Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320C301 + (09:01:13, 1 January 2025)
- 05000289/LER-1980-011-03, /03L-0:on 800610,reactor Bldg Spray Sys Compressed Air Test Exceeded Late Date.Caused by Incorrect Date Being Entered Into Surveillance Data Tracking Sys.Info Corrected. Review of Infrequent Surveillances Will Be Performed + (09:01:15, 1 January 2025)
- ML19320C299 + (09:01:16, 1 January 2025)
- 05000289/LER-1980-011, Forwards LER 80-011/03L-0 + (09:01:20, 1 January 2025)
- ML19320C295 + (09:01:22, 1 January 2025)
- ML19320C296 + (09:01:22, 1 January 2025)
- ML19320C294 + (09:01:24, 1 January 2025)
- AECM-80-119, Interim Deficiency Rept Re Mods to Dragon Valve Manifolds. Review of MCAR-GGNS 26 in M Gouge 800306 Site Insp Concluded That Deficiency Was Improperly Evaluated.Final Rept Will Be Submitted by 800702 + (09:01:24, 1 January 2025)
- ML19320C290 + (09:01:28, 1 January 2025)
- ML19320C289 + (09:01:29, 1 January 2025)
- ML19320C288 + (09:01:30, 1 January 2025)
- ML19320C286 + (09:01:31, 1 January 2025)
- ML19320C284 + (09:01:32, 1 January 2025)
- ML19320C283 + (09:01:33, 1 January 2025)
- ML19320C282 + (09:01:34, 1 January 2025)
- ML19320C281 + (09:01:35, 1 January 2025)
- ML19320C280 + (09:01:35, 1 January 2025)
- ML19320C278 + (09:01:37, 1 January 2025)
- ML19320C279 + (09:01:37, 1 January 2025)
- ML19320C277 + (09:01:38, 1 January 2025)
- ML19320C276 + (09:01:39, 1 January 2025)
- ML19320C275 + (09:01:40, 1 January 2025)
- AECM-80-108, Interim Deficiency Rept Re Incorrect Pipe Supplied by Tx Pipe Bending.Heavier Wall Would Not Cause Overstressed Condition.Generic Implications in Other Applications Under Investigation.Final Rept Will Be Submitted by 800829 + (09:01:41, 1 January 2025)
- ML19320C272 + (09:01:43, 1 January 2025)
- ML19320C273 + (09:01:43, 1 January 2025)
- ML19320C271 + (09:01:44, 1 January 2025)
- ML19320C269 + (09:01:45, 1 January 2025)
- ML19320C270 + (09:01:45, 1 January 2025)
- ML19320C268 + (09:01:49, 1 January 2025)
- ML19320C267 + (09:01:50, 1 January 2025)
- ML19320C265 + (09:01:51, 1 January 2025)
- ML19320C263 + (09:01:53, 1 January 2025)
- ML19320C261 + (09:01:53, 1 January 2025)
- ML19320C259 + (09:01:54, 1 January 2025)
- ML19320C258 + (09:01:54, 1 January 2025)
- ML19320C257 + (09:01:55, 1 January 2025)
- ML19320C256 + (09:01:56, 1 January 2025)
- ML19320C255 + (09:01:58, 1 January 2025)
- 05000289/LER-1980-012-01, /01T-0:on 800627,during Review of Environ Qualification of Equipment Required to Operate During Main Steam Line Break Per IE Bulletin 79-01B,found That post- Accident Analysis Exceeded Previous Figures + (09:01:59, 1 January 2025)
- 05000320/LER-1980-024-03, /03L-0:on 800529,while in Recovery Mode of Operations,Pressure Transducer Used to Monitor RCS Pressure Was Isolated from RCS W/O Control Room Knowledge.Caused by Deficient Sop.Valve Reopened within Tech Spec Action Period + (09:02:01, 1 January 2025)
- 05000289/LER-1980-012, Forwards LER 80-012/01T-0 + (09:02:03, 1 January 2025)
- 05000327/LER-1980-097-03, /03L-0:on 800616,cooling Tower Blowdown Line Effluent Monitor (0-FR-27-175) Declared Inoperable.Flow Monitor Recorder Indicated Incorrect Flow.Flow Element Recalibr & Design Change in Progress + (09:02:05, 1 January 2025)
- 05000320/LER-1980-024, Forwards LER 80-024/03L-0 + (09:02:08, 1 January 2025)
- 05000327/LER-1980-097, Forwards LER 80-097/03L-0 + (09:02:13, 1 January 2025)
- ML19320C245 + (09:02:15, 1 January 2025)
- ML19320C244 + (09:02:25, 1 January 2025)
- ML19320C242 + (09:02:25, 1 January 2025)
- ML19320C241 + (09:02:26, 1 January 2025)
- ML19320C240 + (09:02:27, 1 January 2025)
- ML19320C238 + (09:02:29, 1 January 2025)
- ML19320C239 + (09:02:29, 1 January 2025)