Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-93-031, NRC Revises Enforcement Policy +
- Press Release-93-029, NRC Staff Schedules Public Workshop on Procurement and Dedication of Commercial Grade Items +
- ML18036B191 +
- ML18036B190 +
- ML18036B189 +
- ML18096B347 +
- ML20044D638 +
- ML20056C178 +
- ML20056C070 +
- 05000298/LER-1993-001, :on 930225,several Design Discrepancies in SW & Reactor Equipment Cooling Sys Identified.Caused by Piping Configuration Error During Plant Const.Mechanical & Electrical Mods Will Be Made +
- ML20266A509 +
- ML20262B513 +
- ML20056C201 +
- ML20056C174 +
- ML20056C173 +
- ML20056C145 +
- ML20056C144 +
- ML20138E053 +
- ML20044H144 +
- IR 05000327/1993007 +
- IR 05000309/1993005 +
- ML20035E187 +
- ML20035B892 +
- IR 05000341/1993005 +
- 05000327/LER-1993-003, :on 930218,reactor Trip Occurred as Result of Exciter Field Breaker Opening & Turbine Tripped on Electrical Relay Protection Signal.Caused by Instructor Failing to Evaluate Risks.Disciplinary Action Taken +
- IR 05000266/1993007 +
- IR 05000445/1993007 +
- IR 05000259/1993006 +
- 05000318/LER-1993-001-01, :on 930220,plant Found to Be in Condition Outside Design Basis When Pressurizer Code Safety Valve Found W/Lift Setpoints Due to Imprecision Associated W/Test Methodology.Valves Setpoints Will Be Verified +
- 05000413/LER-1993-003, :on 930216,discovered That Portion of CS Sys Channels Between Process Instrumentation & Esfa Not Properly Performed Due to Deficient Written Communication.Procedures Revised to Include Circuit Continuity Checks +
- 05000324/LER-1993-002-02, :on 920421,inadvertent ESF Actuation During Surveillance Testing Due to Test Lead Contacting Ground. Fuse Replaced in Accordance W/Work Request/Job Order 93-AGAY1 +
- 05000373/LER-1993-006, :on 930216,Group I Isolation Occurred.Caused by Inadequate Directions within Procedure.Validity of Actuation Verified & Isolation Reset +
- ET-NRC-93-3840, Forwards Response to NRC Request for Addl Info on AP600 from NRC Ltrs of 921116 & 930126.Response to NRC Complete +
- IR 05000282/1993005 +
- ML20035A856 +
- ML20035A130 +
- ML20035A303 +
- ML20035A627 +
- ML20044C252 +
- ML20034J013 +
- ML20035A004 +
- ML20034J016 +
- ML20034J046 +
- ML20035B043 +
- ML20035A355 +
- ML20035A128 +
- ML20035D067 +
- ML20035C638 +
- ML20035A265 +
- ML20035A097 +