ML20206R188
| ML20206R188 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 08/29/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20206R194 | List: |
| References | |
| NUDOCS 8609050365 | |
| Download: ML20206R188 (2) | |
See also: IR 05000456/1986028
Text
i
.
p ng!
UNITED STATES
k,
' NUCLEAR REGULATORY COMMisslON
f
$
REGION lil
O
f
799 ROOSEVELT ROAD
o
aten ettyn,ittinois sais:
AUG 291986
Docket No. 50-456
Docket No. 50-457
Comonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Messrs.
J. M. Jacobson, J. A. Gavula, and J. F. Schapker of this office on June 4-5,
10, 19, 24, July 10, 17, 22, 31, and August 12, 14, 1986, of activities at
Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with
Mr. E. E. Fitzpatrick at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records,' observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
S- t ; * cM E !;
' f 7 J.'J.' I' rrifci
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No.50-456/86028(DRS);and
No. 50-457/86022(DRS)
See Attached Distribution
VlJ
j
f
a-
/na
a
er
3g
Weil',j'
f
R II
RIII
Hab
oli
G
%
f/M?
8609050365 860329
DR
ADOCK 0500
6
{
.
.
Commonwealth Edison Company
2
AUG 291986
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
,
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB