MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] |
Text
L, l
i From: <TI M OTH Y_W._G AT E S_a t_- R B 06-LA- E C@ e nte rg y. com > l To: WND2.WNP3(dlw)
Date: i/9/96 2:11pm )
Subject:
WITHOLDING INFORMATION FROM PUBLIC DISCLOSURE j l
Your letter of December 7th indicated that additional l information would be required if RBS desired to maintain an 1 Aero-Data report attached to the Annual Environmental Report as
'priviledged and confidential.' l Upon further review, we have determined that the report may be released to the public in its entirety. l Pls give me a callif you have any questions on this matter, gates ;
(504) 381-4866 CC: ud1.intemet3(" DAVID @entergy.com","N.@entergy.com". .
A e
b 230033
C e
December 7,1995 Mr. J:hn R. McGaha,,Jr.
Vice President - Operations
River Bend Station
- Post Office Box 220 St. Francisville, LA 70775
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (RIVER BEND STATION)
Dear Mr. McGaha,
By letter dated November 21, 1995, Entergy Operations, Inc. submitted the Annual Environmental Operating Report for the period August 29, 1994 to August 28, 1995. The letter included an attached report by the Aero-Data Corporation which is marked PRIVILEGED AND CONFIDENTIAL.
We have reviewed the letter and report with respect to the requirements of 10 CFR 2.790 and have concluded that Entergy or Aero-Data has not provided sufficient justification for us to determine that the information contains proprietary, or confidential commercial or financial information and should be withheld from public disclosure.
Please provide the required justification and withholding request in accordance with 10 CFR 2.790 so that we may consider the proper disposition.
Otherwise, the Annual Report and the attached report from Aero-Data will be released to the public.
Sincerely.
Original Signed By:
David L. Wigginton, Project Manager Project Directorate IV-1 Division of Reactor Projects West Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION Docket File PUBLIC PDIV-1 r/f J. Roe E. Adensan D. Wigginton OGC ACRS J. Dyer, RIV Document Name: REJECT.RB
~
0FC LA:PM n1, PM:Ph4h NAME PNNb DWi!Nton:sw DATE 114T/95 12/ 7 /95 COPY hMNO I
[E)/NO E
\v 0FFICIAL RECORD COPY I GB@@OdB9
\Q
Entergy operations, Inc.
. R+er Bend StaSon 5485 U S H gnwa> 61 g PO B:x 220
- . ., e g E n St Frarcswile LA 73775 Tel 504 336 6225 Fax 504 635 5068 James J. Fisicaro D> rector Nuc ea' Sa'et f November 21,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Environmental Operating Report
Reference:
Docket No. 50-458 File Nos. G9.5, G9.25.1.5 RBF1-95-0283 RBG-42202 1
Enclosed is the Annual Environmental Operating Report (Nonradiological) for the period August l 29,1994 to August 28,1995. This report is submitted in accordance with Subsection 5.4.1 of )
Appendix B (Environmental Protection Plan) to River Bend Station License Number NPF-47. l If there are any questions, please contact Mr. Keith Stoma (504) 381-4784.
Sincerely, 1
e
. /
! j l
JJF/RMM/kn enclosure l
2 7G1.' d a6gd" %
do N,,0 av.
g(,ff k
.v.
{
4 14290264 951121 O V 1 i PDR ADOCK 05000458 '\
R PDR v.
(f5 g I
December 7, 1995 Mr. John R. McGaha, Jr. 1
- Vice President - Operations !
River Bend Station Post Office Box 220 l St. Francisville, LA 70775
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE 1 (RIVER BEND STATION)
Dear Mr. McGaha,
By letter dated November 21, 1995, Entergy Operations, Inc. submitted the Annual Environmental Operating Report for the period August 29, 1994 to August 28, 1995. The letter included an attached report by the Aero-Data i Corporation which is marked PRIVILEGED AND CONFIDENTIAL. l We have reviewed the letter and report with respect to the requirements of 10 CFR 2.790 and have concluded that Entergy or Aero-Data has not provided ;
sufficient justification for us to determine that the information contains i proprietary, or confidential commercial or financial information and should be j withheld from public disclosure.
Please provide the required justification and withholding request in accordance with 10 CFR 2.790 so that we may consider the proper disposition.
