Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215N181 + (October 24, 1986)
- ML20215N321 + (October 24, 1986)
- ML20214A181 + (October 24, 1986)
- 05000254/LER-1986-028-03, :on 861003,RCIC Turbine Trip Throttle Valve Tripped Closed & RCIC Declared Inoperable.Cause Undetermined.Valve Reset Manually + (October 24, 1986)
- 05000382/LER-1986-021, :on 860924,hourly Firewatch Tour Not Performed in Shutdown Cooling HX Room B.Caused by Personnel Error.Post Order for Firewatch Patrol Revised + (October 24, 1986)
- 05000327/LER-1986-044, :on 860925,determined That Surveillance Instructions Did Not Adequately Verify ECCS Flow.Caused by Procedural Inadequacy.Procedure Changed to Ensure Injection Flow Path + (October 24, 1986)
- ML20215M022 + (October 24, 1986)
- ML20215M477 + (October 24, 1986)
- ML20215N315 + (October 24, 1986)
- ML20215N240 + (October 24, 1986)
- 05000528/LER-1986-014, :on 860411,two Actuations of Fuel Bldg Essential Ventilation Sys Occurred.Cause Undetermined.Low Range Monitor RU-145 Declared Inoperable.Action Statement & Sampling Requirements Initiated + (October 24, 1986)
- 05000413/LER-1985-042, :on 850616,during Mode 1,nuclear Instrumentation High Flux Rate Power Range Reactor Trip Occurred.Cause Undetermined.Power Range Channels Reset. Equipment Realigned + (October 24, 1986)
- 05000260/LER-1986-013-02, :on 860927,unplanned ESF Actuations Occurred Due to Failed Relay in Refueling Zone Vent Exhaust Radiation Trip Logic.Caused by Burned Coil in GE Model CR120A Relay. Relay Replaced + (October 24, 1986)
- 05000528/LER-1986-051, :on 860930,determined That 50,000 Gallons of Effluent Chemical Waste Discharged to Evaporative Ponds W/O Sampling Since 860927.Caused by Cognitive Personnel Error. Procedure Revised Re Valve Identification + (October 24, 1986)
- ML20197B474 + (October 24, 1986)
- L-86-420, Forwards Load Summary Sheets for Supports Subj to PORV Discharge Loads Corresponding to EPRI Load Combinations,Per 860626 Response to NRC 850714 Request for Addl Info Re NUREG-0737,Item II.D.1 + (October 24, 1986)
- 05000315/LER-1986-021-01, :on 860925,during Surveillance Testing, Determined That RHR May Have Been in Unanalyzed Configuration for LOCA Found in Fsar.Caused by Lack of Specificity in Tech Specs + (October 24, 1986)
- ML18031A928 + (October 24, 1986)
- ML18022A452 + (October 24, 1986)
- ML15244A176 + (October 24, 1986)
- ML17083B813 + (October 24, 1986)
- ML20149C194 + (October 24, 1986)
- ML20005H163 + (October 24, 1986)
- L-86-439, Confirms Understanding from 861021 Telcon That NRC Concurs W/Date & Schedule Change Provided in .Rev to Security Plan Encl,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR2.790 & 73.21) + (October 24, 1986)
- ST-HL-AE-1789, Requests That Scope of Fog Monitoring Program Be Reviewed as Soon as Possible to Support Program Initiation in Dec 1986. Fog Monitoring Will Be Accomplished by Operation of Two Fog Visiometers,Per Fes (NUREG-1171) Section 5.13.3 + (October 24, 1986)
- 05000528/LER-1985-005-01, Corrected LER 85-005-01:on 860210,automatic Actuation of Control Room Essential Filtration Actuation Signal Occurred. Caused by Spurious Auxiliary Equipment Failure Alarm.Safety Evaluation Performed + (October 24, 1986)
- IR 05000219/1986012 + (October 24, 1986)
- IR 05000289/1985097 + (October 24, 1986)
- ML18004B562 + (October 25, 1986)
- ML20211G596 + (October 25, 1986)
- 05000368/LER-1986-011, :on 860924,reactor Tripped Form 100% Power on High Reactor Coolant Sys Pressure Following Main Turbine Trip.Incorrectly Assembled Valve Believed to Be Contributing Factor.Valve Reassembled Properly + (October 25, 1986)
- ML20215N084 + (October 25, 1986)
- ML20212M943 + (October 25, 1986)
- ML20196D889 + (October 25, 1986)
- ML20214V774 + (October 26, 1986)
- ML20214V523 + (October 26, 1986)
- ML20210S598 + (October 26, 1986)
- ML20209H131 + (October 26, 1986)
- ML20214J950 + (October 26, 1986)
- ML20215N126 + (October 26, 1986)
- ML18031A919 + (October 26, 1986)
- ML16341D943 + (October 26, 1986)
- ML16342B241 + (October 26, 1986)
- ML16341D937 + (October 26, 1986)
- ML17251A828 + (October 27, 1986)
- ML17251A827 + (October 27, 1986)
- ML18005A336 + (March 20, 1986)
- ML18005A353 + (October 27, 1986)
- ML18004B571 + (October 27, 1986)
- ML18004B558 + (October 27, 1986)
- ML18004B543 + (October 27, 1986)
- ML072850061 + (October 27, 1986)
- ML20150D976 + (October 27, 1986)
- ML20197C320 + (October 27, 1986)
- PNO-III-86-120, on 860918,radwaste Discovered in Five Unlabeled Barrels in Storage Bldg.One Worker Had Minor Spot of Am-241 Contamination Which Was Successfully Decontaminated + (October 27, 1986)
- ML20197B895 + (October 27, 1986)