MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
i
.o E' A n'tATT? TJE,y)r." 07 ('P5t'. r.h7 EvFERIENCE DOCKET No. 50-- 282 L711T Pref rie Island No.1 DATE 800701 C'"TI ETED BY A. A. Hunstad TI1ErP.ONE 612-288-4767 o
j P.?!T9 June 1980
" The unit was in Load Follow operation this month. On 6-29 power a.
g was reduced to 50% to do the monthly turbine valves test. A N resulting power distribution imbianc5 f reed operation at or below 50% power for the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
C
.[
l 8007160S(o2.
/
1 DAILY UNIT POWER OUTPUT DOCKET NO. 50- 282 UNIT Prairie Island No. 1 DATE 800701 COMPLETED BY A. A. mmatad TELEPHONE 612-388-4767 MONTH Jun . 1980 AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net DH 1 463 17 463 d
. 2 467 18 465 m
3 464 19 459
)
4 468 20 464 469 21 464 5
468 22 465 6
348 23 467 7
~
382 24 466 8
465 25 464 9
469 26 463 10 468 27 467 11 465 28 466 12 465 29 203 13 466 30 237 14 13 466 31 16 466 Average loads above503 }!We-Net are due to cooler condenser circulating water.
(.
r r'm +
. -; ~;7 . T:. :.ijO~:
C DUCKET NO 50- 282 DATE 800701 COMPLETED BY A. A. Hunstad OPERATING STATUS TELEPHONE 612-338-4767
- 1. Unit Name: Praitie Island No. 1
- 2. Reporting Period: June 1980
- 3. Licensed Thermal Power (MWt): 1650
- 4. Nameplate Racing (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable capacity (Gross MWe):
U 7. Maximum Dependable Capacity (Net MYc):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
o x Give Reason:
j
,, 9.
Power Level To bhich Restricted, If Any (Net MWe):
o Reasons for Rastrictions, If Any:
10.
("'
This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Period 720 4367 57335
- 12. Number Of Hours Reactor Was Critical 720.0 4235.9 45444.3'
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 5531.9
- 14. Hours Generator On Line 720.0 4230.8 44354.3
- 15. Unit Resc:ve Shutdown Foure 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1128884 6834942 68913936
- 17. Gross Electrical Energy Generated (MWH) 340900 2114380 22268050
- 18. Net Electrical Energy Generated (MWH) ,318484 1981867 20821119
- 19. Unit Service Factor 100.0 96.9 77.4
- 20. Unit Availability Factor 100.0 96.9 77.4
- 21. Unit Capacity Factor (Using MDC Net) 87.9 90.2 72.2
- 22. Unit Capacity Factor (Using DER Net) 83.5 85.6 68.5
- 23. Unit Forced Outage Rate 0.0 0.0 12.5
,(~ 24. Shutdowns Scheduled Over Next 12 kbuchs (Type, Date and Duration of Each):
Refueling, August 15, 1980, 8 weeks
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
DOCKET NO. 50- 282 REPORT MONTH June 1980 DATE 800701
- COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 a e n % [u Licensee ae u Cause & Corrective Date $. M7 'E d8 Event $ .$ 6 .n Action to M %$ $ ~8 ii S Report # EO 88 Prevent Recurrence
$ SSE "
$0
$"p O O
~ "
et 0 .
- n. 800629 F 0.0 11 N/A N/A N/A N/A Reduced power to 50% to do the E monthly turbine valves test. A Z resulting power distribution imbalance forced operation at or below 50% for the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File ,
F-Administrative (NUREG-0161)
G-Operational Error (Explain) 5 li-Other (Explain Exhibit 1 - Same Source
"AR'tATTU .gNM;" M 0"SR\TitM RYPERIENCE POCKET NO. 50- 306 UMIT Prairin Island No. 2 DATE 800701 CC"?f,ETED DY A. A. Htmmend TELEPIIO:'E 612-288-4767 o
g M0'IPI June 1980
" The unit was in Load Follow operation this month. The unit was m
g shuthwn at 0120 on 6-4 to return 2M Transformer to service and to A do maintenance on the turbine oil system. At the restart on 6-6 the turbine was =anually tripped due to high vibration, and was again put in service at 0o51 af ter balancing.
On 6-7 a storm caused loss of two lines from the substation.
Questions as to capacity of the remaining lines and system stability
{ caused an administrative restriction of 65% power to be placed on the unit from 6-9 to 6-13. The unit was returned to full power on 6-13 when one of the downed lines was returned to service.
l
,l t
DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 800701 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH June, 1980 DAY AVERACE LOAD MWe-Net DAY AVERACE LOAD MWe-Net
$ 1 496 17 466
.i
. 2 498 18 361
~
1 3 483 19 451 2
4 -8 20 7 9
5 -19 21 490 6 321 22 487 7 423 23 488 8 500 24 491 9 236 25 487
- 10. 292 26 483 11 293 27 487 12 287 28 492 13 332 29 501 14 493 30 496 15 463 31 16- 470 ,
/
sV Average loads above 500 MWe-Net are due to cooler / condenser circulating water.
