Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248E740 + (23:07:24, 1 December 2024)
- ML20248E742 + (23:07:24, 1 December 2024)
- ML20248E738 + (23:07:27, 1 December 2024)
- ML20248E737 + (23:07:28, 1 December 2024)
- ML20248E733 + (23:07:29, 1 December 2024)
- ML20248E729 + (23:07:30, 1 December 2024)
- ML20248E728 + (23:07:31, 1 December 2024)
- 05000354/LER-1989-017-01, :on 890830,reactor Scram Occurred Due to Result of Low Reactor Pressure Vessel Water Level Signal.Caused by Installation of Air Line Failure During Plant Const.Leak Check of All Soldered Connections Done + (23:07:32, 1 December 2024)
- 05000325/LER-1988-028, :on 881123,pipe Crack Indications Revealed Existence of 238 Indications in 19 of 65 Welds.Caused by IGSCC of Associated Welds.Addl Testing,Repair &/Or Mods Will Be Conducted Per Generic Ltr in Future Outages + (23:07:35, 1 December 2024)
- IR 05000260/1989036 + (23:07:59, 1 December 2024)
- IR 05000361/1998001 + (23:08:07, 1 December 2024)
- ML20248E718 + (23:08:07, 1 December 2024)
- ML20248E713 + (23:08:11, 1 December 2024)
- U-603011, Informs That MD Needles,License SOP-31108-1,LT Pickley, License SOP-31018-1,FE Worrel,License SOP-30547-2 & Me Mcclure,License OP-30894,no Longer Have Need for Operator/Senior Operator License + (23:08:12, 1 December 2024)
- IR 05000313/1989007 + (23:08:15, 1 December 2024)
- ML20248E709 + (23:08:16, 1 December 2024)
- ML20248E708 + (23:08:16, 1 December 2024)
- ML20248E705 + (23:08:17, 1 December 2024)
- ML20248E704 + (23:08:18, 1 December 2024)
- ML20248E702 + (23:08:20, 1 December 2024)
- ML20248E700 + (23:08:20, 1 December 2024)
- NRC-89-0089, Forwards Errata Package to Rev 2 of Plant Updated FSAR + (23:08:21, 1 December 2024)
- IR 05000260/1989030 + (23:08:27, 1 December 2024)
- NRC-89-0078, Forwards Response to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers, Ensuring That Molded Case Breakers Purchased for Use in safety-related Applications Verifiably Traceable to Circuit Breaker Mfg + (23:08:28, 1 December 2024)
- ML20248E696 + (23:08:29, 1 December 2024)
- ML20248E695 + (23:08:30, 1 December 2024)
- ML20248E694 + (23:08:31, 1 December 2024)
- IR 05000456/1989001 + (23:08:51, 1 December 2024)
- ML20248E690 + (23:08:51, 1 December 2024)
- ML20248E689 + (23:08:52, 1 December 2024)
- ML20248E688 + (23:08:52, 1 December 2024)
- ML20248E687 + (23:08:53, 1 December 2024)
- ML20248E684 + (23:08:54, 1 December 2024)
- ML20248E686 + (23:08:54, 1 December 2024)
- ML20248E682 + (23:08:55, 1 December 2024)
- ML20248E683 + (23:08:55, 1 December 2024)
- ML20248E681 + (23:08:56, 1 December 2024)
- 05000271/LER-1989-015, :on 890310,lo Lo Reactor Water Level Signal from ECCS B Resulted in Initiation Signals to HPCI & Rcic,Trip of RHR B Svc Water Pump,Trip of Uninterruptible Power Supply a & Startup of Diesel Generator B + (23:08:58, 1 December 2024)
- ML20248E679 + (23:08:59, 1 December 2024)
- ML20248E676 + (23:09:00, 1 December 2024)
- NRC-89-0207, Forwards Control Sys Common Power Source Failure Analysis Evaluation Rept for Enrico Fermi Power Plant Unit 2, for Review,Per + (23:09:00, 1 December 2024)
- ML20248E673 + (23:09:01, 1 December 2024)
- ML20248E668 + (23:09:02, 1 December 2024)
- ML20248E672 + (23:09:02, 1 December 2024)
- ML20248E666 + (23:09:03, 1 December 2024)
- ML20248E664 + (23:09:04, 1 December 2024)
- ML20248E663 + (23:09:05, 1 December 2024)
- ML20248E662 + (23:09:05, 1 December 2024)
- ML20248E660 + (23:09:06, 1 December 2024)
- ML20248E654 + (23:09:08, 1 December 2024)
- ML20248E653 + (23:09:08, 1 December 2024)