Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:L30929 + (12:34:37, 10 December 2024)
- ML20199G368 + (12:34:38, 10 December 2024)
- ML20199G369 + (12:34:38, 10 December 2024)
- ML20199G367 + (12:34:39, 10 December 2024)
- ML20199G363 + (12:34:40, 10 December 2024)
- ML20199G364 + (12:34:40, 10 December 2024)
- ML20199G362 + (12:34:41, 10 December 2024)
- ML20199G361 + (12:34:42, 10 December 2024)
- ML20199G360 + (12:34:42, 10 December 2024)
- ML20199G356 + (12:34:44, 10 December 2024)
- 05000364/LER-1986-006-01, :on 860521,during Heatup After Maint Outage, Fire Damper in Penetration 05-139-06 Inoperable Due to Routing of Headphone Cable Through Damper.Caused by Personnel Error.Individual Counseled + (12:34:46, 10 December 2024)
- ML20199G352 + (12:34:47, 10 December 2024)
- ML20199G350 + (12:34:51, 10 December 2024)
- ML20199G349 + (12:34:53, 10 December 2024)
- ML20199G348 + (12:34:54, 10 December 2024)
- ML20199G347 + (12:34:54, 10 December 2024)
- ML20199G343 + (12:35:06, 10 December 2024)
- ML20199G342 + (12:35:07, 10 December 2024)
- ML20199G341 + (12:35:07, 10 December 2024)
- RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (12:35:08, 10 December 2024)
- IR 05000445/1985009 + (12:35:09, 10 December 2024)
- ML20199G332 + (12:35:10, 10 December 2024)
- ML20199G331 + (12:35:10, 10 December 2024)
- ML20199G330 + (12:35:11, 10 December 2024)
- ULNRC-03684, Forwards Callaway Plant Annual Exercise, Conducted on 970812 & 13.Scenario No Longer Considered Confidential & May Be Included in NRC Records + (12:35:11, 10 December 2024)
- ML20199G328 + (12:35:12, 10 December 2024)
- ML20199G323 + (12:35:13, 10 December 2024)
- ML20199G327 + (12:35:13, 10 December 2024)
- ML20199G322 + (12:35:14, 10 December 2024)
- ML20199G319 + (12:35:14, 10 December 2024)
- ML20199G318 + (12:35:15, 10 December 2024)
- ML20199G316 + (12:35:16, 10 December 2024)
- ML20199G317 + (12:35:16, 10 December 2024)
- ML20199G311 + (12:35:17, 10 December 2024)
- ML20199G312 + (12:35:17, 10 December 2024)
- ML20199G308 + (12:35:21, 10 December 2024)
- ML20199G306 + (12:35:22, 10 December 2024)
- ML20199G305 + (12:35:22, 10 December 2024)
- 05000457/LER-1997-004, Forwards LER 97-004-00 from Braidwood Generating Station IAW Requirement of 10CFR50.73(a)(2)(iv),which Requires 30-day Rept.Ler Was Originally Transmitted W/Error in Reportability Requirements of Cover Ltr Only + (12:35:23, 10 December 2024)
- ML20199G300 + (12:35:24, 10 December 2024)
- ML20199G299 + (12:35:24, 10 December 2024)
- ML20199G298 + (12:35:25, 10 December 2024)
- ML20199G295 + (12:35:26, 10 December 2024)
- NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements + (12:35:26, 10 December 2024)
- ML20199G293 + (12:35:27, 10 December 2024)
- ML20199G294 + (12:35:27, 10 December 2024)
- ML20199G292 + (12:35:28, 10 December 2024)
- ML20199G291 + (12:35:29, 10 December 2024)
- ML20199G290 + (12:35:29, 10 December 2024)
- 05000424/LER-1998-007-03, :on 981215,inadequate Surveillances Were Found. Caused by Wiring Error & Improperly Performed Response Time Testing.Wiring Error Corrected & Procedures Changed to Allow Online Testing + (12:35:31, 10 December 2024)
- ML20199G284 + (12:35:36, 10 December 2024)
- ML20199G283 + (12:35:36, 10 December 2024)