._
.
-.
^*
.
.,
,
In Reply Refer To:
M -3 2
Docket: 50-382/88-08
,
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
'
Nuclear Operations
317 Baronne Street
P.O.-Box 60340
New Orleans, Louisiana 70160
Gentlemen:
This refers to the inspection conducted by Messrs. W. F. Smith and T. R. Staker
of this office during the period March 16 through April 30, 1988, of activities
authorized by NRC Operating License NPF-38 for Waterford Steam Electric
Station, Unit 3, and to the discussion of our findings with Mr. R. P. Barkhurst
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included onsite follow up of events,
monthly maintenance observation, monthly surveillance observation, complex
surveillance, operational safety verification, refueling activity observation,
engineered safety feature system walkdown, and plant status. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
Violations "A" and "C," in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
It will not be necessary to respond to Violation "B"
regarding failure to report diesel generator nonvalid failures, as you have
already taken the appropriate corrective actions as to cause.
l
Two unresolved items are identified in paragraphs 2.a. and 4.b. of the enclosed
,
inspection report.
)
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 5 of the enclosed report.
-
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
'
by the Papemork Reduction Act of 1980, PL 96-511.
A
D:DRP
TStaker
WSmith
DChamberlain
LJC lan
&/J/88
6 / 3 /88
I / 3 /88
6 / /88
I
'
'
8806130093 880603
y'h
X
ADOCK 05000382
O
_
- __
.
..
..
..
._
.
.
'
-
.
,
Louisiana Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
"
Igne'dBy
-
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/88-08
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
N. S. Carns, Plant Manager
P.O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
R. F. Burski, Acting Manager
Nuclear Safety & Regulatcry Affairs
317 Baronne Street
P.O. Box 60340
New Orleans, Louisiana 70160
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P.O. Box 8
l
Killona, Louisiana 70066
Middle South Services
ATTN: Mr. R. T. Lally
P.O. Box 6100
New Orleans, Louisiana 70161
Louisiana Radiation Control Program Director
l
_
-
- ___ ____-___________ _
_--
.
.
.
.
.
-
,
.
.
Louisiana Power & Light Company
-3-
bec to DMB (IE01)
bec distrib. by RIV
R. D. Martin, RA
- SectionChief(DRP/A)
- DRP
RPSB-DRSS
- MIS System
- Project Engineer, DRP/A
- RSTS Operator
- R. Hall
- D. Wigginton, NRR Project
- DRS
Manager
- Lisa Shea, RM/ALF