Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17264A316 +
- ML061030303 +
- ML060900086 +
- ML20096F215 +
- ML20096D911 +
- ML20096C528 +
- ML20096C064 +
- ML20096B853 +
- ML20096B738 +
- ML20096B724 +
- ML20096B386 +
- ML20096B382 +
- ML20096B374 +
- ML20096B314 +
- U-602537, Forwards Reissued NPDES Permit for Clinton Power Station +
- LIC-95-0245, Forwards Response to Weaknesses Identified During 1995 Emergency Exercise Conducted on 951114 Re NRC Insp Rept 50-285/95-15.Corrective Actions:Util Will Implement Appropriate Revs to EPIP-TSC-8 by 960315 +
- HL-5096, Special Rept 1-95-004:on 951215,emergency Light 1R42-E125 Declared Inoperable for More than 14 Days.Caused by Result of Broken Battery Terminal Discovered During Routine Surveillance Testing.Battery Replaced +
- ML23156A470 +
- ML23156A051 +
- ML20266F222 +
- 05000498/LER-1995-012, :on 950926,RHR Pump Impeller Cracks Occurred. Caused by Improper Mfg of Impeller.Rhr Pump Impeller Replaced +
- 05000528/LER-1995-014, :on 951209,reactor Tripped Following Degradation of Main FW Flow.Caused by Malfunction of FWCS Power supply,NNN-D11,transfer switch.NNN-D11 Aligned to Normal Power Supply +
- 05000220/LER-1994-003-01, :on 940406,missed Tech Spec Surveillance Discovered.Caused by Inadequate Management.Correcting Preventive maint-surveillance Test Database +