ML17289A298

From kanterella
Jump to navigation Jump to search
Forwards Proprietary risk-based Guidance for Electrical Distribution Sys at Plant.Encl Withheld
ML17289A298
Person / Time
Site: Columbia 
Issue date: 01/24/1992
From: Beckner W
Office of Nuclear Reactor Regulation
To: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17289A299 List:
References
NUDOCS 9202060492
Download: ML17289A298 (6)


Text

I Docket No. 50-397 january 24, 1

MEMORANDUM FOR:

Roy Zimmerman, Director Division of Reactor Safety and Projects Region V

FROM:

SUBJECT:

William D. Beckner, Chief Risk Applications Branch Division of, Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation WNP-2 PRA INSIGHTS FOR ELECTRICAL SYSTEM CQ C<)

We are providing you with the enclosed WNP-2 PRA insights for an EDSFI.

The inspection events were selected on the basis of generic PRA insights.

We welcome any comments from you and are looking forward to interacting with you and your team members in order to enhance the inspection process.

Also, we would like to remind you that the inspection elements enclosed contain proprietary information and are expected to be treated accordingly.

If you have any questions, please contact Dr. Chung (504-1071).

Original signed by:

William D. Beckner, Chief Risk Applications Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation

Enclosures:

As stated DISTRIBUTION WRussel 1, 12G18

FCongel, 10E2
EButcher, 10E2
WBeckner, 10E4
EImbro, 9A1 DCorporandy, RV SRichards, RV-
JDyer, 11D23
PEng, 13E16 KCampe OChung Docket Files RAB r/f mOaOeO+9~9aO'S:M RAB Chron PDR ADOCK 050003'V7 8

PDR OFC NAME

RAB:DREP:NRR
JChung:

DATE:01/

2

SC RAB:DREP
BC:RAB:DREP I,

~ wW P

WBeckner

~

~

01/'l492
01/~

92 OFFICIAL RECORD COPY Document Name:

PRA TEAM INSP

0

~'

Docket No. 50-397 January 24, 15 MEMORANDUM FOR:

Roy Zimmerman, Director Division of Reactor Safety and Projects Region V

FROM:

SUBJECT:

William D. Beckner, Chief Risk Applications Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation WNP-2 PRA INSIGHTS FOR ELECTRICAL SYSTEM We are providing you with the enclosed WNP-2 PRA insights for an EDSFI.

The inspection events were selected on the basis of generic PRA insights.

We welcome any comments from you and are looking forward to interacting with you and your team members in order to enhance the inspection process.

Also, we would like to remind you that the inspection elements enclosed contain proprietary information and are expected to be treated accordingly.

If you have any questions, please contact Dr. Chung (504-1071).

Original signed by:

William D. Beckner, Chief Risk Applications Branch Division of Radiation Protection

(

and Emergency Preparedness Office of Nuclear Reactor Regulation

Enclosures:

As stated CQ CD CDp CM~

CD DISTRIBUTION

WRussell, 12G18
FCongel, 10E2
EButcher, 10E2
WBeckner, 10E4
EImbro, 9A1 DCorporandy, RV SRichards, RV
JDyer, 11D23
PEng, 13E16 KCampe JChung Docket Files, RAB r/f

'202060492 920124 RAB Chron PDR ADocK 05000397 8

PDR QPP l OFC

RAB:DREP:NRR NAME
JChung:

DATE:01/

2

SC RAB:DREP P
01/'2492
BC:RAB:DREP

~

MD~

~

i/I/+~

WBeckner
01/

92 OFFICIAL RECORD COPY Document Name:

PRA TEAM INSP

(

II V

'l P[

F 4

b II II IV t

H h

f

r'anuary 24, 1

t Occket'No.

50-397 MEMORANDUM FOR:

Roy Zimmerman, Director Division of Reactor Safety and Projects Region V

FROM:

SUBJECT:

William D. Beckner, Chief Risk Applications Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation WNP-2 PRA INSIGHTS FOR ELECTRICAL SYSTEM We are providing you with the enclosed WNP-2 PRA insights for an EDSFI.

The inspection events were selected on the basis of generic PRA insights.

We welcome any comments from you and are looking forward to interacting with you and your team members in order to enhance the inspection process.

Also, we would like to remind you that the inspection elements enclosed contain proprietary information and are expected to be treated accordingly.

If you have any questions, please contact Dr. Chung (504-1071).

Original signed by:

William D. Beckner, Chief Risk Applications Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation

Enclosures:

As stated DISTRIBUTION WRussel 1, 12G18

FCongel, 10E2
EButcher, 10E2
WBeckner, 10E4
EImbro, 9A1 DCorporandy, RV SRichards, RY JDyer, llD23
PEng, 13E16 KCampe JChung Docket Files RAB r/f RAB Chron OFC
RAB:DREP:NRR NAME
JChung:

W DATE:01/

2

SC RAB:DREP
BC:RAB:DREP I i s.>/~

P

WBeckner
01/'l92
01/~

92 OFFICIAL RECORD COPY Document Name:

PRA TEAN INSP

~ ~