Forwards IE Bulletin 78-13.(See ANO:7811060166.)
ML20197B359
Person / Time
Issue date: 10/27/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Henrickson H
USX CORP. (FORMERLY UNITED STATES STEEL)
References
NUDOCS 7811060251
Download: ML20197B359 (6)


Text

. - - _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___

T Y

PDRcf o,, m%,k UNITED STARES j

y NUCLEAR REGULATORY COMMISSION

% $ ~M 1 f

(

REGloN lli t

799 ROOSEVELT Ro Ao t

.(,

G LEN E LLYN. ILLINolS 60137 OCT 2 7.j78 U. S. Steel Southworks License No. 12-13386-02 ATTN:

h. Henrickson 86th & Green Bay Avenue Chicago, Illinois 60617 u nt lemen:

The enclosed Nuclear Regulatory Commission (NRC) IE Bulle tin No. 78-13 requires action by you with respect to certain gauging devices in your possession. Records show that you have received one or core of these gauges which are manuf actured by Kay-Ray, Incorporated. These gauges contain radioactive material regulated by the NRC. The possession and use of the radioactive material contained in the gauges is governed by either a specific NRC license issued to you or under the general license provisiens of NRC regulation 10 CFR Part 31, Section 31.5.

A copy of 10 CFR 31.5 is provided for your information.

If you possess gauges under a general license, you should have received a copy of this regula-tion from the gauge vendor when you received the gauges.

Should you have any questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, b

h me s G. Keppler Director

Enclosures:

1.

IE Bulle tin No. 78-13 2.

List of IE Bulletins Issued in 1978 cc w/encls, w/o Attachments to Bulletin:

Central Files Reproduction Unit NRC 20b PDR NSIC W31. ?J.}U 0cW/

4 I

a.

n i

t U.S. NUCLEAR REGULATORY COMMISSION i

0FFICE OF INSPECTION AND ENFORCEMENT REGION III J

October 27, 1978 4

IE Bulletin No. 78-13 n

FAILURZ IN SOURCE HEADS OF KAY-RAY, INC., GAUGES MODELS 7050, 7050B, 7051, 7051B, 7000 7060B, 7061, AND 7061B i

Description of Circumstances:

l The U.S. Nuclear Regulatory Commission (NRC) has received information that on three occasions in the past year fractures have occurred at the weld between the dome and the box of source heads used in the subject gauges manufactured by Kay-Ray, Inc. These gauges contain radioactive j

material regulated by the NRC. The possession and use of the radio-active material in the gauges is governed by either a specific NRC license or under the general license provisions of NRC regulation 10 CFR 31 Section 31.5.

A copy of 10 CFR 31.5 is enclosed.

These incidents of weld fractures in the gauges have caused the dome to separate from the box, exposing the 500 mil 11 curie cesium-137 sealed source.

In one case, the radioactive source itself fell loose from the y

i dome and was completely exposed. ' The separation of the dome frem the box could result in a radiation overexposure if an individual actually handled the radioactive source or worked in close proximity to a gauge e

where the lead dome had separated from the box.

l In order to correct this potential radiation hazard, Kay-Ray has developed

)

a support bracket which they will supply free of charge to prevent the dome separation if a fracture does occur. In a June 30, 1978 letter (copy enclosed) Kay-Ray advised you of the availability of the support

}

bracket and requested you to return a card confirming the specific source heads in your possession. A number of companies have not returned a card to Kay-Ray, Inc.

In order to assure correction of this potential hazard, you should complete the following actions.

i Actions to be taken by you as a licensee of the NRC:

1.

On the enclosed form, enter your company's name, address and telephone number, complete the other actions according to the instructions, and sign the preaddressed form sud return it to the NRC after completing all the required actions, t

i l

l. -

f 2-October 27, 1978 IE Bulletin No. 78-13

/

If you have transferred or otherwise disposed of any Kay-Ray gauges, take the action in item number 2, following:

21 Complete item 1 of the enclosed form, and (a) if you possessed the gauge under a general license of 10 CFR 31.5 include with the form a statement of how you have complied, or information which does comply, with the requirements of 10 CFR 31.5(c)(8) or (9) and pro-vide the name and address of the persons or organizations to whom the gauge was transferred, or (b) if you possessed the gauge under i

a specific license include with the form a statement of how you complied with the requirements of 10 CFR 30,41 and provide the name and address of the persons or organizations to whom the gauge was transferred.

