ML19320C290
| ML19320C290 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/11/1980 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML19320C285 | List: |
| References | |
| NUDOCS 8007160609 | |
| Download: ML19320C290 (1) | |
Text
-
h B&R Activity 3-6-80 PDM Activity REV. 7-3-30 Es tima te 3
Report Bulge To Issue Liner Dwg.
7 Houston Engineering NCR *S-M3759A &
2-5-1024-0 (Defines
=
Liner Bulge j n To Engineering n Damaged Section) f y Phone B
g g
v
's v
1-14-80 1-1 1-24-80 3-6-80 3c
_J i
ner Repair eak Tightness)
I wk.*
Receive Liner Dwg. at Continue rep 5 op D g (4
{r"C mplete)
N
^
os u e
3-6-80 6 wks.*
I wk.*
V 2 Days
- d 7-3 PDM Change 4
Order 6 w s.*
te NCR to be written for the Liner Bulge g
stion occurred during RCB Void Repair lulge NCR to be referenced on NCR #S-C3461 Partial Dispositicto closeout of 3461 g
of NCR (2) 3ulge to be discussed in the RCB Voids Final
,5 g
to NRC, thus no delay in the Final Report
{g I wk.,
a m
E lmi maximum seam boundary Site Subcontracts Generate Extra o assist as applicaole Work Authorizatfor pg, 39 Estimate Cost of I day.
Iner plate section 9 site (if ?nssible)
Liner Removal
- tion 2 days
- PDM 9 Site, Gener l
ECAR, Permit Workte section 9 site l
I day 4 4 Home Office receipt of Dwg. 2-S-1024 g