ML20197J032
| ML20197J032 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/30/1997 |
| From: | Damashek T, Warren C WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-97-02, GL-97-2, WO-97-0135, WO-97-135, NUDOCS 9801020056 | |
| Download: ML20197J032 (3) | |
Text
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _
g =- 4 0
WipLF CREEK
_ NUCLEAR OPERATING CORPORATION ciey c. warren -
chef Operstmg Offcer December 18, 1997 WO 97-0135 U. S. Nuclear Regulatory Comrnission ATTN:
Document Control Desk Mail Station Pl-137 x
Washington, D. C.
.20555
Subject:
Docket No. 50-482: November, 1997, Monthly opera *ing Report Gentlemen:
-Attached to this letter is the November, 1997: Monthly Operating Report for Wol f-Creek Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.B.
Inis suomittal also follcus the guidance of Generic Letter 37-02, " Revised Contents of the Monthly Operating Report."
If you have questions regarding this r epo r t',
please contact me at (316)364-R831, extension 4485, or Mr. Michael J.
Angus at 'xtension 4077.
Very truly yours,
\\
[ k2Ad/~--
b Clay C. Warren CCW/jad Attachment-cc:
W. D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a J.-F.
Ringwald (NRC), w/a K. M. Thomas (NRC), w/a i
4 9801020056 971130
'3 O
~
bI POR ADOCK 05000482 j
J.
PDR I
~
ll ill i!i. lll1 !!.I ie a =
a P.O. Box 411/ Burlington, KS 66839 i Phone:(316) 364 8831 Ars Equal Opporturwty Ernployer M F+tCNET
~,
,.p, IIttadhmentLtoWO-' 97-0135-4 OPERATING DATA REPORT-Repvrt Number:
1531 e:
DOCKET NO.:- 482
+
- UNIT NAME.
Wolf Creek Generating Station l"
DATE : -.
Decernber 10, 1997-i COMPLETED BY:.
JT. Damashek TELEPHONE:
316-364-8831 X4566 REPORT HONTH: November, 1997 1.
Design = Electrical Rating (MWe - Net):
1170
{
2.
Maximum Dependable Capacity (MWe Net):
1163 This Month YTD-Cumulative 3.
Number of Ho rs-Reactor Critical:
43.4 6,599.2 88,351.1
- r 4.
Nttnter of Hours Generacor On-Line:
0.0-6,518.0 87,377.9
-- 5.
Unit Reserve-Shutdown = Hours:
0.0 0.0 339.8 6.
Net Electrical Energy Generated (MWH) 0.0 7,602,565 97,244,284 i
5 4
+
1 4
(
c 1Page-1~of 2 L
1
~
, ~, -... -
n
..~
rdl-Attachmen: to WO 97-0135 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-4 &
WOLF. CREEK GENERATING STATION WOLF CREEK NUCLEAR OPEPATING CORPOBATION DATE 12-10-97 TELEPHONE 316-364-8331, ::GG METHOD OF SHUTTING Type F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No-Date S: SCHEDULED ' (hours)
(1)
(2) 3 11/1/97-S 720 C
4
. Commenced Refuel IX October 4, at 0001.
The outage continued through November 30, 11/30/97 1997.
SIM1ARY:
The unit was in Refuel IX November 1, 1997, through November 30, 1997.
On November 29, 1997, at 0518, the reactor reached criticality during restart after Refuel IX.
On November 29, 1997, at 1437, the reactor tripped at approximately 8 percent. Criticality was again reached on November 30, 1997, at 1822.
1)
REASON: A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING A!D LICENSE EXAMINATION (2) METHOD:
- 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE
- 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
- 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN)
- 4. CONTINUED
- 5. REDUCED LOAD
- 9. OTHER Wolf Creek Generating Station Monthly Operating Report November, 1997 Page 2 of 2
....... _............