ML20203M954

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Primary Containment Isolation Valve Testing Conditions
ML20203M954
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/29/1986
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20203M950 List:
References
NUDOCS 8609050206
Download: ML20203M954 (4)


Text

_ _____ _ _ _ _ _ _ _ _ _ _ _ _ .

BSEP-1-88 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.3.1 Each primary cc.ntainment isolation valve specified in Table 3.6.3-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control, or power circuit by performance of the cycling test and ve.*ification of isolation time.

4.6.3.2 Each isolation valve specified in Table 3.6.3-1 shall be demonstrated OPERABLE at least once per 18 months by verifying that on a containment isolation test signal each isolation valve actuates to its isolation position.

4.6.3.3 The isolation time of each power-operated or automatic valve specified in Table 3.6.3-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.

4.6.3.4 Each reactor instrumentation system isolation valve shall be demonstrated OPERABLE at least once per 18 months by cycling each valve through at least one complete cycle of full travel.

8609050206 860829 PDR ADOCK 05000324 P PDR BRUNSWICK - UNIT 1 3/4 6-13 Amendment No.

6

7 ..

1 .

4 ATTACHMENT 2 BRUNSWICK-2 PROPOSED TS PAGE 86TSB09 (4056 MAT)

.l * *

. I

SUMMARY

LIST OF REVISIONS i-PAGE NO. REVISION i

J 3/4 6-13 Removed the words "During Cold Shutdown or Refueling" from Surveillance Requirement 4.6.3.2 1

4 1

i i

i

}

i.

4 4

1 f

l (4056 MAT) r

., ,, , .-,_-._-e__.... - ~ . - -,%...r,~_,.,+.,m_.....,-_.,,-__-...,,,,~_,,#,.-_. _ _ , , _ . , , . - . . , , .- .,,,,m-_. . . , - -

BSEP-2-91 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.3.1 Each primary containment isolation valve specified in Table 3.6.3-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control, or power circuit by performance of the cycling test and verification of isolation time.

4.6.3.2 Each isolation valve specified in Table 3.6.3-1 shall be demonstrated OPERABLE at least once per 18 months by verifying that on a containment isolation test signal each isolation valve actuates to its isolation position.

4.6.3.3 The isolation time of each power-operated or automatic valve specified in Table 3.6.3-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.

4.6.3.4 Each reactor instrumentation system isolation valve shall be demonstrated OPERABLE at least once per 18 months by cycling each valve through at least one complete cycle of full travel.

s BRUNSWICK - UNIT 2 3/4 6-13 Amendment No.

- -- __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ __- )