MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20202E1611997-12-0101 December 1997 IST Program Third Ten Yr Interval Submittal. W/32 Oversize Drawings ML20211Q1221997-10-14014 October 1997 Rev 22,change 2 to OP-1903.011, Emergency Response Notifications ML20198J8081997-10-14014 October 1997 Rev 28,Permanent Change 2 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20217K3001997-08-0808 August 1997 Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation ML20151K2241997-07-29029 July 1997 Change PC-01,Rev 6 to OP-1903.035, Adm Potassium Iodide ML20148T0441997-07-0101 July 1997 Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof) ML20148T0221997-07-0101 July 1997 Change AP-06 to Rev 6 to Procedure OP-1903.035, Adm Potassium Iodide ML20148T0051997-07-0101 July 1997 Change PC-01 to Rev 32 to Procedure OP-1903.060, Emergency Supplies & Equipment ML20141C5421997-06-17017 June 1997 2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc) ML20148T5391997-06-0101 June 1997 Rev 0 to Third Ten-Year Interval ISI Plan for ANO Unit 1 ML20140C0951997-03-26026 March 1997 Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation ML20137D9271997-03-18018 March 1997 Rev 21-04-00,Change PC-04 to OP-1903.011, Emergency Response/Notifications ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20115D8901996-07-10010 July 1996 Permanent Change (Pc) PC-03 to Rev 11 to OP-1903.065, Emergency Response Facility Tsc ML20107G3981996-04-17017 April 1996 Rev 4 to Procedure 1903.053, Logistical Support, Combining Procedures 1903.054 & 1903.078 in W/Procedure 1903.053 & Deleting Procedures 1903.054 & 1903.078 Completely ML20107G4231996-04-17017 April 1996 Rev 4 to Procedure 1903.078, Emergency Response Support, Deleting Procedure.Info from Procedure Incorporated Into Procedure 1903.053, Logistical Support ML20107G4011996-04-17017 April 1996 Rev 6 to Procedure 1903.054, Addl Personnel, Deleting Procedure.Pertinent Info,Instructions & Requirements from Procedure Will Be Incorporated Into Procedure 1903.053, Logistical Support ML20101E3851996-03-13013 March 1996 Rev 15 to OP-1903.062, Communication Sys OP Procedure ML20101E3571996-03-13013 March 1996 Rev 28 to OP-1903.061, Communication Equipment Test ML20101E3771996-03-13013 March 1996 Rev 8 to OP-1903.066, Emergency Response Facility Osc ML20097B2221996-02-0606 February 1996 Change AP-33 to Rev 33 to OP-1903.010, EAL Classification ML20095F9611995-12-0707 December 1995 Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer Method ML20091K8261995-08-28028 August 1995 Change PC-1 to Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20087B6431995-08-0808 August 1995 Rev 27 to Procedure/Work Plan 1904.002, Offsite Dose Projection Rdacs Computer Method ML20086B3901995-07-0505 July 1995 Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20084U7381995-06-13013 June 1995 Page 14 of Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/Notifications ML20084L9881995-05-25025 May 1995 Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/ Notifications ML20097B2201995-05-16016 May 1995 Change PC-2 to Rev 31 to OP-1903.060, Emergency Supply Equipment ML20083Q2961995-05-16016 May 1995 Rev 13 to Procedure/Work Plan 1905.002, Offsite Emergency Monitoring ML20083Q3071995-05-16016 May 1995 Rev 31 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20083Q2891995-05-16016 May 1995 Rev 6 to Procedure/Work Plan 1903.064, Emergency Response Facility - Cr ML20083L6171995-05-0505 May 1995 Rev 9 to Procedure/Work Plan 1903.034, EOF Evacuation ML20083L6141995-05-0505 May 1995 Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210 ML20083L5941995-05-0505 May 1995 Rev 5 to Procedure/Work Plan 1905.004, EOF Radiological Controls