ML19320C257
| ML19320C257 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/07/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-10, NUDOCS 8007160549 | |
| Download: ML19320C257 (1) | |
Text
e Alacema Power Company 600 Nortn 18tn Street Post Office Bom 2641 0:rmingnam, Aterma 35291 Telephone 205 323-5341 k
h p,k,cyl,7,";2, Alabama Power tresournem erectnc sys:em July 7, 1980 Docket No. 50-348 Mr. James P. O'Reilly U. S. Nuclear Regulatory Ccamission Region II 101 Marietta Street, N. W.
Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
IE Bulletin 80-10, " Contamination of Nonradioactive System and Resulting Potential for Un:nonitored, Uncontrolled Release of Radioactivity to Enrironment," requested that Alabama Power Company perform a design and operation review of Farley Nuclear Plant Unit 1 to identify systems that p
are considered as nonradioactive, but could become contaminated due to leakage, valving errors, or other operating conditions in radioactive systems. It was further requested that a routine sa=pling/ analysis or monitoring program be established for these systems in order to properly identify any contaminating events. The ac'tions requested have been completed for Farley Unit 1.
Details regarding the completion of these requests have been documented and are available at Farley Nuclear Plant for NRC review.
If you have any questions, please advise.
Yours very truly, 7-b. Clayton, r.
RWS:de fool cc:
Mr. R. A. Thomas 3
Mr. G. F. Trowbridge
/
Mr. W. H. Bradford
//o
-+Mr. L. L. Kintner Office of I & E pNI
- 1 h Washington, D. C.
L, h/gbQ J
o 8007160517