Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248E852 + (23:06:20, 1 December 2024)
- ML20248E848 + (23:06:21, 1 December 2024)
- ML20248E844 + (23:06:22, 1 December 2024)
- ML20248E843 + (23:06:23, 1 December 2024)
- ML20248E840 + (23:06:24, 1 December 2024)
- ML20248E839 + (23:06:24, 1 December 2024)
- ML20248E838 + (23:06:25, 1 December 2024)
- ML20248E834 + (23:06:26, 1 December 2024)
- ML20248E833 + (23:06:27, 1 December 2024)
- ML20248E830 + (23:06:28, 1 December 2024)
- ML20248E828 + (23:06:29, 1 December 2024)
- ML20248E826 + (23:06:30, 1 December 2024)
- ML20248E825 + (23:06:30, 1 December 2024)
- ML20248E823 + (23:06:31, 1 December 2024)
- ML20248E817 + (23:06:32, 1 December 2024)
- ML20248E816 + (23:06:33, 1 December 2024)
- ML20248E815 + (23:06:34, 1 December 2024)
- ML20248E813 + (23:06:34, 1 December 2024)
- ML20248E807 + (23:06:35, 1 December 2024)
- 05000425/LER-1989-026, :on 890829,high Energy Line Break Valve for Steam Generator Blowdown Isolation Not Tested within ASME Section XI Interval.Caused by Incomplete Communications. Personnel Counseled & Memo Issued Re Testing + (23:06:37, 1 December 2024)
- ML20248E804 + (23:06:38, 1 December 2024)
- ML20248E802 + (23:06:39, 1 December 2024)
- ML20248E799 + (23:06:40, 1 December 2024)
- ML20248E800 + (23:06:40, 1 December 2024)
- ML20248E798 + (23:06:42, 1 December 2024)
- ML20248E797 + (23:06:42, 1 December 2024)
- ML20248E795 + (23:06:43, 1 December 2024)
- ML20248E794 + (23:06:43, 1 December 2024)
- ML20248E791 + (23:06:44, 1 December 2024)
- ML20248E789 + (23:06:45, 1 December 2024)
- ML20248E786 + (23:06:46, 1 December 2024)
- ML20248E788 + (23:06:46, 1 December 2024)
- ML20248E785 + (23:06:47, 1 December 2024)
- ML20248E783 + (23:06:48, 1 December 2024)
- ML20248E784 + (23:06:48, 1 December 2024)
- ML20248E780 + (23:06:49, 1 December 2024)
- ML20248E781 + (23:06:49, 1 December 2024)
- ML20248E778 + (23:06:50, 1 December 2024)
- ML20248E777 + (23:06:52, 1 December 2024)
- ML20248E775 + (23:06:53, 1 December 2024)
- ML20248E774 + (23:06:53, 1 December 2024)
- ML20248E773 + (23:06:56, 1 December 2024)
- 05000285/LER-1989-014, :on 890519,auxiliary Feedwater Panel Instrumentation Outside Design Basis Revealed.Caused by Deficiencies in Instrumentation.Fire Watch Established & Stated Abnormal Operating Procedure Modified + (23:07:02, 1 December 2024)
- ML20248E769 + (23:07:03, 1 December 2024)
- 05000352/LER-1989-051, :on 890831,control Room Emergency Fresh Air Supply Sys Inadvertently Secured from Chlorine Isolation Mode of Operation,Causing Sys Inoperability.Caused by Personnel Error.Isolation Manually Initiated + (23:07:06, 1 December 2024)
- ML20248E765 + (23:07:08, 1 December 2024)
- ML20248E764 + (23:07:09, 1 December 2024)
- ML20248E762 + (23:07:10, 1 December 2024)
- ML20248E761 + (23:07:11, 1 December 2024)
- ML20248E760 + (23:07:11, 1 December 2024)
- 05000254/LER-1989-001-03, :on 890106,RCIC Pump Discharge Inboard Isolation Valve Failed to Open from Full Closed Position. Caused by Binding of Torque Switch on Valve Operator.Switch Replaced.Reportability Per Part 21 Possible + (23:07:14, 1 December 2024)
- IR 05000416/1998005 + (23:07:17, 1 December 2024)