Otherwise, the Annual Report and the attached report from Aero-Data will be I released to the public. '
Sincerely, Original Signed By:
David L. Wigginton, Project Manager Project Directorate IV-1 Division of Reactor Projects West Office of Nuclear Reactor Regulation Docket No. 50-458 ;
cc: See next page DISTRIBUTION Docket File PUBLIC PDIV-1 r/f J. Roe E. Adensam D. Wigginton OGC ACRS J. Dyer, RIV Document Name: REJECT.RB
~
0FC LA:P h l. PM:P[4)N NAME PN N d DWithn' ton:sw DATE 12iT/55 12/ 7 /95 COPY hhN0 I
['E)/NO E
0FFICIAL RECORD COPY I
'4 UNITED STATES
[n j
2 NUCLEAR REGULATORY CDMMISSION WASHINGTON. D.C. *a= anat
, , , , , */ December 7, 1995 Mr. John R. McGaha, Jr.
Vice President - Operations Entergy Operations, Inc.
River Bend Station i Post Office Box 220 St. Francisville, LA 70775
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ,
(RIVER BEND STATION) l
Dear Mr. McGaha,
By letter dated November 21, 1995, Entergy Operations, IN . submitted the Annual Environmental Operating Report for the period August 29, 1994 to August 28, 1995. The letter included an attached report by the Aero-Data Corporation which is marked PRIVILEGED AND CONFIDENTIAL.
We have reviewed the letter and report with respect to the requirements of l 10 CFR 2.790 and have concluded that Entergy or Aero-Data has not provided I sufficient justification for us to determine that the information contains proprietary, or confidential commercial or financial information and should be withheld from public disclosure.
l Please provide the required justification and withholding request in accordance with 10 CFR 2.790 so that we may consider the proper disposition. i Otherwise, the Annual Report and the attached report from Aero-Data will be released to the public.
Sincerely, h %
David L ginton, Project Manager Project Directorate IV-1 Division of Reactor Projects West Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page
i Mr. J:hn R. McGaha Entergy Operations, Inc. River Bend Station cc:
Winston & Strawn Mr. Harold W. Keiser ATTN: Mark J. Wetterhahn, Esq. Executive Vice President and 1400 L Street, N.W. Chief Operating Officer
- . Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Mr. J. E. Venable Jackson, MS 39286 Manager - Nuclear Licensing
, Entergy Operations, Inc.
River Bend Station Mr. Michael B. Sellman I
P. O. Box 220 General Manager - Plant Operations St. Francisville, LA 70775 Entergy Operations, Inc. l River Bend Station I i Mr. Layne McKinney, Director Post Office Box 220 l
- Joint Operations Cajun St. Francisville, LA 70775 ,
1 10719 Airline Highway l l P. O. Box 15540 Mr. James J. Fisicaro Baton Rouge, LA 70895 Director - Nuclear Safety i Entergy Operations, Inc.
, Senior Resident inspector River Bend Station a P. O. Box 1051 Post Office Box 220 St. Francisville, LA 70775 St. Francisv111e, LA 70775 President of West Feliciana Police Jury Mr. Jerrold G. Dewease P. O. Box 1921 Vice President - Operations Support St. Francisville, LA 70775 Entergy Operations, Inc.
P. O. Box 31995 Regional Administrator, Region IV Jackson, MS 39286-1995 U.S. Nuclear Regulatory Ceamission 611 Ryan Plaza Drive, Suite 1000 The Honorable Richard P. Ieyoub Arlington, TX 76011 Attorney General State of Louisiana Ms.11. Anne Plettinger P. O. Box 94095 3456 Villa Rose Drive Baton Rouge, LA 70804-9095 Baton Rouge, LA 70806 Wise, Carter, Child & Caraway l Administrator Attn: Robert B. McGehee, Esq.
Louisiana Radiation Protection Division P. O. Box 651 i P. O. Box 82135 Jackson, MS 39205 '
Baton Rouge, LA 70884-2135 Gary F. Hall Vice President & Controller ,
Cajun Electric Power Cooperative '
10719 Airline Highway P.O. Box 15540 Baton Rouge, LA 70895
1 a s .A v A s a A a i qa ,
t ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9511280264 DOC.DATE: 95/11/21 NOTARIZED: NO DOCKET #
FACIL:50-458 River Bend Station, Unit 1, Gulf States Utilities Co. 05000458 AUTH.NAME AUTHOR AFFILIATION FISICARO,J.J. Entergy Operations, Inc. j RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) i
SUBJECT:
Forwards " Annual Environ Operating Rept (Nonradiological) for Period 940829-950828" & proprietary Rept 95-2288.01, "Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA,1994-95." Proprietary rept withheld.
DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR ENCL SIZE: a d/
TITLE: Environmental Monitoring Rept (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES Tn_ennE/NAME LTTR ENCL ID CODE /NAME LTTR ENCL E' O 3 3 PD4-1 PD 1 1 WIGGINTON,D 1 1 INTERNAL: ACRS 1 1 FILE CENTER 01 1 1 NRR/DRPM/PERB 1 1 RGN4 FILE 1 1 EXTERNAL: LITCO AKERS,D 1 Q NRC PDR 1 1 h
F s '
p l
l l
NOTE TO ALL " RIDS" RECIPIENTS:
PLEASE HELP L'S TO REDl'CE WASTE! CONTACT Tile IX)CL'N1ENT CONTROL DESK, ROON1 PI-37 (EXT 5N 2083 )TO ELIN11NATE YOl'R NANIE FRON!
DISTRIlit' TION LISTS FOR DOCl'N1ENTS T Ol' DON'T NEED' TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10
Ent rgy operatiins,Inc.
'%* s',N. . River Bend Station CQ 5485 U S Hig%ap 61
-=== ENTERGY s1 Fen" w m5 Tet 504 336 6225 Fax 504 635 5068 James J. Fisicaro Director Nactear Sa'ety l
l November 21,1995 l
U.S. Nuclear Regulatory Commission Document Control Desk i Washington, D.C. 20555 l l
Subject:
Environmental Operating Report ]
Reference:
Docket No. 50-458 !
File Nos. G9.5, G9.25.1.5 I l
I RBF1-95-0283 RBG-42202 Enclosed is the Annual Environmental Operating Report (Nonradiological) for the period August I 29,1994 to August 28,1995. This report is submitted in accordance with Subsection 5.4.1 of Appendix B (Environmental Protection Plan) to River Bend Station License Number NPF-47.
If there are any questions, please contact Mr. Keith Stoma (504) 381-4784.
Sincerely, l y/) '
/ . y,
/
JJF/RMM/kn enclosure E IO! .' d hMO)aof (fV 0 y e
' fh0L
-.-9511280264 951121 PDR ADOCK 05000455 i
\L i R PDR v
. _ . . _ __ . .. _ - _ _ . . . _ . . . . . . . . . _ _ . _ _ . . . _. _ _ . . . _ . ~ . . .
l l
Environmental Operating Report 50-458 November 21,1995 l RBG-42202 RBF1-95-0283 Page 2 of 2 l
l 1
cc: U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 ,
1 J
NRC Resident Inspector
. P.O. Box 1051 St.Francisville,LA 70775 I
l l
l l
o ,
ENTERGY OPERATIONS,INC.
RIVER BEND STATION ANNUAL ENVIRON' MENTAL OPERATING REPORT (NONRADIOLOGICAL)
August 29,1994 - August 28,1995 -
i i
Prepared by: , Reviewed by:
~
(' .
/l 1 Shi ' f fln J /h / (h{ry;rde
/
[K3toma P. W. Chapman Sr. Environmental Specialist Environmental Coordinator (Acting)
Reviewed By: Approved by:
^
- 3 .
/
\lAQ 3~tu ~ M mA t L V /
/ J. lid lmes I' M. B. Sellman Chemistry General Manager Plant Operations I
i I
-TSrt2902t9951121Iffk PDR- ADOCX 05000458 -
~
1 R PDR
i 4 .
