Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P86-1686, Forwards First Part of Reload Analysis Rept,Containing Sections 1-6,9,11 & 12.Remaining Sections Will Be Included in Second Part to Be Submitted on 861001.Rept Submitted in Two Parts to Expedite Review Process,Per Discussion +
- ML18038A228 +
- ML17055C670 +
- ML18038A204 +
- ML17278A995 +
- ML18019B149 +
- ML18019B144 +
- ML18019B143 +
- ML18019B140 +
- ML18019B139 +
- ML18019B130 +
- ML18004A503 +
- ML18092B269 +
- ML18092B268 +
- ML18092B266 +
- ML18092B264 +
- ML18092B263 +
- ML18092B262 +
- ML18092B259 +
- ML18052A788 +
- ML18052A681 +
- ML18052A680 +
- ML18052A679 +
- ML18052A677 +
- ML18052A675 +
- ML20154C452 +
- ML20195K456 +
- ML20203M968 +
- ML20203M957 +
- ML20203M954 +
- ML20203M949 +
- ML20203M865 +
- ML20203M857 +
- ML20203M632 +
- ML20203L939 +
- ML20203L934 +
- ML20206S175 +
- ML20206R910 +
- PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks +
- ML20206R527 +
- PNO-V-86-057, reactor Trip Occurred.Caused by Loose Wire on Shunt Coil Relay That Shorted During Surveillance Testing & Opened Reactor Trip Breaker.New High Density Fuel Racks Removed & Older Low Density Racks Reinstalled +
- ML20206R364 +
- ML20206R343 +
- IR 05000456/1986028 +
- ML20206R188 +
- PNO-V-86-055, on 860828,reactor Trip Occurred Due to Generator/Turbine Trip.Caused by Overexcitation After Small Adjustment to Reactive Load.Vendor Contacted to Investigate Problem.Startup Schedule Pending +
- ML20206Q957 +
- ML20206Q440 +
- ML20206Q257 +
- ML20206Q251 +