ML20248E128

From kanterella
Jump to navigation Jump to search
Notice of OMB Review of Info Collection Entitled Approach for Using PRA in Risk-informed Decisions on Plant Specific Changes to Current Licensing Basis,Rgs RG-1.174 Through RG-1.178 & Solicitation of Public Comment
ML20248E128
Person / Time
Issue date: 05/01/1998
From: Shelton B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
To:
Shared Package
ML20248E046 List:
References
RTR-REGGD-01.174, RTR-REGGD-01.175, RTR-REGGD-01.176, RTR-REGGD-01.177, RTR-REGGD-01.178, RTR-REGGD-1.174, RTR-REGGD-1.175, RTR-REGGD-1.176, RTR-REGGD-1.177, RTR-REGGD-1.178 NUDOCS 9806030192
Download: ML20248E128 (4)


Text

.

e

[7590-01-P] -

U. S. NUCLEAR REGULATORY COMMISSION l

l Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY:

U. S. Nuclear Regulatory Commission (NRC) 1

.i' l

I ACTION:

Notice of the OMB review of information collection and solicitation of public I

' comment.

l l

l

SUMMARY

The NRC has recently submitted to OMB for review the following l

l proposal for the collection of information under the provisions of the Papenwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC I

l hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a curuntly valid OMB control number.

1.

Type of submission: Revision l

l 2.

The title of the information collection: "An Approach for Using Probcbilistic Risk Assessment in Risk-informed Decisions on Plant-Specific Changes to the Current Licensing Basis," Regulatory Guides RG-1.174 through RG-1.178 3.

The form number if applicable: Not applicable P

0, 20 m

~,$1060$oM7

4.

How often the collection is required: Use of the new risk-informed methodology for making changes in the licensing basis of operating plants in the areas of inservice inspection (ISI), inservice testing (IST),

graded quality assurance (GQA), and technical specifications (TS), is available to alllicensees but is not required. Licensees may make voluntary submittals when, and if, in their judgment, it is to their advantage to do so (for example, to improve plant safety, reduce costs, gain operating flexibility).

5.

Who will oe required or asked to report: Licensees of nuclear power plants may report when, and if, in their judgment, it is to their advantage to do so.

6.

An estimate of the number of responses: ISI: 6, IST: 3, QA: 1 TS: 20 7.

The estimated number of annual respondents: ISI: 6, IST: 3, QA: 1, TS: 20 8.

An estimate of the total number of hours needed annually to complete the requirement or request (per respondent): ISI: 6,200, IST: 5,200, QA: 4,000, TS: 1,060 i

9.

An indication of whether Section 3507(d), Pub. L.104-13 applies: Not applicable 10.

Abstract: In the specific areas of ISI, IST, GQA, and TS, a new series c

I of Regulatory Guides provides a risk-informed method fnr licensees to use in reqesting changes to their current licensing bases (CLB). No l

changes or additions have been made to anv rulee or regulations in conjunction with the issuance of this series of guides. The new method will be a voluntary attemative to the deterrrinistically-based CLB change method previously used (which will remain acceptable as an attemative to the new risk-informed method).

l The new risk-informed altemative method will allow licensees to i

l concentrate on plant equipment and operations that art, most critically important to plant safety so as to achieve a savings in total effort and greater operating flexibility with an insignificant change in overall safety.

)

i The guides specify the records, analyses, and documents that licensees are expected to prepare in support of risk-informed changec to their CLB in the specified areas.

A copy of the final supporting statement may be viewed free of charge at the NRC Public l

l Document Room,2120 L Street, NW (lower level), Washington, DC. OMB clearance j

roquests are available at the NRC worldwide web site (http://www.nrc. gov) under the FedWorld collection link on the home page tool bar. The document will be available on the NRC home page site for 60 days after the signature date of this notice.

Comments and questions should be directed to the OMB reviewer by (insert date 30 days after publication in the Federal Reaister):

Erik Godwin Office of Information and Regulatory Affairs (3150-0011) l

(

NEOB-10202 Office of Management and Budget Washington, DC 20503

y-i i

Comments can also be submitted by telephone at (202) 395-3084.

I The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.

l Dated at Rockville, Maryland, this

.5 f day ofc; A 1998.

i For the Nuclear Regulatory Commission.

At.,.A

~

n GIda

. ShsffoTCNRd_C!darance Officer i

' Office of t Chief Information Officer l

\\

I l

1 I

h l

--__. __-__