Forwards Insp Repts 50-313/89-08 & 50-368/89-08 on 890227-0303.No Violations or Deviations Noted
ML20248E044
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20248E051 List:
References
NUDOCS 8904120114
Download: ML20248E044 (2)


See also: IR 05000313/1989008

Text

_ _ _ - _ _ _ _ - _ _ _ _ - - _

_

,

' a . . a.

.

..

MAR 31 1989

In' Reply Refer To:

Dockets: -50-313/89-08

50-368/89-08

Arkansas Power & Light Company

]

-ATTN: Mr. Gene Campbell

i

Vice President, Nuclear

Operations

P.O. Box 551

L tile Rock, Arkansas 72203

i

Gentlemen:

.This refers to the inspection conducted by Mr.'R. C. Stewart of this office

during.the period February 27 through March 3, 1989, of activities authorized

by NRC Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One, Units 1

and 2, and to the discussion of our findings with members of your staff at the

conclusion of the inspection.

Areas examined during the inspection were the Units 1 and 2 inservice testing _

programs for pumps and valves. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspector. The inspection findings are

documented in the enclosed inspection report.

Within the. scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

' identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

'

Should you have an" questions concerning this inspection, we will be pleased to

' discuss them with you.

l

Sincerely.

Ori inal Signed ']y

6

- L J. Callan

,

L. J. Calitn, Director

Division of Redctor Projects

Encl urt:

(seenextpag.)

r

R? kpo

D:

00

LJCalla@n

RI\\

PS

C:M S

RStewart;1m

IBa nes

JL i hoan

$ /4/Y89

g/p/89

p

/89

3 /3l /89

Of

8904120114 890331

PDR

ADOCK 05000313

/

k

Q

PDC

_ _ _ _ _ - - _ . _ - _ _ _ _ _ - - _

==

-

.

.e

.

,

..

.

.n

.'

'

3

1.

I

~

Arkansas Power & Light Company l.

-2-

-l

"

1

'

)

. , .

. .;

J

^

Enclosure:

.

f

~ Appendix - NRC. Inspection Report

50-313/89-08-

.]

,

-50-368/89-08,

l

1

cc w/ enclosure:

.' Arkansas Nuclear'One:

ATTN:

J. M. Levine, Executive ...

Director, Nuclear Operations

P.O. Box 608

-Russellville, Arkansas '72801

I

Arkansas Radiation Control Program Director

bec to DMBJ(IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

~

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • DRS
  • I. Barnes
  • C. Harbuck, NRR Project Manager (MS:

13-D-18)

  • C.Poslusny,NRRProjectManager(MS:

13-D-18)

  • R. Stewart
  • w/766

,

4