ML20248E777

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amends 89 & 82 to Licenses DPR-42 & DPR-60,revising Effective Limitation of Existing RCS Heatup & Cooldown Curves from 15 to 20 EFPYs
ML20248E777
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/28/1989
From: Diianni D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20248E766 List:
References
NUDOCS 8910050418
Download: ML20248E777 (2)


Text

_.

'.. s.

l<i

~

7590-01 UNITED STATES NUCLEAR REGULATORY COMISSION l

-PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-282 AND 50-306 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (Comission) has issued Amendment Nos. 89 and 82 Facility to Operating License Nos. DPR-42 and DPR-60-issued to Northern States Power Company (licensee) which revised the Technical Specifications for operation of the Prairie Island Nuclear Generating Plant, Unit Nos. I and 2 located in Goodhue County, Minnesota.

The amendment is effective as of the date of issuance.

The amendment revised the Technical Specifications by modifying the pressure-

' temperature limits taking into consideration the irradiation effects of the embrittlement of the reactor vessel material up to 20 effective full power years. Other modifications are administrative in nature serving to clarify the existing requirements.

The application for the amendment complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required q

by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on June 8, 1989 (54 FR 24609).

No request for a hearing or petition for leave to intervene was filed following this notice.

)

891005041e 890gg PDR ADDCK 050002B2 P

PNU

_ _ _ = - - _ _ _ _ _ - _ _ _.

____________________________f

4 L The Comission has prepared an Environmental Assessment related to the I

l action and has determined not to prepare an environmental impact statement.

1 Based upon the environmental assessment, the Comission has concluded that the L

issuance of this amendment will not have a significant effect on the quality of the human environment.

For further details with respect to the action see (1) the application l

for amendment dated January 12,1989,(2) Amendment Nos.89 and 82 to Facility Operating License Nos. DPR-42 and DPR-60, (3) the Comission's related Safety Evaluation and (4) the Comission's Environmental Assessment. All of these items are available for public inspection at the Comission's Public Document Room, the Gelman Building, 2120 L Street NW, Washington, D.C., and at the Technology and Science Department, Minneapolis Public Library, 200 Nicollet Mall, Minneapolis, Minnesota 55401. A copy of items (2), (3), and (4) may be obtained upon request addressed to the U.S. Nuclear Regulatory Comission, Washington, D.C.

20555, Attention: Director, Division of Reactor Projects III, IV, V and Special Projects.

Dated at Rockville, Maryland this August 28, 1989 FOR THE NUCLEAR REGULATORY COMMISSION ac e

m Dominic C. Dilanni Project Manager Project Directorate 111-1 Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation n