ML20248E704

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/89-07 & 50-368/89-07 on 890313-17.No Violations or Deviations Noted
ML20248E704
Person / Time
Site: Arkansas Nuclear  
Issue date: 03/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20248E706 List:
References
NUDOCS 8904120341
Download: ML20248E704 (2)


See also: IR 05000313/1989007

Text

.

. _ _ _ _

_

_ _

_.

_

._ ,

";

$"'

p g!'O

., g ;

.9-

q

H

,

, ..

3

_

^

,

'3

,;..

4;

>

MAR 31 1989

,f

,y

s

.

,

.

,

.

InRep!)LRefer2To:

'

'

9

!

%.

Dockets:

50-313/89-07

'

50-368/89-07'

,.

.

,

3

~ , .

.

,

~i

)

~~ Arkansas'PowerELightCompany

'ATTNi

Mr." Gene _ Campbell .

LVice President, Nuclear

1

Op6pations '~

m

'

.P.O. Bcx 551

,

-

'

'Little. Rock, Arkansas 172203'

Gentlemen:

This refers to the inspection conducted by Mr. P. C. Wagner of this office

during the period March 13-17, 1989, of activities authorized by NRC Operating

' Licenses DPR-51 and NPF-6 for the Arkansas Nuclear'One, Units 1 and 2,.and to.

the~ discussion of our findings with Mr. J. Vandergrift and other members of

your staff'at the. conclusion of the inspection.

n

The area examined during the inspection included commitments'for ANO, Units 1-

and 2, .to actions to prevent ;10w-temperature overpressure conditions and

'"

instrument calibration.

Within these areas, the, inspection consisted of

. selective" examination of' procedures and representative records, interviews with.

personnel, and observations by the NRC inspector

The inspection findings are.

documented in the enclosed . inspection report.

Within the scope of the inspection, no violations'or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

i

' discuss;them with you.

Sincerely,

,'

y

Original Siped By

,

A. B. Beach

L. J. Callan, Director .

'

Division of Reactor Projects

,

,

'/ o

Enclosure:

App /Attachmentendix - NRC Inspection Report

I

'

w

,

-

50-313/89-07

.

50-368/89-07

1

! ' l.

-cc w/ enclosure:

(see next p e)

'

RIV:RIk

C:PSSY

D: RSN

0

RP

,

PCWagner/tw

TFStetka

JL ilhoan

LJ(allan

L

3 /27/89

3 /71/89

j/W89

3 /$l /89

ggM

I

8904120341 890331

PDC

.{(

PDR

ADOCK 05000313

'"

O

'

- _ _ _ _ _ - _ _ _ _ _ - _ - - - _ _ _ - _

_ _ _ _ - _ _ _

-

_

..

!

g.

J

hw.

.

t.

'

,

.

,

,

,

,

,

Arkansas Power'& Light Company

2

l

cc w/ enclosure:

'

Arkansas Nuclear One

,

ATTN:

J. M. Levine, Executive

Director, Nuclear: Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control, Program Director

bec to DMB (IE01)

bec distrib. by RIV:

.

  • RRI-

'

  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, P' 'ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operatur
  • Project Engineer, DRP/A
  • DRS
  • P.-Wagner
  • T. Stetka
  • C. Harbuck, NRR Project Manager (MS:

13-D-18)

  • C. Poslusny, NRR Project Manager (MS:

13-D-18)

  • w/766

,

_

__.__.______m_

. _ _ _ _ _ _ _ _ _ _ _ . - - - - -

. _ _ . - - - - _ - . - - - - _ - -