Forwards Pmpr 99-3, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,981121- 1218.Diskette Containing Pmpr in Wordperfect 8 Format Also Encl.All Variances Expressed Re Current Operations Plans
ML20199G322
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/07/1999
From: Patrick W
CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES
To: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20199G314 List:
References
CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9901220257
Download: ML20199G322 (1)


Text

r ,

Center for Nuclear Waste Regulatory Analyses ,

6220 CULLBRA ROAD e P.O. DRAWER 28510

  • SAN ANTONIO TEXAS, U.SA 7822B 0510 (210) 522-5160
  • FAX (210) 522 5155 January 7,1999 Contract No. NRC-02-97-009 Account No. 20-1402-158 U.S. Nuclear Regulatory Commission  !

Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Program Management, Policy Development and Analysis Staff Mail Stop 8-A23 Washington, DC 20555

Subject:

CNWRA Program Manager's Periodic Report on Activities of the Center for l Nuclear Waste Regulatory Analyses for Period 3-FY1999 l l

Dear Mr. Linehan:

l l

The attached " Program Manager's Periodic Report"(PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses (CNWRA) for the period November 21-December 18,1998.

Its contents comply with the requirements of section F.1.5. of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.

Cost variance analyses are provided for the Division of Waste Management (D1035), Tank Waste Remediation System (J5164), Three Mile Island Unit 2 Independent Spent Fuel Storage Installation (J5186), Dry Transfer l

System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226),.and  ;

Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes (JCs), as well as for composite spendmg  ;

on this contract. All variances are expressed with regard to the current operations plans. I During period 3, one new intermediate milestone was introduced as reflected in table 2. Foui . liverables were transmitted as indicated in table 3.

Please contact me or Mr. Henry Garcia if you have questions regarding this report.

Sincerely yours, l

C

\ f(

Wesley C. Patrick l President HFG/lg Enclosures cc: B. Meehan J. Greeves S. Shankman  !

C. Paperiello J. Holonich S. Bahadur D. DeMarco E. Ten Eyck M. Federline  !

B. Stiltenpole (38) E. Brach CNWRA Directors / Element Managers W. Kane F. Miraglia S. Boyanowski (SwRI Contracts)

~

9901220257 990108 PDR WASTE WM-11 PDR Washington Office

  • Twinbrook Metro Plaza, #210 +12300 Twinbrook Parkway

_