ML20248E044
| ML20248E044 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/31/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20248E051 | List: |
| References | |
| NUDOCS 8904120114 | |
| Download: ML20248E044 (2) | |
See also: IR 05000313/1989008
Text
_ _ _ - _ _ _ _ - _ _ _ _ - - _
_
,
' a . . a.
.
..
MAR 31 1989
In' Reply Refer To:
Dockets: -50-313/89-08
50-368/89-08
Arkansas Power & Light Company
]
-ATTN: Mr. Gene Campbell
i
Vice President, Nuclear
Operations
P.O. Box 551
L tile Rock, Arkansas 72203
i
Gentlemen:
.This refers to the inspection conducted by Mr.'R. C. Stewart of this office
during.the period February 27 through March 3, 1989, of activities authorized
by NRC Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One, Units 1
and 2, and to the discussion of our findings with members of your staff at the
conclusion of the inspection.
Areas examined during the inspection were the Units 1 and 2 inservice testing _
programs for pumps and valves. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector. The inspection findings are
documented in the enclosed inspection report.
Within the. scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
' identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
'
Should you have an" questions concerning this inspection, we will be pleased to
' discuss them with you.
l
Sincerely.
Ori inal Signed ']y
6
- L J. Callan
,
L. J. Calitn, Director
Division of Redctor Projects
Encl urt:
(seenextpag.)
r
R? kpo
D:
00
LJCalla@n
RI\\
PS
C:M S
RStewart;1m
IBa nes
JL i hoan
$ /4/Y89
g/p/89
p
/89
3 /3l /89
Of
8904120114 890331
ADOCK 05000313
/
k
Q
_ _ _ _ _ - - _ . _ - _ _ _ _ _ - - _
==
-
.
.e
.
,
..
.
.n
.'
'
3
1.
I
~
Arkansas Power & Light Company l.
-2-
-l
"
1
'
)
. , .
. .;
J
^
Enclosure:
.
- f
~ Appendix - NRC. Inspection Report
50-313/89-08-
.]
,
-50-368/89-08,
l
1
cc w/ enclosure:
.' Arkansas Nuclear'One:
- ATTN:
J. M. Levine, Executive ...
Director, Nuclear Operations
P.O. Box 608
-Russellville, Arkansas '72801
I
Arkansas Radiation Control Program Director
bec to DMBJ(IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/A)
~
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- DRS
- I. Barnes
- C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C.Poslusny,NRRProjectManager(MS:
13-D-18)
- R. Stewart
- w/766
,
4