. r RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995
! TABLE OF CONTENTS l
PAGE i
( l.0 INTRODUCTION / OBJECTIVES . ... .. .. ... . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-t l
e 2.0 ENVIRONMENTAL PROTECTION ISSUES . ...... ........... . . . . . . . . . . . . . . . 1 2.1 Aquatic Issues .. ... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.2 Terrestrial issues .. . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 I 2.3 Noise issues . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . . . 2 1
l l 3.0 CONSISTENCY REQUIREMENTS . . .. . . .. . . . . . . 2 i 3.1 Plant Design and Operation ... .. . . . . . . . ..... .. . . . . . . 2 ,
3.2 Reporting Related to NPDES Permit and State Certification ..... . . . ..... . . 4 3.3 Changes Required for Compliance with Other Environmental ;
Regulations . .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.0 ENVIRONMENTAL CONDITIONS .. ... ... . . . . . . . . . . . . . . . . . 5 4.1 Unusual or Important Environmental Events . .. . . . . . . .. . . . . . . . . . . . . . 5 4.2 Environmental Monitoring . . .. .. . . . . . . . . . . . .. . . . . . . . . . . . . . 5 l
4.2.1 Aquatic Monitoring . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . ... 5 4.2.2 Terrestrial Monitoring .. ... . ... . . .. .. . . . . . . . 5 4.2.3 Noise Monitoring . . . .. . . . . . . . . . . . . . . . . . . . .. 5 i
1 l
5.0 ADMINISTRATIVE PROCEDURES .. . . . . . . . . . . . . 6 5.1 Review and Audit . . . . . . . . ... . . . ... . . . . . 6 l
l 5.2 Records Retention . . .. .. . . . . . . . . .. .. 6 i 5.3 Changes in Environmental Protection Plan . . . . . . . . . . . 6
- 5.4 Plant Reporting Requirements . ... . .. . . .. -6 1 1
6 5.4.1 Routine Reports .. ...... . . . . . . ..
5.4.2 Nonroutine Reports . . .... .. . . . ... . . 7 I
i l
l l
l J
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 -
LIST OF TABLES PAGE
' Table 1. Nonroutine Reports to Federal and State Environmental Regulatory Agencies .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Enclosure 1. Photointerpretation Report: .A Brief Aerial ... ...... .... .. . . . . . . . . . . . . . . . 9 Photography Analysis of River Bend Station ii
D RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995
1.0 INTRODUCTION
/ OBJECTIVES The Annual Environmental Operating Report for the period of August 29,1994 (anniversary of license issuance) through August 28, 1995, is submitted in accordance with Subsection 5.4.1 of Appendix B to River Bend Station Facility Operating License Number NPF-47.
River Bend Station (RBS) consists of a 936 MWE General Electric boiling water reactor located on a 3,342 acre site in West Feliciana Parish, Louisiana,4.1 km (2.5 MI) southeast of St. Francisville. i Waste heat from RBS is dissipated via systems using five mechanical draft cooling towers which draw makeup water from the Mississippi River,3.3 (air) km (2.0 MI) to the southwest. Blowdown from the normal cooling tower system is discharged to the Mississippi River through a submerged pipe about 200 meters (660 ft) downstream from the makeup water intake.
Appendix B to the RBS operating license is the Environmental Protection Plan (Nonradiological), l or EPP, which has the following principal objectives: l
- 1. to verify that the facility is operated in an environmentally acceptable manner, as established in the Final Environmental Statement Related to the Operation of River Bend Station (NUREG-1073, commonly referred to as the FES-OL) and other l Nuclear Regulatory Commission (NRC) impact assessments
- 2. to coordinate NRC requirements and maintain consistency with other Federal, State, and local requirements for environmental protection
- 3. to keep the NRC infomied of the environmental effects of facility construction and ;
operation and of actions taken to control these effects.
2.0 ENVIRONMENTAL PROTECTION ISSUES l In the FES-OL dated January 1985, the NRC staff considered the environmental impacts associated with the operation of River Bend Station Unit 1. Certain environmental issues were identified which required study or license conditions to resolve environmental concerns and to assure adequate protection of the environment.
PAGE1
. i l
. I RIVER BEND STATION !
ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 i 2.1 Aauatie issues
{
No specific aquatic issues were identified by the NRC staffin the FES-OL. Environmental concerns which relate to water quality are regulated by way of the facility's National !
Pollutant Discharge Elimination System (NPDES) Permit and Louisiana Water Discharge l Permit.
2.2 ' Terrestrial Issues I
.i Salt drift deposition from the normal cooling towers may cause changes in, or damage to, j nearby vegetation on RBS property (FES-OL Section 5.5.1). A monitoring program to 1 identify the extent of impacts and the mitigative actions necessary, if any, is specified in :
EPP Section 4.2.2.
2.3 Noise issues Operation of the normal cooling towers, the service water cooling tower and main station transformers at RBS may increase noise levels at nearby residences (FES-OL Section 5.12).
A monitoring program to identify the extent of impacts and the mitigative actions necessary, if any, is specified in EPP Section 4.2.3.
