Documents That There Were No Instances in 1995 in Which RCS Specific Activity for Either Unit Exceeded TS Limit
ML20096B738
Person / Time
Site: San Onofre  
Issue date: 01/09/1996
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9601160398
Download: ML20096B738 (1)


Text

_

C' f4@

1 South 6m Califomia Edison Company P. O. DOX 128 SAN CLEMENTE. CALIFORNIA 92674-0128 WALTER C. MARSH TELEPHONE

$N. NAGER OF NUCLEAR REGULATORY AFFAIRS (714)368-7501 2

U.

S.

Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

Docket Nos. 50-361 and 50-362 Annual RCS Specific Activity Report - 1995 San'Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification (TS) 6.9.1.5 for Units 2 and 3 requires that SCE submit annually the results of specific activity analyses in which the primary coolant exceeded the limits of Specification 3.4.7.

This letter is provided to document that there were no instances in 1995 in which the RCS specific activity for either unit exceeded the TS limits.

If you require additional information, please let me know.

Sincerely, d[

cc:

L.

J.

Callan, Regional Administrator, NRC Region IV J.

E.

Dyer, Director, Division of Reactor Projects, Region IV K.

E.

Perkins, Jr.,

Director, Walnut Creek Field Office, NRC Region IV T.

P. Gwynn, Director of Reactor Safety, NRC Region IV J. A.

Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M.

B.

Fields, NRC Project Manager, San Onofre Units 2 and 3 a

180118 9601160398 960109 o

PDR ADOCK 05000361 P

pgg

.,