Forwards Insp Rept 50-285/89-09 on 890201-28 & Notices of Violation & Deviation.Three Unresolved Items Also Identified in Insp Rept
ML20248E102
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20248E105 List:
References
NUDOCS 8904120127
Download: ML20248E102 (2)


See also: IR 05000285/1989009

Text

_ _ _ _ _ _ , _ _ _ _ . _ _ _ _ _ _ . _. _ _ _ .

i

u,'

.

( ,

  • '

wn s i em i

!

In Reply Refer To:  !

Docket: 50-285/89-09 ]

'

Omaha Public Power District i

ATTN: Mr. Kenneth J. Morris  ;

Division Manager - Nuclear Operations j

1623 Harney Street

4

Omaha, Nebraska 68102 )

'

Gentlemen:

~

This refers to the inspection conducted by Messrs. P.-H. Harrell, T. Reis, and 4

R. P. Mullikin of this office during the period February 1-28, 1989, of 1

activities authorized'by NRC Operating License DPR-40 for the Fort Calhoun

Station, and to the discussion of our findings with you and other members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included review of previously identified q

items, licensee event report followup, operational safety verification, plant j

tours, monthly maintenance observations, monthly surveillance observations, ,

security observations, radiological protection observations, in-office review I

of periodic and special reports, and review of cold weather preparations.

Within these. areas, the inspection consisted _of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

appeared to deviate from a commitment made to the NRC. This item and reference

to the commitment are identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

Three unresolved items are identified in paragraph 6 of the enclosed inspection

report.

We have also examined actions you have taken with regard to previously i

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed inspection report.

RIV:RI SRI

A

DRP/B 7 h C:DRP/B f DRPW h

TReis/nc PHHarrell RPMullikin TFWesterman Dan \

03/13/89 03/13/89 03/>[/89 03/p//89 03/30/89 .

/ 1  ;

8904120127 890331 ' (

POR ADOCK 05000285

g PDC (

_ _ _ _ _ _ .

.

' '

s s

.. ..

Omaha Public Power District -2- l

'

l

l The responses directed by this letter and the accompanying Notices are not ,

l subject to the clearance procedures of the Office of Management and Budget as  !

l required by the Paperwork Reduction Act of 1980, PL 96-511.

j

Should you have any questions concerning this inspection, we will be pleased.to  ;

discuss them with you.

Sincerely,

@inal Sigud &: i

'A.B. BEACH

[L.J. Callan, Director

Division of Reactor Projects

Enclosures:

'

1. _ Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report-

50-285/89-09

cc w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station.

P.O. 80x 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Nebraska Radiation Control Program Director

bectoDMB(IE01)

bec distrib. by RIV:

R. D. Martin, RA * MIS System

  • SectionChief(DRP/B) *DRP
  • RIV File *ProjectEngineer(DRP/B)
  • RSTS Operator *P. Mi.lano, NRR Project Manager (MS 13-D-18)

Lisa Shea, RM/ALF *RRI

  • DRS *RPB-DRSS
  • w/766