3.0 CONSISTENCY REOUIREMENTS 3.1 Plant Design and Oneration in accordance with the EPP, RBS personnel prepare and record an environmental evaluation of any proposed change in plant design or operation or performance of any test or experiment which may significantly affect the environment. Such evaluations are not j performed on activities which do not affect the environment or are required for compliance i
. with non-NRC environmental regulations. The environmental evaluation process is administered through programs goveming design modification and the j development / revision of written procedures. Before engaging in additional construction or i operational activities which may significantly affect the environment, a determination is made and recorded as to whether any proposed change involves an Unreviewed ;
Environmental Question Determination (UEQD). A proposed activity involves a UEQD if it concerns: l a) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; PAGE 2 I
, , - - ~- , , - . , - . - - -
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 b) a signincant change in efRuent or power levels; or c) a matter, not previously reviewed and evaluated in the documents i specified in (a) above, which may have a significant adverse environmental impact.
If the activity meets any of these criteria it must either not be perfomied as proposed or a written evaluation must be prepared and submitted for prior NRC approval.
I During this reporting period two modifications were completed which were evaluated for i their environmental impact under the design modification program referred to above. j In MR 95-0007 a UEQD was made that addressed the following environmental issues surrounding this proposed modification:
- 1. influents and effluents associated with the new Wastewater Treatment Plant (WWTP).
- 2. demolition and disposal of the existing Sewage Treatment Plant (STP).
- 3. new utility system tie-in locations for domestic Water and Circulating Water Blowdown supply lines for the new WWTP. ,
1 Based on the results of the Safety Analysis Environmental Evaluation (SAEE), the potential indirect affects to safety related structures Systems or Components proved, conclusively, j no introduction of any Unreviewed Safety Question (USQ). The UEQD concluded that the EPP will not be affected by the changes made by MR 95-0007. Therefore, based on results of this SAEE, there is no UEQ nor any adverse degradation in the effectiveness of the Environmental Protection Plan (EPP).
In MR 93-0005 an SAEE was performed to evaluate the environmental impact of the installation of seven oil free electric air compressors as a source of station instrument air.
The following environmental issues were reviewed during the evaluation:
- 1. the impact of condensate discharge to the station permitted stoma water outfall 006.
- 2. the possible environmental impact associated with air emissions.
PAGE3
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 The UEQD concluded that there was no significant impact to the environment as a result of the changes made in MR 93-0003. Therefore, based on the results of the SAEE, there is no UEQ or degradation in the effectiveness of the EPP.
The records of these environmental determinations are maintained in the Station Permanent Plant File as part of documentation associated with the modifi.:ation request program i
and/or the procedure development system. ;
1 3.2 Reoorting Related to NPDES Permit and State Certification l
Violations of the NPDES and Louisiana Water Discharge pennits have been reported to the l
NRC via copies of the nonroutine reports sent to the other agencies pursuant to permit i requirements (see Table 1).
On January 27,1992 River Bend submitted to LDEQ a renewal application with ,
modifications for Louisiana Water Discharge Permit No. WP0409. Subsequently, the station has submitted to LDEQ five letters which contain supplemental information and operational change requests. River Bend Station continues to comply with the terms and conditions of the previous penuit, per LDEQ guidance, which was to expire on May 28, 1992.
- 3.3 Changes Reauired for Comoliance with Other Environmental Regulations During the period covered by this report the chanr 3 in plant design or operation and ,
performance of tests or experiments required to achieve compliance with non-NRC l environmental regulations were: j l . four additional emergency diesel generators providing back-up electricity during power failure were added to the station Louisiana Air Emission Permit No. 3160-00009-01, which became effective December 16,1994. l
- 2. station water discharge permit letters of no objection were issued by LDEQ to allow chemical treatments using a non-oxidizing biocide to control zebra mussel infestations in the station make-up water system.
PAGE4
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 i
4.0 ' ENVIRONMENTAL CONDITIONS 4.1 Unusual or Imoortant Environmental Events During the period covered by this report there were no unusual or important events, causally related to RBS operation, which resulted in significant environmental impacts. .
