Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197B429 + (20:12:30, 10 December 2024)
- ML20197B426 + (20:12:31, 10 December 2024)
- ML20197B427 + (20:12:31, 10 December 2024)
- ML20197B424 + (20:12:32, 10 December 2024)
- ML20197B423 + (20:12:33, 10 December 2024)
- ML20197B422 + (20:12:34, 10 December 2024)
- NPL-97-0782, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-17 & 50-301/97-17 on 970304-0805.Corrective Actions:Revised TS to Eliminate Requirement to cross-connect Ccws for Redundancy + (20:12:35, 10 December 2024)
- ML20197B419 + (20:12:35, 10 December 2024)
- ML20197B418 + (20:12:36, 10 December 2024)
- ML20197B414 + (20:12:37, 10 December 2024)
- ML20197B417 + (20:12:37, 10 December 2024)
- ML20197B413 + (20:12:38, 10 December 2024)
- ML20197B412 + (20:12:39, 10 December 2024)
- ML20197B409 + (20:12:40, 10 December 2024)
- ML20197B410 + (20:12:40, 10 December 2024)
- ML20197B406 + (20:12:41, 10 December 2024)
- ML20197B408 + (20:12:41, 10 December 2024)
- ML20197B403 + (20:12:46, 10 December 2024)
- ML20197B404 + (20:12:46, 10 December 2024)
- ML20197B400 + (20:12:47, 10 December 2024)
- ML20197B401 + (20:12:47, 10 December 2024)
- ML20197B398 + (20:12:48, 10 December 2024)
- ML20197B396 + (20:12:48, 10 December 2024)
- ML20197B394 + (20:12:51, 10 December 2024)
- ML20197B386 + (20:12:59, 10 December 2024)
- ML20197B385 + (20:12:59, 10 December 2024)
- ML20197B382 + (20:13:00, 10 December 2024)
- ML20197B383 + (20:13:00, 10 December 2024)
- PY-CEI-NRR-2239, Responds to NRC Re Violations Noted in Insp Rept 50-440/97-12.Corrective Actions:Svi Was Reviewed & Transferred Data & Time Chart Increments Were Found to Be Incorrect Errors Were Corrected & Results Met Svi Criteria + (20:13:01, 10 December 2024)
- ML20197B376 + (20:13:02, 10 December 2024)
- ML20197B377 + (20:13:02, 10 December 2024)
- ML20197B370 + (20:13:03, 10 December 2024)
- ML20197B372 + (20:13:03, 10 December 2024)
- ML20197B369 + (20:13:04, 10 December 2024)
- IR 05000275/1997021 + (20:13:07, 10 December 2024)
- 05000312/LER-1985-022, :on 851120,pressurized Sampling Valve HV-21516 Found in Open Position W/Breaker Racked Out.Caused by Lack of Administrative Control.Process Sampling Procedures & Operator Training Upgraded + (20:13:10, 10 December 2024)
- ML20197B365 + (20:13:11, 10 December 2024)
- A97181, Requests That Listed Changes Be Made to Document Svc List for Info Re Pbaps,Units 2 & 3 + (20:13:12, 10 December 2024)
- ML20197B363 + (20:13:13, 10 December 2024)
- ML20197B362 + (20:13:13, 10 December 2024)
- ML20197B361 + (20:13:14, 10 December 2024)
- ML20197B360 + (20:13:15, 10 December 2024)
- ML20197B358 + (20:13:16, 10 December 2024)
- ML20197B359 + (20:13:16, 10 December 2024)
- NSD-NRC-97-5490, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses Is Provided in Table 1,which Includes FSER Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits + (20:13:17, 10 December 2024)
- 05000338/LER-1997-009-01, :on 971118,incomplete Surveillance on Solid State Protection Circuits Was Noted.Caused by Inadequate Design by Vendor.Controlling Tps Were Revised to Include Instructions to Test Affected Logic Circuits + (20:13:23, 10 December 2024)
- TXX-6049, Interim Deficiency Rept CP-85-42 Re Adverse Effects of Substituting Sections of Thermolags on Conduit Supports. Initially Reported on 850920.Analysis of Conduits,Supports & Appurtenances Continuing.Next Rept Expected by 861215 + (20:13:24, 10 December 2024)
- NSD-NRC-97-5489, Forwards W Responses to RAIs 640.69 & 640.164 Related to Comments Received from Staff on Rev 3 of AP600 Certified Design Matl Including ITAAC as Requested in Ltrs from Staff & 1106.Encl Closes Open Items 5728 & 6192 + (20:13:24, 10 December 2024)
- ML20197B347 + (20:13:25, 10 December 2024)
- TXX-6036, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Review of Nonconformance Rept Samples Conducted to Determine Safety Significance.Next Rept Will Be Submitted by 870715 + (20:13:25, 10 December 2024)
- TXX-6044, Interim Deficiency Rept CP-86-36 Re Large Bore Piping Supports.Initially Reported on 860609.Scope Revised to Delete Small Bore ASME Class 2 & 3 Piping to Provide More Accurate Results.Next Rept Will Be Submitted by 861201 + (20:13:26, 10 December 2024)
- 05000338/LER-1978-106-03, /03L-0:on 781010,power-range Instrumentation Channel N-41 Taken Out of Svc to Facilitate Replacement of Faulty Gain Pot.Caused by Dirt in Potentiometer,Resulting in Erratic Gain + (20:13:29, 10 December 2024)