Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248E149 + (23:14:42, 1 December 2024)
- ML20248E147 + (23:14:43, 1 December 2024)
- ML20248E145 + (23:14:43, 1 December 2024)
- ML20248E143 + (23:14:44, 1 December 2024)
- ML20248E136 + (23:14:45, 1 December 2024)
- PNO-II-89-036A, updates Info Provided on 890517 Re Ruptured Cs-137 Source Downhole Near Helena,Al.Mckenzie Methane,Inc Assumed Responsibiity for Discharging Water Consistent W/State & Local Regulations.Well Backfilled W/Concrete + (23:14:45, 1 December 2024)
- ML20248E133 + (23:14:46, 1 December 2024)
- ML20248E128 + (23:14:47, 1 December 2024)
- ML20248E131 + (23:14:47, 1 December 2024)
- ML20248E127 + (23:14:48, 1 December 2024)
- ML20248E123 + (23:14:49, 1 December 2024)
- 05000443/LER-1998-005, :on 980501,inoperability of SG Steam Line Pressure Protection Channels Was Noted.Caused by Procedural Deficiencies.Revised Procedures to Ensure Correct & Consistent Interpretation of Record Traces + (23:14:51, 1 December 2024)
- ML20248E116 + (23:14:52, 1 December 2024)
- ML20248E113 + (23:14:53, 1 December 2024)
- ML20248E114 + (23:14:53, 1 December 2024)
- ML20248E110 + (23:14:55, 1 December 2024)
- ML20248E108 + (23:14:57, 1 December 2024)
- ML20248E107 + (23:14:58, 1 December 2024)
- ML20248E102 + (23:14:59, 1 December 2024)
- ML20248E104 + (23:14:59, 1 December 2024)
- ML20248E100 + (23:15:00, 1 December 2024)
- ML20248E099 + (23:15:05, 1 December 2024)
- ML20248E098 + (23:15:08, 1 December 2024)
- 05000423/LER-1989-016, :on 890703,discovered That Required Fire Detection Surveillance for Control Bldg Hvac,Chiller & Computer Rooms Not Completed within Required Frequency. Caused by Personnel Error.Fire Watch Initiated + (23:15:12, 1 December 2024)
- ML20248E090 + (23:15:13, 1 December 2024)
- RBG-30470, Forwards Status Rept on Security Computer Program Upgrade. Rept Withheld + (23:15:14, 1 December 2024)
- ML20248E085 + (23:15:15, 1 December 2024)
- ML20248E084 + (23:15:15, 1 December 2024)
- RBG-30453, Discusses Progress of Procurement & Evaluation Activities for Sys Meeting Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec Currently on Hold.Util Preparing Amend Request to Extend License Condition to Future Date + (23:15:16, 1 December 2024)
- ML20248E081 + (23:15:16, 1 December 2024)
- ML20248E080 + (23:15:17, 1 December 2024)
- ML20248E079 + (23:15:17, 1 December 2024)
- ML20248E075 + (23:15:18, 1 December 2024)
- ML20248E072 + (23:15:19, 1 December 2024)
- ML20248E070 + (23:15:20, 1 December 2024)
- IR 05000313/1989008 + (23:15:21, 1 December 2024)
- ML20248E058 + (23:15:22, 1 December 2024)
- ML20248E057 + (23:15:23, 1 December 2024)
- ML20248E053 + (23:15:23, 1 December 2024)
- SNRC-1578, Provides Info Re Temp Profile Inside Primary Containment Used for Environ Qualification.Results of Review of Actual Test Temps Indicate Sufficient Margin Exists to Envelope Supporting Calcuation & Environ Qualification Profile + (23:15:24, 1 December 2024)
- ML20248E050 + (23:15:25, 1 December 2024)
- DD-89-04, Advises That Time for Commission to Review Directors Decision DD-89-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 890721.W/Certificate of Svc.Served on 890808 + (23:15:26, 1 December 2024)
- ML20248E045 + (23:15:29, 1 December 2024)
- ML20248E044 + (23:15:29, 1 December 2024)
- ML20248E041 + (23:15:30, 1 December 2024)
- ML20248E040 + (23:15:31, 1 December 2024)
- ML20248E039 + (23:15:32, 1 December 2024)
- ML20248E036 + (23:15:33, 1 December 2024)
- ML20248E035 + (23:15:34, 1 December 2024)
- 05000412/LER-1989-006, :on 890116,component Cooling Pump C Exhibited Sudden Loss of Flow & Immediately Secured.Caused by Expansion Joint Liner/Weld Failure,Allowing Liner to Be Drawn Into Pump Impeller.Part 21 Related + (23:15:37, 1 December 2024)
- ML20248E031 + (23:15:39, 1 December 2024)