ML20096B374

From kanterella
Jump to navigation Jump to search
Provides Clarification Re Third Ten Yr Interval Insp Plan Relief Request CR-16
ML20096B374
Person / Time
Site: Quad Cities  
Issue date: 01/09/1996
From: Rybak B
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9601160225
Download: ML20096B374 (1)


Text

--

Commonwealth I:dison Company

" ~ l 10 Opus Place Dow ncrs Grove, 11.60515 January 9,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Quad Cities Nuclear Power Station Units 1 and 2 Third Ten Year Interval Inspection Plan: Relief Request CR-16 NRC Docket Nos. 50-2.54 and 50-265

Reference:

(1)

J. Schrage letter to U.S. NRC, dated September 25,1995.

(2)

J. Miller (GE) letter to C. Larson dated September 17,1970 In Reference (1), Comed submitted proposed alternative testing requirements from the requirements of the 1989 Edition of ASME Section XI, subarticle IWA-5250(a)(2) for bolted connections. Relief Request CR 16, provided in that referenced letter, described the alternative testing requirements.

j The purpose of this letter is to provide clarification regarding the referenced relief request. Quad Cities Station utilizes the guidance of GE Services Information Letter (SIL) 483 for performing maintenance on control rod drives (CRD). In addition, Quad Cities utilizes similar guidance regarding CRD flange leakage requirements as described in Reference (2).

To the best of my knowledge and belief, the information contained herein is true and correct. In some respect, this information is not based on my personal knowledge, but on information furnished by other Comed employoes, contractor employees, and/or consultants. Such information has been reviewed in accordance with company practice, and I believe it to be reliable.

If there are any further questions regarding this issue, please contact this office.

Sincerely, M

<d Bob Rybak Nuclear Licensing Administrator cc:

H. J. Miller, Regional Administrator - RIII R. M. Pulsifer, Project Manager NRR C. G. Miller, Senior Resident Inspector - Quad Cities Office of Nuclear Facility Safety IDNS i

u.%eaa.pt 9601160225 960109 PDR ADOCK 05000254 Y

I G

PDR A Unicom Company