4.2 Environmental Monitoring 4.2.1 Aouatic Monitoring. - Water quality monitoring was performed in accordance with the requirements established in the station's NPDES and Louisiana q Water Discharge permits. Results were documented in monthly Discharge Monitoring Reports and nonroutine reports (Table 1), as required, submitted to the USEPA and LDEQ. l l
4.2.2 Ierrestrial Monitoring. - S6ection 4.2.2 of the EPP requires monitoring by aerial photograph beginning two years prior to cooling tower operation and during the following first and third years of operation. This requirement was completed in 1989 when the " third year" set of stereo color infrared transparencies were monitored. During this reporting period River Bend Station performed terrestrial monitoring with aerial photography, and expanded this monitoring to address a licensing commitment to monitor for and report the existence of new oil and gas wells and pipelines within 2 miles of the plant. No changes in vegetative communities or individual trees, attributable to salt drift impacts, was indicated.
The only loss of vegetative communities observed was associated with the j construction of the new WWTP and the low level radwaste building constructed to the North of the substation and just south of the clarifiers. No changes in the number or size of wellheads, pipelines or transmission line right-of-ways were identified within 2 miles of RBS. The photo interpretation report is provided as Enclosure 1.
4.2.3 Noise Monitoring. - The requirement to conduct an environmental noise monitoring program (EPP Subsection 4.2.3) was completed during 1986/87 and the ;
results were included in the second' Annual Environmental Operating Report. In general, the acoustic environment in the vicinity of RBS proved to be substantially PAGE 5 )
I
. -,...rn- ,m.-.. ,,, - - - _ - . - - - - - - - . m- % ,r
1 l
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 i
more complex than anticipated, but neither the magnitude ofincreases attributable to plant operation nor community reaction exceeded FES-OL predictions.
5.0 ADMINISTRATIVE PROCEDUIiES 5.1 Review and Audit Entergy has provided for independent review and audit of compliance with the EPP. The main group responsible for audits of EPP-related activities, the RBS Quality Assurance Department, reported directly to the Director - Nuclear Safety during the period covered in this report. All findings identified during the reporting period were satisfactorily resolved 1 and did not indicate a significant deterioration on the activities being audited.
]
5.2 Records Retention Records and logs relative to environmental aspects of plant operation and audit activities are retained in the RBS Permanent Plant File. These records and logs are available to the NRC on request. Records of modifications to station structures, systems, and components determined to potentially affect the continued protection of the environment will be retained for the life of the plant. Other records, data, and logs relating to the EPP will be retained for five years or, where applicable, in accordance with the requirements of the USEPA and LDEQ.
5.3 Changes in Environmental Protection Plan l There were no requests for changes to the EPP during the period covered by this report.
5.4 ElantRenorting Reauirements 5.4.1 Routine Renorts. - This Annual Environmental Operating Report was prepared to meet the reporting requirements of EPP Subsection 5.4.1 for the period from August 29,1994, through August 28,1995. Summaries and analyses of the results of monitoring programs, including comparisons with related pre-operational studies, operational controls, and previous reports are presented in Section 4.2 above. During the period of this report there were no indications of significant harmful effects or evidence of trends toward irreversible damage to the environment causally related to the operation of River Bend Station.
PAGE6
s.
RIVER HEND STATION -
ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 5.4.2 Nonroutine Reoorts. - All nonroutine events from August 29,1994, through August 28,1995, that were reportable were identified to other federal, state, or local agencies in accordance witti their reporting requirements in lieu of requirements of EPP Subsection 5.4.2 (see Table 1).
PAGE7
RIVER BEND STATION ENVIRONMENTAL OPERATING REPORT FOR 1994/1995 TABLEI NONROUTINE REPORTS TO FEDERAL AND STATE ENVIRONMENTAL REGULATORY AGENCIES >
DATE TYPE RECIPIENT (S)* DOCUMENT 09-09-94 Letter USCOE RBG-40,867 10-25-94 Letter LDHH RBG-40,983 11-21-94 Letter LDEQ RBG-41,073 11-21-94 Letter USEPA RBG-41,074 12-06-94 Letter USEPA RBG-41,084 12-06-94 Letter LDEQ RBG-41,085 12-07-94 Letter LDHH RBG-41,089 12-21-94 Letter LDEQ RBG-41,135 02-14-95 Letter LDHH RBG-41,199 ,
02-14-95 Letter LDEQ RBG-41,198 02-17-95 Letter LDEQ RBG-41,161 05-16-95 Letter LDEQ RBG-41,527 09-19-95 Letter LDEQ RBG-41,981
DEQ = Louisiana Department of Environmental Quality LDIIH = Louisiana Department of Health and llospitals USCOE = United States Army Corps of Engineers PAGE8 ,