ML18052A788
ML18052A788 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 08/29/1986 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
References | |
NUDOCS 8612030109 | |
Download: ML18052A788 (2) | |
Text
..:_ . ...
PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURES INDEX
- ~~ ~"-. PROCEDURE NUMBER PROCEDURE TITLE
~
~ EI-1 ACTIVATION OF THE SITE EMERGENCY PLAN/EMERGENCY CLASSIFICATION'
~ EI-2.1 EMERGENCY ACTIONS/NOTIFICATIONS/RESPONSIBILITIES 13 EI-2.2 EMERGENCY STAFF AUGMENTATION 2
~ EI-3 EI-4.1 COMMUNICATIONS AND NOTIFICATIONS TECHNICAL SUPPORT CENTER 9
5 VJ EI-4.2 OPERATIONAL SUPPORT CENTER ACTIVATION 4 EI-4.3 EMERGENCY OPERATIONS FACILITY A 5 i3 EI-5 EI-6.0 REENTRY trJ:CoVERY OFFSITE OOSE CALCULATION RECOMMENDATIONS FOR 2
5 l PROTEcTIVE, AcTIONS
~
EI-6.l ON FROM STACK GAS MONI'.l:ORS 4 EI-6.2 RELEASE RAT£ DETE 2
~ **RIA-2323 AND ** -2324 FOR STEAM RELEASES THROUGH ATMOSPHERIC D VALVES
\
~
EI-6.3 RELEASE RATE ETERMINATION FROM HIGH RANGE EFFLUENT 3 MONITORS
~*- EI-6.4 EI-6:6 RELEASE/ NTIAL RELEASE DETERMINATION FROM CONTAI NT HIGH RANGE MONITORS 3
3 EI-6.7 SITE METEOROLOGICAL SYSTEM 4 EI-6.8 3 EI-6.9 OFFSITE DOSE CALCULATION - STRAIGHT LINE GAUSSIAN 3 (CALCULATOR METHOD)
EI-6.10 OFFSITE DOSE CALCULATION - STRAIGHT LNE GAUSSIAN 3 (MANUAL METHOD)
EI-6.11 OFFSITE DOSE CALCULATION - SEGMENTED GAUSSIAN 0 DOSE MODEL COMPARISON OF'OFFSITE MONITORING WITH OFFSITE DOSE Canceled CALCULATIONS PROTEcTIVE AcTION RECOMMENDATIONS FOR OFFSITE 3 POPULATION EMERGENCY POST ACCIDENT SAMPLING 3 POST ACCIDENT SAMPLING 5 POST ACCIDENT ANALYSIS 4 HYDROGEN ANALYSIS OF POST ACCIDENT SAMPLES 2 POST ACCIDENT GAS AND LIQUID ACTIVITY ANALYSIS 2 BORON: *MANNITOL TITRATION METHOD POST-ACCIDENT 2 QUANTITATIVE ANALYSIS OF CIIl.ORIDE IN A POST-ACCIDENT 1 soq.JTION 8612030 l 09 860829 i .
INDEX-DMOl 8/29/86 r PDR F
ADOCK 05000255 PDR.
Page 1
e .. - '.-.4a\~
,.! ~..... ,
PALISADES NUCLEAR PLANT
,.(
EMERGENCY IMPLEMENTING PROCEDURES INDEX REVISION PROCEDURE NUMBER PROCEDURE TITLE NUMBER EI-7.8 PH; HYDROGEN SPECIFIC ION ELECTRODE 0 EI-7.10 POST ACCIDENT SAMPLING, RADIOACTIVE GASEOUS EFFLUENT 1 MONITORING EI-8 ONSITE RADIOLOGICAL MONITORING 4 EI-9 OFFSITE RADIOLOGICAL MONITORING 3 EI-10 ACCIDENT ENVIRONMENTAL ASSESSMENT 6 EI-11 DETERMINATION OF EXTENT OF CORE DAMAGE 2 EI-11.2 ESTIMATION OF CORE DAMAGE FROM POST ACCIEENT SAMPLING 1 EI-12 PERSONNEL ACCOUNTABILITY Canceled EI-12.1 PERSONNEL ACCOUNTABILITY 1 EI-12.2 ASSEMBLY AREA PERSONNEL LISTS 0 EI-12.3 SEARCH AND RESCUE TEAM RESPONSIBILITIES 0 EI-13 EVACUATION/REASSEMBLY 3 EI-14 MEDICAL CARE/TREATMENT OF CONTAMINATED, INJURED 2 PERSONNEL EI-15.1 Ei-15.2 EI-15.3 EI-16.1 TRAINING AND DRILLS COMMUNICATION DRILLS POST ACCIDENT .SAMPLE MONITORING SYSTEM OPERATOR TRAINING MAINTENANCE OF EMERGENCY EQUIPMENT 5
1 1
- " 'ie 1
EI.;16.2 POST ACCIDENT SAMPLE MONITORING SYSTEM SUPPLIES AND 2 ASSOCIATED EQUIPMENT CHECKS I
I I
/
INDEX-DMOl 8/29/86 Page 2