/.
L o ./'
- /
1'> l t-
t
)
. . .a.i : .::C L.C 8i.?ar DOCKET NO 50- 306 DATE 800701 COMPLETED BY A. A. Hunstad OPERATING STATUS TELEPHONE 612-388-4767
- 1. Unit Name: Prairie Island No. 2
- 2. Reporting Period: Jim. 1980
- 3. Licensed Thermal Power (M2t): 1650
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (het MUe): 530
- 6. Maximum Dependable Capscity (Grecs MWe): <
d 7. Maximum Dependable Capacity (Net MWe):
,- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
5 Give Reason:
c'
, 9. Power Level To Which Restricted, If Any (Net MWe):
Reasons for Restrictions, If Any:
('"u1 a
10.
This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Peried 720 4367 48453
- 12. Number Of Hours Reacter Was Critical 679.5 3064.8 42193.6
- 13. Reactor Reserve Shutdown Hours 40.5 82.9 1488.9
- 14. Hours Generator On Line 667.2 2997.9 41398.9
- 15. Unit Reserve Shutdown Hours _
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1003265 4681932 64354435
- 17. Gross Electrical Energy Generated (MWH) 317420 1508260 20562390
- 18. Net Electrical Energy Generated (IfWH) 295518 1406745 19245377
- 19. Unit Service Factor 92.7 68.6 85.4
- 20. Unit Availability Factor 92.7 ,
68.6 85.4
'21. Unit Capacity Factor (Using MDC Net) 82.1 64.4 79.4
- 22. Unit Capacity Factor (Using DER Net) 77.4 60.8 74.9
.231 Unit Forced Outage Rate 0.0 0.4 4.6
, (' 24. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
Refueling, January, 1981, 6 weeks
- 25. If Shut Down at Eua Of Report Period, Estimated Date of Startup:
4 UNIT SIRITDOWNS AND POWER REDUCTIONS .
DOCKET NO. 50 w REPORT HONTil June 1980 UNIT NAME Prairie Island No.2 DATE 800701 COMPLETED BY A. A. Ihma tad TELEPIIONE 612-388-4767
.-v c n % u% Licensee ay u Cause & Corrective Date E. O7 E O8 Event 38 8 .n Action to N $$ $ "E I$ N Report # 5, O @$ Prevent Recurrence a~
$ SS$ "
oO s" g O O
N k
800604 S 49.2 B 3 N/A N/A N/A Shutdown to return 2M Transformer to service and perform mainten-
$ ance on the turbine oil system.
n.
800606 S 3.6 11 N/A N/A N/A N/A Manual turbine' trip because of high vibration.
800609 F 0.0 11 N/A N/A N/A N/A Power was reduced to 65% from 6-9 to 6-13 due to downed lines from substation.
F: Forced Reason Method: Exhibit C-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manuai Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)
C-Operational Error (Explain) 3 H-Other (Explain Exhibit 1 - Same Source I
t
~ .V* ' " ? G . ~':. vi]MT C - CORRECTED -
DOCKET NO 50- 306 DATE 800701 COMPLETED BY A. A. Huns tad OPERATING STATUS TELEPHONE 612-388-4767
- 1. Unit Name: Prairie Island No. 2
- 2. Reporting Period: May 1980 4
- 3. Licensed Thermal Power (MWt): __ 1650 _
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable Capacity (Gross MWe): 531 5 7, Maximum Dependable capacity (Net MWe): 500 g 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
E Give Reason:
cd
' O Power Level To Which Restricted, If Any (Net MWe):
- 9. __
Reasons for Restrictions, If Any:
( ~$} 10.
This Month Yr-To-Date Cumulativu
- 11. Hours In Reporting Period 744 3647 47733
- 12. Number Of Hours actor Was Critical 653.2 2385.1 41514.1
- 13. Reactor Reserve Shutdown Hours 0.0 42.4 1448.4
- 14. Hours Generator On Line 646.2 2330.7 40731.7
- 15. Unit Rescrve Shutdown Ecurs 0.0 0.0 0.3
- 16. Gross Thermal Energy Generated (MWH) 1038769 3678667 63351 70 _
- 17. Gross Electrical Energy Generated (MWH) 329920 1190840 l 20244970
-18. N9t Electrical Energy Generated (MWH) 308831 1111227 18949850
- 19. Unit Service Factor 86.9 63.9 85.3
- 20. Unic Availability Factor 86.9 63.9 85.3
- 21. Unit Capacity Factor (Using MDC Net) 63.0 60.9 79.4
- 22. Unit Capacity Factor (Using DER Net) 78.3 57.5 74.9
- 23. Unit Forced Outage Rate 0.3 0.5 4.7
,( 24. Shutdowns Schedaled vver Next 12 Months (Type, Date and Duration of Each):
l Refuelin.;, Jcb.1981, 6 weeks
- 25. 'If Shut Down at Ena Of Report Period, Estimated Date of Startup: