ENCLOSURE 1

NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Unit 1

Docket No. 50-400 License No.

NPF-63 During an NRC inspection conducted on Decembeber 21 1991 - January 17,

1992, violations of NRC requirements were identified.

In accordance wi e

"General Statement of Policy and Procedure for NRC Enforcement Actions, Part 2, Appendix C (1991), the violations are listed below:

A.

Technical Specification 6.8. 1.a requires tha p

that written procedures, be established and implemented

'covering procedures outlined in Appen ix o

Regulatory Guide 1;33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, paragraph 5 requires procedures for responding to alarmed conditions.

Alarm response procedure ARP-ALB-013, Main Control

Board, section ALB-013-5-4, directs the operator to try and reset the power range lower detector ig u

t h'

flux deviation or auto defeat alarm by momentarily placing the comparator channel lower section switch to the pp p

a ro riate osition and then return it to the normal position.

C t to the above, on January 13,

1992, the comparator channel lower section switch was not returned to the norma p

on rary o

e attempt to reset the alarm but was instead found to be positione sn e

N-42 defeat position.

This is a Severity Level IV violation (Supplement I).

B.

Technical peci ica ion S

'f' 6.5.4. 1 requires that audits of unit activities These audits shall be performed by the Nuclear Assessment Department.

es shall encompass:

The results of actions taken to correct deficiencies occurring in unit equipment, structures,

systems, or method of operation that affect nuclear safety, at least once per six months.

e con r

Th fo mance of unit operation to provisions contained within the technical specifications and applicable license conditi once per 12 months.

The training, qualifications, and performance as a group, of the entire unit staff, at least once per 12 months.

The emergency plan and implementing procedures, at least once per 12 months.

Contrary to the above, as o

anuar of January 15 1992 audits of unit activities were not performed in that:

9202140i08 920124 PDR ADOCK 05000400

2 Docket No. 50-400 Carolina Power and Light Company License No. NPF-63 Shearon Harris Unit 1

1.

An audit was not performed at least once per six m

x months to evaluate the results of actions taken to correct deficiencies.

2.

An audit was not performed at least once per 12 months to evaluate the conformance of unit operation to provisions containe wi in technical specifications and applicable license conditions.

3.

An audit was not performed at least once per 12 months to evaluate the training, qualifications, and performance as a group, o

e entire unit staff.

An audit was not performed at least once pe r 12 months to evaluate the emergency plan and implementing procedures.

This is a Severity Level IV violation (Supplement I).

'ons of 10 CFR 2.201, Carolina Power and Light Company is e ent or ex lanation to the U

S h reby required to submit a written statement or exp an e

TN:

Document Control

Desk, as ing on, II d f l

bl 20555 with a copy to the Regional Administrator, Region an i

a copy to the NRC Resident Inspector, wi y

transmitting this Notice of V~olation (Notice) m r p y o

Not II violation:

(1) the reason for the violation, or, i con es e, disputing the violation, (2) the correct p

results'chieved, (3) the corrective steps that will be ta en o avoi iolations, and (4) the date when f adequate reply is not received within t e time speci ie in is be issued to show cause why the license shou d

no e

mo i order may e iss such other action as may be proper should not be ll b t

t d

th taken.

Where good cause is shown, consideration wi e gi e

response time.

FOR THE NUCLEAR REGULATORY CONNISSION Dated at Atlanta, Georgia this 24 day of January 1992 Reactor Projects Branch 1

Division of Reactor Projects