Responds to NRC Re Violations Noted in Insp Repts 50-327/90-18 & 50-328/90-18.Corrective Actions:Mods or Replacements of pre-NF Mechanical Snubbers Implemented
ML20091Q312
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/27/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202040313
Download: ML20091Q312 (3)


Text

.

g.

t A

n e w, u m r~,,

Jrh t. mwn va9Fn iem,

,r January 27, 1992

-U.S. Nuclear Regulatory Commission ATTNr Document Control Desk Washington, D.C. 20555 Gentlement In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

sEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 - NRC INSPECTION REPORT 3

NOS.-50-327/90-18 AND 50-328/90-18

Reference:

TVA letter to NRC dated July 27 1990 In the referenced letter, TVA committed to provide a schedule for the necessary Unit 1 modifications on pre-NF (not manufactured to the

~

- requirements of subsectios. NF of the American Society of Mechanf ;al Engineeru-[ASME] code) mechanical snubbers' after restart from the Cycle 5 l '

reft.eling outage.- SQN has-now performed the required walkdowns and has

. identified the pre-NE mechanical snubbers. Based upon these walkdowns, TVA will' implement the necessary modifications or replacements of pre-NF mechanical enubbers before restart from the Unit 1 Cycle 6 refueling outage. This will provide a maximum faulted load capacity factor of 1.33 for the Unit,1-pre-NF mechat.ical snubbers. As committed to in the above referenec, the necessary modifications for Unit 2 will be completed.

before restart from its cycle 5 refueling outage.

p

.The commitment contained in this submittal is provided in the enclosure.

Please direct questions concerning this issue to W. C.-Ludwig at l-(615) 843-7460.

V p

Sincerely, h

k M

C~)

'J L. Wilson C3 f

'd Enclosure L

cc: -See page 2 9202040313 920127

,e' 5 i l

PDR-ADOCK 05000327 G.

PDR

\\

-.. -... ~. -. -,.. ~..-.

l

Sc s

, pr 1U.S'. Nuclear Regulatory Commission Page 2 i

January 27,11992-cc (Enclosure):

Mr. D. C. LaBarge,' Project Manager U.S. Nuclear Regulatory Commission

- One White Flint, North.

1155$ Rockv111e Pike Rockville, Maryland 20852 NRC Resident Inspector

- bequoyah Nuclear Plant 2600 Igou Ferry Road

- Soddy Daisy,-Tennessee 37379

~

. Mr. B. A. Wilson, Project Chief U.S.-Nuclear Regulatory Commission Region II 101 Marietta Street

_W. Suite 2900 Atlanta, Georgia 30323 i

.m I

i, i --

l 5

ll

t',

li' l

[

r

- i I,,

g 9

y

,y 9

e

,p i, = ++n r-.

T

. ~.. - - _. - ~.... - - -.. -.. -. ~.

- ~ - -.. -. _ _.-.

. - ~ _. - -

o

+

F.NC1.0GURE E

i Commitment for-NRC Inspection Report Nos.

5_' 327/90-18 and 50-328/90-18 h quoyah Nuclear Plant will implement the necessary Unit 1 modifications or replacements of pre-NF (not manufactured to the requirements of subsect!on NF-l.

of the American Society of Matchanical Engineers code) mechanical-anubbers before-restart from its Cyc16 6 refueling outage.