ML20082E2211995-03-31031 March 1995 Rev 1 to Procedure/Work Plan 1903.068, Emergency Response Facility - Emergency News Center ML20081K0331995-03-16016 March 1995 Rev 27 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20078R0771995-02-0909 February 1995 Rev 21 to Procedure/Work Plan 1903.030, Evacuation ML20078G8921995-01-26026 January 1995 Rev 30 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20078J1101995-01-13013 January 1995 Public Version of Rev 14 to Operating Procedure 1903.062, Communication Sys Operating Procedure ML20095J6271995-01-0303 January 1995 Permanent Change (Pc) PC-01 to Rev 11 to Procedure/Work Plan OP-1903.065, Emergency Response Facility Tsc 1999-08-04
[Table view] |
Text
..m ]
ENTERGY OPERATIONS INCORPORATED SET f #[I j ARKANSAS NUCLEAR ONE
. I CONTROLLED DOCUMENTS TRANSMITTAL 05/11/93 SEND TO: //Ars RETURN TO: ARRANSAS NUCLEAR ONE DOCUMENT CONTROL ROUTE 3 BOX 137G RUSSELLVILLE, ARKANSAS 72801 THIS FORM TRANSMITS THE FOLLOWING APPROVED DOCUMENT UPDATE:
ANO-1 [ ]
REISSUE PAGE B-18 ANO-2 [ ]
GENERIC [ X]
REISSUE [ ]
DOCUMENTS:
] LICENSING DIRECTIVES I ]
AND STATION POLICY [
l
[ ] MAIN
T. PROCEDURE
WRITERS GUIDE I ]
i ALTERNATE SHUTDOWN BASIS DOCUMENT
[ ] 0FFSITE DOSE CALCULATION MANUAL I ]
l ANI/MAULU
[ ] ON-LINE LEAK REPAIR I }
l AOP TECHNICAL GUIDELINES
[ ] OPERATION PROCEDURE WRITERS GUIDE [ ]
, B&W QC FOR NUCLEAR REPAIRS [ ]
B&W OWNERS GROUP GENERIC E0P BASES [ ] OPERATIONS GUIDE l I ]
BASIS DOCUMENT ALTERNATE SHUTDOWN [ ] PMEE'S
[ ] PRE-FIRE PLAN [ ]
l CLAIMS 6 RISKS MANUAL COMPONENT DATA BASE RULE BOOK { ] PRINCIPLES NANAGE NUCLEAR PERSONNEL I ]
! :I ]
CONFIRMATORY ORDERS [ ] QA OPERATIONS MANUAL
{ ] QAO's [ ]
CONSUMABLE CHEMICAL MATERIAL LIST (CCML)
[ ] QAD's [ ]
COMPONENT IDENTIFICATION DESK GUIDE
[ ] QCO's I ]
E0P SETPOINT DOCUMENT
[ ] QAP's I ]
EMERGENCY PROCEDURE GUIDELINE CEN-152 ,
[ ] RADIATION SAFETY PROGRAM [ ]
E0P BASES DOCUMENT
[ ] RADIOLOGICAL EMERG. RESPONSE PLAN I ]
EOP TECHNICAL GUIDELINES EMERGENCY PLAN [ X] STORES OPERATION MANUAL I l l ] SUPPORT AGREEMENTS I ]
i ENVIRONMENTAL QUAL. MASTER LIST
! ENTERGY OPERATION MGMT MANUAL (VOL. II) [ ] TITLE 49 CFR I l
{ ] PIPING & INSTRUMENT DIAGRAMS I ]
EMERGENCY TELEPHONE DIRECTORY
[ ] SAR (SAFETY ANALYSIS REPORT) I ]
EMERGENCY RESOURCES MANUAL
{ ] SAR PEOPRIETARY I ]
) HOLDCARD C010 UTER INSTRUCTION GUIDE
[ ~] SER (SAFETY EVALUATION REPORT) [ ]
l INDUSTRIAL SECURITY PLAN
{ ] TECH SPECS I ]
l INDEX (STANDARDS & PROCEDURES) l 180G75 l
SIGNATURE DATE i f
l PLEASE SIGN AND RETURN THIS SHEET ] 9 g
! 9305200084 930318 L i ' #} h I(
PDR ADOCK 05000313 "I F PDR
(
O O O .
i, TABLE B-1 (Continued)
GROUP' POSITION / TITLE ON-SHIFT AVAILABLE5 AVAILABLE5 IN 30 MIN IN 60 MIN
~ Maintenance Electrical Maintenance / Instrument and l' 18 18 Control (I&C) Technician l' Mechanic l' - 2 Engineering Core / Thermal Hydraulics Engineer - 1 Electrical Engineer - -
1 Mechanical Engineer - -
1 Security Security Personnel All per Security Plan Firefighting - Fire Brigade 1.ocal Support
. per Technical Specifications First Aid and Rescue - 2 Local Support Operations
' In accordance with Section 6 of the Technical Specifications for each unit, the shift crew composition may be less than the minimum number of operators (licensed and non-licensed) shown for a period of time not to exceed two hours in order to accomodate unexpected absense of on-duty shift crew memisers, provided'immediate action is taken to restore the shift crew composition to within the minimum nimber of operators.
2 The minimum staff for a unit which is in cold shutdown will be one Senior Reactor Operator, one Reactor Operator, and one Non-Licensed Operator for that unit.
Revision 15 March 18,.1993 B-18 O