Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SNRC-1900, Suppl to 920113 Application for Amend to License NPF-82, Authorizing Long Island Power Authority to Implement Decommissioning Plan.Suppl Consists of Revised NSHC Analysis + (January 24, 1992)
- ML20127C215 + (January 24, 1992)
- 05000265/LER-1992-001-01, :on 920101,main Turbine Manually Tripped.Group I Primary Containment Isolation & Reactor Scram Occurred. Caused by Pressure Wave in Msl.Isolation Trip Logic Will Be Revised During Next Outage + (January 24, 1992)
- 05000368/LER-1991-018-01, :on 911230,service Water Loop Inoperable Resulting in Entry Into TS 3.0.3.Cause Has Not Been Determined.Valve Replaced in Shut Position Under Operations Administrative Controls + (January 24, 1992)
- LD-92-007, Forwards Response to Matls & Chemical Engineering Branch 910808,Structural & Geosciences Branch 910926 & Plant Sys Branch 911010 Requests for Addl Info Re SSAR - Design Certification + (January 24, 1992)
- 05000301/LER-1991-001-02, :on 910929,main Steam Isolation Valve Failed to Close.Caused by Degradation of Valve Operators.Investigation Was Performed to Assess MSIV Performance & Perceptions of Valve Performance + (January 24, 1992)
- 05000445/LER-1991-032, :on 911206,incomplete Calibr of Four Channels & Nonconserative Indication of Reactor Power Noted.Caused by Error in Wording of Work Order Instructions.Steps Have Been Revised in Surveillance Database + (January 24, 1992)
- ML20091Q399 + (January 24, 1992)
- ML20091Q407 + (January 24, 1992)
- ML20044B487 + (January 24, 1992)
- IR 05000280/1991035 + (January 24, 1992)
- ML18096A509 + (January 24, 1992)
- ML18010A524 + (January 24, 1992)
- 05000529/LER-1991-004, :on 910816,reactor Trip Occurred Due to High Pressurizer Pressure.Caused by Generator/Turbine Trip in Combination W/Coginitive Personnel Error.Generrex Ac/Dc Gate Board Was Replaced + (January 24, 1992)
- GO2-92-020, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-36 on 911007-11 & 29.Corrective Actions:New Geiger-Mueller Tube Type Survey Equipment Purchased & Plant Radiation Protection Procedures Revised + (January 24, 1992)
- ML18010A525 + (January 24, 1992)
- IR 05000275/1991039 + (January 24, 1992)
- IR 05000269/1991037 + (January 24, 1992)
- ML16341G436 + (January 24, 1992)
- ML18152A531 + (January 24, 1992)
- ML17329A368 + (January 24, 1992)
- ML17056B634 + (January 24, 1992)
- ML18010A523 + (January 24, 1992)
- ML17289A298 + (January 24, 1992)
- ML18010A521 + (January 24, 1992)
- TXX-9203, Interim Deficiency Rept CP-92-03 Re Potential Loss of RHR Due to Flooding of Pump Room.Initially Reported on 911126. Caused by Walkdown Sheet Failing to Address HVAC Vent. Reportability Evaluation Expected by 920227 + (January 24, 1992)
- ML20091P220 + (January 25, 1992)
- ML20217F456 + (January 25, 1992)
- Press Release-92-014, Informing That NRC Received Enclosed letter-type Report on Proposal to Decouple Nonseismic Siting Requirements from Plant Requirements + (January 27, 1992)
- ML17348B355 + (January 10, 1992)
- ML18096A493 + (January 27, 1992)
- ML18096A492 + (January 27, 1992)
- ML18058A146 + (January 27, 1992)
- ML18058A135 + (January 27, 1992)
- ML20062L276 + (January 27, 1992)
- ML20100P958 + (January 27, 1992)
- ML20100P954 + (January 27, 1992)
- ML20092F201 + (January 27, 1992)
- ML20092B973 + (January 27, 1992)
- ML20092A737 + (January 27, 1992)
- ML20091Q818 + (January 27, 1992)
- ML20091Q586 + (January 27, 1992)
- ML20091Q466 + (January 27, 1992)
- ML20091Q312 + (January 27, 1992)
- ML20091Q289 + (January 27, 1992)
- ML20091P909 + (January 27, 1992)
- ML20091P882 + (January 27, 1992)
- ML20091P781 + (January 27, 1992)
- ML20091P792 + (January 27, 1992)
- ML20091P445 + (January 27, 1992)
- ML20091P113 + (January 27, 1992)
- ML20091P104 + (January 27, 1992)