Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect + (17:26:51, 10 December 2024)
- ML20197J039 + (17:26:52, 10 December 2024)
- ML20197J033 + (17:26:53, 10 December 2024)
- ML20197J035 + (17:26:53, 10 December 2024)
- ML20197J032 + (17:26:54, 10 December 2024)
- ML20197J026 + (17:26:55, 10 December 2024)
- ML20197J024 + (17:26:56, 10 December 2024)
- ML20197J021 + (17:26:59, 10 December 2024)
- IR 05000373/1986011 + (17:27:03, 10 December 2024)
- 05000354/LER-1997-030, :on 971122,inoperability of CAC Sys Vacuum Breaker Isolation Valves Noted.Caused by Failure to Review Accumulator Sizing Calculation.Repaired Subject Valves, Revised Procedures & Updated IST Program + (17:27:09, 10 December 2024)
- ML20197J013 + (17:27:10, 10 December 2024)
- ML20197J012 + (17:27:11, 10 December 2024)
- ML20197J008 + (17:27:14, 10 December 2024)
- ML20197J004 + (17:27:15, 10 December 2024)
- ML20197H998 + (17:27:16, 10 December 2024)
- ML20197H997 + (17:27:19, 10 December 2024)
- ML20197H995 + (17:27:19, 10 December 2024)
- ML20197H994 + (17:27:20, 10 December 2024)
- PNO-III-96-014, on 960311,licensee Discovered Brachytherapy Source That Was Dislodged Due to Mishandling During Afterloading Procedure.Physician & RSO Immediately Inserted Source.Region III Will Conduct Special Insp on 960320 + (17:27:21, 10 December 2024)
- ML20197H989 + (17:27:21, 10 December 2024)
- ML20197H984 + (17:27:23, 10 December 2024)
- ML20197H985 + (17:27:23, 10 December 2024)
- ML20197H980 + (17:27:24, 10 December 2024)
- SVP-97-310, Forwards Remaining ASME Code NIS-2 Repts as Committed to in .Attachment Contains Amend to Table 3.1.1 of Rept & Remaining NIS-2 Repts + (17:27:25, 10 December 2024)
- ML20197H978 + (17:27:26, 10 December 2024)
- ML20197H976 + (17:27:27, 10 December 2024)
- ML20197H974 + (17:27:29, 10 December 2024)
- PNO-II-96-051, on 960716,ADRC Notified Region II That General Licensee Had Reported Missing Fixed Gauging Device,Kay Ray, Model 7062 Pb,Serial Number 18096.Licensee Conducting Interviews of Personnel & Reviewing Records + (17:27:30, 10 December 2024)
- ML20197H973 + (17:27:30, 10 December 2024)
- ML20197H970 + (17:27:31, 10 December 2024)
- ML20197H969 + (17:27:32, 10 December 2024)
- ML20197H967 + (17:27:32, 10 December 2024)
- ML20197H966 + (17:27:33, 10 December 2024)
- ML20197H962 + (17:27:34, 10 December 2024)
- ML20197H960 + (17:27:35, 10 December 2024)
- ML20197H961 + (17:27:35, 10 December 2024)
- 05000265/LER-1997-012-06, :on 971121,loss of Shutdown Cooling Due to Loss of Power to Reactor Protection Bus 2B.Caused by Undervoltage Condition at RPS 2B Bus When Bus Was Loaded.Voltage Regulating Transformer Cleaned & Adjusted + (17:27:37, 10 December 2024)
- ML20197H957 + (17:27:38, 10 December 2024)
- ML20197H953 + (17:27:41, 10 December 2024)
- ML20197H955 + (17:27:41, 10 December 2024)
- ML20197H951 + (17:27:42, 10 December 2024)
- ML20197H949 + (17:27:46, 10 December 2024)
- IR 05000010/1997026 + (17:27:47, 10 December 2024)
- ML20197H945 + (17:27:47, 10 December 2024)
- ML20197H943 + (17:27:48, 10 December 2024)
- PNO-III-96-026, on 960409,Unit 1 Reactor Shut Down Automatically When Maint Activities in Switchyard Resulted in Partial Loss of Offsite Power.On 960410 Second Unusual Event Declared Due to Heatup Rate in Excess of TS + (17:27:51, 10 December 2024)
- ML20197H937 + (17:27:52, 10 December 2024)
- ML20197H934 + (17:27:52, 10 December 2024)
- ML20197H933 + (17:27:53, 10 December 2024)
- HL-1360, Monthly Operating Repts for Hatch Units 1 & 2 for Oct 1990 + (17:27:54, 10 December 2024)
- ML20197H931 + (17:27:54, 10 December 2024)