G 3 2so August 29, 1986 NRC/THI-86-084 HEMORANDUit FOR:

Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. Miraglia, Director Division of PWR Liccnsing-B FR0ft:

Willian D. Travers, Director Ti!I-2 Cleanup Project Directorate

SUBJECT:

HRC TitI-2 CLEADUP PROJECT DIRECTORATE WEEKLY STATUS REPORT FOR AUGUST 25 - 29, 1986' 1.

DEFUELING Bulk defueling operation continues using heavy duty hydraulic chisel and small spade bucket tools.

Four fuel canisters have been filled to date since operations began August 12, 1986.

A 60,000 gallon feed and bleed was performed on the RCS to improve water clarity.

2..

PLANT STATUS The reactor remains in long term cold shutdown, vented to the atmosphere. Core cooling is by natural heat loss to ambient building atmosphere. The average incore thermocouple reading is 80*F.

The airborne radioactivity on the defueling platform above the

. reactor vessel is about 4.5 E-7 uC1/cc Tritium and 5.6 E-12 uCi/cc particulates, predominately Cesium-137 and Strontiun-90. About-15 feet of water over the core region and 6 feet over the carousel ~

holding the defueling canisters provide shiciding.

3.

ENVIRONMENTAL PONITORING US Environmental Protection Agency (EPA) sample analysis results show that TMI site liquid effluents are in accordance with regulatory limits, NRC requirements, and The City of Lancaster

{

Agreement.

8609050453 860829

?

DR ADOCK 05000320 t

PDR SUW90KM2%

.,...l

~'*

[ we ronu us no somacu ono OFFICIAL RECORD COPY

p t

p.

Harold R. Denton 2

August 29, 1986 Frank J.- itiraglia flRC/Till-86-084

~

The Lancaster water sanple taken at the water works river intake and analyzed by EPA consisted of a seven day ccaposite sanple taken August 10 - 16, 1986. A gama scan detected no reactor related activity.

TIII water samples taken by EPA at the plant discharge (includes Units 1 and 2) to the river consisted of seven daily cenposite N

samples taken from August 9 - 15, 1986. A gama scan detected no reactor related activity.

The EPA analysis of the liRC outdoor air sample for the period. August 21 - 29, 1986 will be reported in the next report.

4.

AUXILIARY AllD FUEL HAf!DLIliG BUILDIfiG ACTIVITIES liands-on decontanination of fleutralizer Tank Punp roon and Reactor Coolant Evaporator room continues.

Kelly vacuuning decontanination on "A" Bleed Tank room continues.

5.

fiRC EVALUATI0fiS Ifl PROGRESS Technical Specification Change Request nunbers 49, 51, 52, and 54.

Recovery Operations Plan Change numbers 31, 33, and 39.

Solid Uaste Facility Technical Evaluation Report.

Reactor Building Sunp Criticality Safety Evaluation Report.

licavy Load Safety Evaluation Report, Revision 3.

Disposal of Processed Water Report.

Sedinent Transfer and Processing Systen SER End Fitting Storage SER

/

SER for Use of Plasna Arc Cutting Torch 6.

PUBLIC fiEETIllG The next necting of the Advisory Panel is scheduled.for October 8,1986 fron 7:00 Pil to 10:00 Fil at a location to be detenained.

Persons desiring to speak before the Advisory Panel are requested to contact Mr. Thunas Smithgall at 717-291-1042, _ or write him at 2122 14arietta Avenue, Lancaster, PA 17603.

ORIGigAt SIGNED BY:

ylliam D. Travers Willian D. Travers Director c

Tf11-2 Cleanup Project Directorate

~ '"c5>.T.

D......TMICPD[./U.

.D.

..TfdIC

..CCowgi15... Kck ch..T.S. -

MbW Om>

a..

c rs

^">.8/21/86..... 8/>C/86.....8/21/86...... 8 186.....

1 NRC FORM 318 0080) NRCM C24 OFFICIR RECORD COPY

i i

Ifarold R. Denton 3

August 29, 1936 Frank J. Iliraglia fiRC/Till-86-004 Ir4TERiiAL DISTRIilUTION

~CE!iTiETID.

lif;C PDli LOCAL PDR EDO CGC EPA DGE RI Regional Administrator 1(I Division Directors Public Affairs, RI Stcte Liaison, LI TiiI !!Q r/t' Till SITE r/f Till-2 Project Section File Till-1 Resident Office (S)

TliI Cleanup Project Directorate (14)

OF F ICE )

WRNME k DATE)