ML20091Q312
| ML20091Q312 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/27/1992 |
| From: | Joshua Wilson TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9202040313 | |
| Download: ML20091Q312 (3) | |
Text
.
- g.
t A
n e w, u m r~,,
Jrh t. mwn va9Fn iem,
,r January 27, 1992
-U.S. Nuclear Regulatory Commission ATTNr Document Control Desk Washington, D.C. 20555 Gentlement In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
sEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 - NRC INSPECTION REPORT 3
NOS.-50-327/90-18 AND 50-328/90-18
Reference:
TVA letter to NRC dated July 27 1990 In the referenced letter, TVA committed to provide a schedule for the necessary Unit 1 modifications on pre-NF (not manufactured to the
~
- requirements of subsectios. NF of the American Society of Mechanf ;al Engineeru-[ASME] code) mechanical snubbers' after restart from the Cycle 5 l '
reft.eling outage.- SQN has-now performed the required walkdowns and has
. identified the pre-NE mechanical snubbers. Based upon these walkdowns, TVA will' implement the necessary modifications or replacements of pre-NF mechanical enubbers before restart from the Unit 1 Cycle 6 refueling outage. This will provide a maximum faulted load capacity factor of 1.33 for the Unit,1-pre-NF mechat.ical snubbers. As committed to in the above referenec, the necessary modifications for Unit 2 will be completed.
before restart from its cycle 5 refueling outage.
p
.The commitment contained in this submittal is provided in the enclosure.
Please direct questions concerning this issue to W. C.-Ludwig at l-(615) 843-7460.
V p
Sincerely, h
k M
C~)
'J L. Wilson C3 f
'd Enclosure L
cc: -See page 2 9202040313 920127
,e' 5 i l
PDR-ADOCK 05000327 G.
\\
-.. -... ~. -. -,.. ~..-.
l
- Sc s
, pr 1U.S'. Nuclear Regulatory Commission Page 2 i
January 27,11992-cc (Enclosure):
Mr. D. C. LaBarge,' Project Manager U.S. Nuclear Regulatory Commission
- One White Flint, North.
1155$ Rockv111e Pike Rockville, Maryland 20852 NRC Resident Inspector
- bequoyah Nuclear Plant 2600 Igou Ferry Road
- Soddy Daisy,-Tennessee 37379
~
. Mr. B. A. Wilson, Project Chief U.S.-Nuclear Regulatory Commission Region II 101 Marietta Street
_W. Suite 2900 Atlanta, Georgia 30323 i
.m I
i, i --
l 5
ll
- t',
li' l
[
r
- i I,,
g 9
y
,y 9
e
,p i, = ++n r-.
T
. ~.. - - _. - ~.... - - -.. -.. -. ~.
- ~ - -.. -. _ _.-.
. - ~ _. - -
o
+
F.NC1.0GURE E
i Commitment for-NRC Inspection Report Nos.
5_' 327/90-18 and 50-328/90-18 h quoyah Nuclear Plant will implement the necessary Unit 1 modifications or replacements of pre-NF (not manufactured to the requirements of subsect!on NF-l.
of the American Society of Matchanical Engineers code) mechanical-anubbers before-restart from its Cyc16 6 refueling outage.
D e
L
}
I i
I 9
a R
.)
r 4
4 A
8
,_,.m.
-..4<.,
_f.-..,
e,._,,
.s,,
,ww
.. ~.
-,-,y
.,35.
g3,,
,