A. Johnson, Executive Director, Educational Campaign for a j Prosperous Georgia

/M. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board vbr.anel P

O. H. Paris, Administrative Judge Atomic Safety and Licensing Board

/d. Panel A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel J. P. Garde, Citizens Clinic, Director Government Accountability Project bec w/ encl:

(See page 3)

~

s Georgia Power Company 3

4D bec w/ encl:

tg. Rei s, ELD

/)'. M. Hill, IE JM. Miller, NRR vW. Brach, EDO M. Sinkule, RII i

W. Rankin, RII V'NRC Resident Inspector

~

Document Control Desk State of Georgia 1

I I

RII RII RII RII RII

\\R)

Rf#2D'$

f sk) iK'er )

f ' bcon WH ankin:ht MSink e VL rownlee J

4/$ /86 4/g /86 4/j /86 4/]/86 4/ /86 s)

U

O s

APR 4 1986 ENC 10Sl!RE PRCPOSED NEETING AGENDA GEORGIA F0 tier CaMPANY APRIL 14, 1986, 12:30 P.M.

I.

Opening Remarks R. D. Walker II.

Sumnary of Program Status / Schedule D.

O.

Foster W. C. Ramsey III.

GPC P esentation of the Readiness Review D.

O.

Foster Modules to the NRC W. C. Ramsey and Staff IV.

Discussion of the Readiness Review Attendees Mocules*

V.

Closing Remarks R. D. Walker I

l I

I J

  • Discussion for purp;se of clarificatien of GPC material presented.