If you have any of the specified Kay-Ray gauges in your possession, take the actions in item numbers 3 through 5 following:

3.

Within two (2) days of receipt of this Bulletin, visually inspect the source head on models 7050, 7050B, 7051, 7051B, 7060, 7060B, 7061,ld cracks between the dome and box.and 7061B of Kay-Ray gauges in your of we If cracks are found, take the following actions:

(a) contact Kay-Ray immediately at (312) 259-9244 and inform them, and (b) file a report with this office as required by 10 CFR 31.5(a)(5).

(A copy of 10 CFR 31.5 is enclosed.)

4.

Within ten (10) days af ter receiving the support bracket (s) from Kay-Ray, install a support bracket on each Kay-Ray gauge model (identified in item 3 above) in your possession.

5.

Within twelve (12) days af ter receiving the support bracket (s) from Kay-Ray, report the completion of the above actions to this office.

The report should be submitted by completing and returning the enclosed preprinted, preaddressed form to the NRC.

In addition to ;he above specific actions, we recommend that you read and become thoroughly fa=111ar with the conditions of either the specific NRC license or the general license of 10 CFR 31.5 whichever authorizes your use and possession of the gauge devices.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

Attachments:

1.

Report Form 2.

10 CFR 31 (extract) 3.

Kay-2ay Letter dated 6/30/78 4.

Kay-Ray Card 8

m

I IE Bulletin Nc. 78-13 October 27, 1978 LISTING OF IE BL'LLETINS ISSUED IN 1978 Date Issued Issued To j

Bulletin Subject No.

78-01 Flammable Contact -

1/16/78 All Power Reactor Arm Retainers in G.E.

Facilities with an CR120A Relays OL or CP 78-02 Terminal Block 1/30/78 All Power Reactor Qualification Facilities with an OL or CP i

78-03 Potential Explosive 2/8/78 All BWR Power Gas Mixture Accumula-Reactor Facilities tions Associated with with an OL or CP BVR Offgas System Operations 78-04 Environmental Quali-2/21/78 All Power Reactor fication of Certain Facilities with an Stem Mounted Limit OL or CP 4

Switches Inside Reactor Containment 78-05 Malfunctioning of 4/14/78 All Power Reactor Circuit Breaker Facilities with an Auxiliary Contact OL or CP Mechanism-General Model CR10SX 78-06 Defective Cutler-5/31/78 All Power Reactor Hammer, Type M Relays Facilities with an With DC Coils OL or CP 78-07 Protection afforded-6/12/78 All Power Reactor by Air-Line Respirators Tacilities with an and Supplied-Air Hoods OL, all class E and F Research Reactors with an OL, all Fuel Cycle Facilities with an OL, and all Priority 1 Material Licensees

1 IE Bulletin No. 78-13 October 27, 1978 LISTING OF IE BULLETINS ISSUED IN 1978 1

Date Issued Issued To Bulletin Subject g

l No.

l 78-08 Radiation Levels from 6/12/78 All Power and Fuel Element Transfer Research Reactor Tubes Facilities with a Fuel Element 1

transfer tube and an OL.

78-09 BWR Drywell Leakage 6/14/78 All BWR Power Paths Associated with Reactor Facilities Inadequate Drywell with an OL or CP Closares 78-10 Bergen-Paterson 6/27/78 All BWR Power Hydraulic Shock Reactor Facilities Suppressor Accumulator with an OL or CP Spring Coils 78-11 Examination of Mark I 7/21/78 BWR Power Reactor Containment Torus Taci11 ties for Welds action: Peach Bottom 2 and 3, Quad Cities 1 and 2, Hatch 1, Monti-cello and Vermont Yankee 78-12 Atypical Weld Material 9/29/78 All Power Reactor in Reactor Pressure Facilities with an Vessel Welds OL or CP

_