Provides Update of Util Progress Re Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. New Q-list Project Scheduled for Completion in Dec 1987
ML20203M957
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/29/1986
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Bernero R
Office of Nuclear Reactor Regulation
References
GL-83-28, NUDOCS 8609050209
Download: ML20203M957 (2)


Text

,

t

'N PHILADELPHIA ELECTRIC COMPANY 23o1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.191o1 SHIELDS L. D ALTROFF

~

  • ~

August 29, 1986 Docket Nos. 50-277 50-278 Mr. Robert Bernero, Director Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 & 3 Generic Letter 83-28

REFERENCES:

1) Letter, S. L. Daltroff, PECo, to D. G. Eisenhut, NRC, dated April 23, 1984
2) Lettar, C. L. Dalttoft, PECo, to J.

F. Stole, NRC, dared May 29, 1985

3) Letter, S. L. Daltroff, PECo, to R.

Bernero, NRC, dated March 14, 1986 x

4) Letter, S. L. Daltroff, PECo, to R. Bernero, NRC, dated July 23, 1986

Dear Mr. Isarnero:

This letter provides an update of Philadelphia Electric Company's progress regarding Generic Letter 83-26, " Required Actions Based on Generic Implications of Salem ATWS Events," for Peach Bottom Atomic Power Station.

In the reference 4 letter we stated that we would update you on the status of the new Q-list project by August 29, 1986.

The project now is scheduled to be completed in December 1987.

This is a change in the expected completion date of April 1987 provided to the NRC in the Reference 3 letter.

This revised completion date reflects a clearer understanding of the level of e609000209 860029 f,0 q0 PDR ADOCK 0000 7

P

h Mr. Robert Barnsro August 29, 1986 Page 2 effort required to complete the project, and the impact of that effort on other engineering activities necessary to support three nuclear unit outages in 1987.

We do not consider the delay in the Q-list project to be related to our conformance with Generic Letter 83-28.

As stated in previous correspondences, Philadlephia Electric Company has

' satisfied the requirements of Generic Letter 83-28, Position 2.1.

The enhancement of the Q-list goes beyond the requirements of Generic Letter 83-28.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours,

)

/

_f

,/,L nr, fe..j

,m -

r cc:

Madan Dev, NRC Reactor Engineer T. P. Johnson, Resident Site Inspector s

{